Issued Oct 28
$50K
INSTALLATION OF TEMPORARY DRY STANDPIPE SYSTEM FOR CONSTRUCTION PHASES. FILED IN CONJUNCTION WITH ALTERATION TYPE 1, JOB321599855
Get ProEvery project in every city · from $33/mo
Get Pro11,454 commercial and multifamily projects permitted in the last 90 days, worth $10.4B. New permits added daily.
Newest permit issued October 28, 2026
Latest projects
Issued Oct 28
$50K
INSTALLATION OF TEMPORARY DRY STANDPIPE SYSTEM FOR CONSTRUCTION PHASES. FILED IN CONJUNCTION WITH ALTERATION TYPE 1, JOB321599855
Issued Oct 28
$20K
REMOVAL OF EXISTING SPRINKLER SYSTEM FOR DEMOLITION AND CONSTRUCTION PHASES OF FULL RENOVATION. FILED IN CONJUNCTION, JOB# 321599855 & B00491449
Issued Oct 28
$120M
Herewith filing to INSTALL STEA &CONDE. PIPING FROM MER ECW39 TO PUMP AND TANK ROOM ECW39.2.INST. HIGH TO MED.PRESSURE STEAM REDUC STATION AND HIGHTO LOW PRESS. STEAM…
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL2) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW…
Providing full accessibility to the school. Work includes Auditorium ramp renovation, front entrance concrete renovation, bathroom renovations, and the addition of an area of…
| Week of | Permits |
|---|---|
| Jul 27 | 213 |
| Aug 3 | 1,231 |
| Aug 10 | 1,234 |
| Aug 17 | 1,027 |
| Aug 24 | 1,169 |
| Aug 31 | 1,239 |
| Sep 7 | 1,032 |
| Sep 14 | 1,274 |
| Sep 21 | 1,242 |
| Sep 28 | 1,260 |
| Oct 5 | 1,238 |
| Oct 12 | 1,076 |
| Oct 19 | 1,328 |
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
By declared value, last 90 days.
Issued Sep 23 · 13 permits
$654M
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Issued Sep 23 · 6 permits
$351M
FOUNDATION DESIGN TO FACILITATE CONSTRUCTON OF FITNESS CENTER AS EXTENSION IN EXISTING BUILDING
Permits come from the city's Socrata open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 28, 2026.
Related permits on the same job are grouped into one project, and non-construction permits are filtered out. On New York City permits, 100% name a contractor and 84% declare a project value.
INSTALLING A BETA MAX HOIST IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
STRUCTURAL DESIGN TO FACILITATE NEW FIVE (5) STORY MIXED USE BUILDING. TWENTY-ONE (21) DWELLING UNITS WITH COMMUNITY ON THE GROUND AND PARKING SPACES @ CELLAR.
HORIZONTAL AND VERTICAL ENLARGEMENT TO THE EXISTING TWO-STORY BUILDING. PROPOSED 8-FAMILY 4-STORY W/CELLAR AND PENTHOUSE RESIDENTIAL BUILDING TO MEET NEW BUILDING REQUIREMENTS AS…
PROPOSED FOUR (4) STORY WITH PENTHOUSE RESIDENTIAL BUILDING.
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 28 | NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL2) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW… | commercialBuilding, HVAC / Mechanical | $10M | J.E. Levine Builder Inc |
| Oct 28 | Providing full accessibility to the school. Work includes Auditorium ramp renovation, front entrance concrete renovation, bathroom renovations, and the addition of an area of… | commercialBuilding, HVAC / Mechanical, Plumbing | $1.9M | Contractor with ProPro |
| Oct 28 | INSTALLING A BETA MAX HOIST IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | multifamilyBuilding | — | Contractor with Pro |
| Oct 28 | STRUCTURAL DESIGN TO FACILITATE NEW FIVE (5) STORY MIXED USE BUILDING. TWENTY-ONE (21) DWELLING UNITS WITH COMMUNITY ON THE GROUND AND PARKING SPACES @ CELLAR. | commercialBuilding | $335K | Contractor with Pro |
| Oct 28 | HORIZONTAL AND VERTICAL ENLARGEMENT TO THE EXISTING TWO-STORY BUILDING. PROPOSED 8-FAMILY 4-STORY W/CELLAR AND PENTHOUSE RESIDENTIAL BUILDING TO MEET NEW BUILDING REQUIREMENTS AS… | multifamilyBuilding, Fire protection, HVAC / Mechanical, Other, Plumbing | $3M | Contractor with Pro |
| Oct 28 | PROPOSED FOUR (4) STORY WITH PENTHOUSE RESIDENTIAL BUILDING. | multifamilyBuilding, Other | $1.6M | Creative Builders& Devel |
11,445 more projects in the last 90 days
Unlock all 11,451 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All New York City projects →
Issued Oct 1 · 8 permits
$171M
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY…
Issued Oct 15 · 7 permits
$166M
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY…
Issued Sep 28 · 7 permits
$166M
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY…
1470 Amsterdam Avenue Manhattan
Issued Aug 3 · 7 permits
$166M
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY…
Issued Sep 16 · 7 permits
$159M
Filing to convert existing 34 high-rise office building to mixed used residential as per plans.
Issued Aug 12 · 6 permits
$156M
RENOVATION OF 20-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF EXISTING LOBBY, KITCHEN AND BATHROOM THROUGHOUT, INSTALLATION OF NEW ENTRY…
Commercial & multifamily permits, last 90 days.