Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted February 19, 2025, with 15 permits through September 28, 2026, declaring $529,073 of work. Contractor on record: Static Energy, Inc.
Get new commercial permits near 98109 or Seattle, free weekly email
Construct alterations to existing commercial pier per plan. Existing shoreline exemption under 6762427-EX.
Seattle permit records name Static Energy, Inc, Convergint Technologies and Western Neon as the contractors on this project, among 7 contractors in all.
15 permits issued Feb 19 – Sep 28, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7164719-EL Electrical · Electrical J00287961 Main panel located in the main electrical room and one annunciator in the elevator lobby. Panel upgrade from EST3 to EST4 Status: Issued | Convergint Technologies | — | |
| applied Jul 9 | #7148995-ME Mechanical · Trade Install 1504 CFM HVAC system, per plan Status: Issued | Not published | $68K |
| applied Aug 20 | #7157743-SB Sign, Awning and Canopy · Trade install one set of flush mounted, LED illuminated letter boxes (Analog Coffee) Status: Completed | Western Neon | $15.8K |
| applied Jul 6 | #7134658-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Completed | Not published | $90K |
| applied Aug 12 | #7157356-FS Fire Sprinkler and Suppression · Trade A captive aire tank system is being installed at this location. We are doing the final installation of appliance protection, system testing and the fire final. Status: Issued | Not published | $3K |
#7157821-EL Electrical · Electrical Provide and install (1) new 100 Amp Fused Service Disconnect at the new RTU. Includes Fuses. Connect the new RTU to the Service Disconnect. Provide and install a new 480-volt 3 phase 70 Amp Circuit Braker and install it in the existing Panel Board. Status: Completed | Static Energy, Inc | — | |
#7150946-EL Electrical · Electrical J00300067 - Fire alarm coverage for new room layout. (1) heat, (3) smokes, hood monitoring and notification device added. Status: Issued | Convergint Technologies | — | |
#7147398-EL Electrical · Electrical TI of what used to be a Starbucks that is turning into a new coffee shop. Relocating circuitry for new equipment layout. Status: Issued | Not published | — | |
#7108106-EL Electrical · Electrical LOAD BANK TESTING ON BACK UP ELECTRIC GENERATOR - SR00117689 Status: Completed | Pacific Power Group | $450 | |
| applied Aug 8 | #7100497-EL Electrical · Electrical Generator install per engineered drawings [8/22/2025 BGO - Approved Plan Set for Generator Install supplying Emergency and Optional Standby Loads] 8/17/2026 jnl renewal Status: Issued | Holaday Parks Inc | $100K |
#7101624-EL Electrical · Electrical Install power to new SF-2, Disconnect/Reconnect Power and install controls for RTU-2 & 3. Status: Completed | Static Energy, Inc | $20K | |
| applied Jun 9 | #7070926-ME Mechanical · Trade Replace two gas pack units with heat pumps, per plan. Status: Completed | UMC, Inc. | $17.5K |
| applied Apr 16 | #7080899-CY Conveyance · Trade Decommission the 2-stop Otis 211 hydraulic elevator EQP-SI-08442 / EQP-CY-04007 (2021 SBC=2019 A17.1=2023 NCE/SEC=2020 A18.1) Status: Completed | Elevator Support Company | $5.5K |
#7080894-EL Electrical · Electrical This project is to install a new HVAC unit along with programming in (3) duct detectors to the FACP. (PJR-04-20-2026 Extended permit out for EC for 1 month.)[5/19/2026 JBC Extended Permit for 1 Month] Status: Completed | Static Energy, Inc | $11K | |
| applied Dec 2 | #7050090-CN Addition/Alteration · Building Construct alterations to existing commercial pier per plan. Existing shoreline exemption under 6762427-EX. Status: Issued | Not published | $198K |