Issued Oct 28
$2.4M
All work is limited to open air concrete garage area. No scheduled work within the building/hotel - Concrete spalling repairs to columns and parking deck with temp shoring within…
Get ProEvery project in every city · from $33/mo
Get Pro103 commercial and multifamily projects permitted in the last 90 days, worth $479M. New permits added daily.
Newest permit issued October 28, 2026
Browse by trade
Latest projects
Issued Oct 28
$2.4M
All work is limited to open air concrete garage area. No scheduled work within the building/hotel - Concrete spalling repairs to columns and parking deck with temp shoring within…
Issued Oct 28
$35K
this space currently is restaurant, adding a Sushi bar, and repaint the wall, no other change. no Plumbing and electrical change or add on.
Issued Oct 28
$157K
All Work done on second floor right side as outlined in plans.Refresh of current millwork that is in the space new doors / hardware. Additional 3 cabinets and sinks going into 3…
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
COMMERCIAL (BANK) INTERIOR LEVEL 2 ALTERATION OF A SINGLE STORY SPACE WITH NO BASEMENT.INTERIOR SCOPE OF WORK INCLUDES:FURNITURE, EQUIPMENT, FINISHES WITH LIMITED INTERIOR WALL…
$275K
Remove non-structural interior components of home. Update all wiring and plumbing to code to accomodate new cabinets, appliances, plumbing fixtures and HVAC. New board,…
| Week of | Permits |
|---|---|
| Jul 27 | 0 |
| Aug 3 | 12 |
| Aug 10 | 16 |
| Aug 17 | 6 |
| Aug 24 | 2 |
| Aug 31 | 12 |
| Sep 7 | 4 |
| Sep 14 | 7 |
| Sep 21 | 10 |
| Sep 28 | 10 |
| Oct 5 | 8 |
| Oct 12 | 15 |
| Oct 19 | 12 |
Source: building permit records from Cambridge's Socrata open-data portal, checked daily. Data through . How we count
By declared value, last 90 days.
Issued Aug 11
$221M
Fit-out of core & shell spaces for office and laboratory uses, conference center/assembly, employee cafeteria, fitness. Childcare and education uses included on the ground floor.
Issued Sep 3 · 14 permits
$54.4M
Modifications to existing technical office on building constructed as of right in 1962. Renovation of interior tenant spaces including mechanical upgrades. Add access door with…
Permits come from the city's Socrata open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 28, 2026.
$387K
This Project involves the construction required for the interior fit-out of approximately 5,200 GSF on the second floor of 14 Story Street for HCP office space. The existing…
$13.1M
Renovation of the 3rd Floor including the ballrooms, pre-function space, meeting rooms and the Regatta Bar. A small expansion of the existing 2nd floor rooftop will made into an…
$31.1M
Interior Renovations of the 3rd and 4th floors of the needham wing including select new finishes such as ceilings, flooring, paint, millwork as well as select MEP Relacements.
Perform masonry repairs at South exterior wall of first floor common area and loading dock. Install new storefront windows and entry doors at first and second floor common area…
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 26 | COMMERCIAL (BANK) INTERIOR LEVEL 2 ALTERATION OF A SINGLE STORY SPACE WITH NO BASEMENT.INTERIOR SCOPE OF WORK INCLUDES:FURNITURE, EQUIPMENT, FINISHES WITH LIMITED INTERIOR WALL… | commercialBuilding | $1.1M | Contractor with ProPro |
| Oct 22 | Remove non-structural interior components of home. Update all wiring and plumbing to code to accomodate new cabinets, appliances, plumbing fixtures and HVAC. New board,… | multifamilyBuilding | $275K | Contractor with Pro |
| Oct 22 | This Project involves the construction required for the interior fit-out of approximately 5,200 GSF on the second floor of 14 Story Street for HCP office space. The existing… | commercialBuilding | $387K | Contractor with Pro |
| Oct 22 | Renovation of the 3rd Floor including the ballrooms, pre-function space, meeting rooms and the Regatta Bar. A small expansion of the existing 2nd floor rooftop will made into an… | commercialBuilding | $13.1M | Contractor with Pro |
| Oct 22 | Interior Renovations of the 3rd and 4th floors of the needham wing including select new finishes such as ceilings, flooring, paint, millwork as well as select MEP Relacements. | commercialBuilding | $31.1M | Walsh Brothers, Inc |
| Oct 22 | Perform masonry repairs at South exterior wall of first floor common area and loading dock. Install new storefront windows and entry doors at first and second floor common area… | commercialBuilding | $1.1M | Robert K Purdy Purdy Construction |
94 more projects in the last 90 days
Unlock all 100 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All Cambridge projects →
Issued Oct 22 · 9 permits
$31.1M
Interior Renovations of the 3rd and 4th floors of the needham wing including select new finishes such as ceilings, flooring, paint, millwork as well as select MEP Relacements.
Issued Oct 15 · 4 permits
$14.1M
Fitout & retrofit of approx 20K Sqft of Lab Space with MEP scopes and select architectural rework of conference rooms & reception space.
Issued Oct 22
$13.1M
Renovation of the 3rd Floor including the ballrooms, pre-function space, meeting rooms and the Regatta Bar. A small expansion of the existing 2nd floor rooftop will made into an…
Issued Sep 28 · 7 permits
$12.2M
This project focuses on a renovation existing laboratory and office spaces located on the first floor of the Harvard Biological Laboratories Building, to provide new laboratory…
Issued Oct 14 · 4 permits
$11.3M
The build is a +/-17,500 SF interior fit-out on the 6th floor. No make-safe or demolition is required as part of this project. Scope includes new finishes throughout, partition…
Issued Sep 3 · 5 permits
$7.7M
Replace existing uninterruptible power systems (UPS) with new 400KW UPS (PenthouseC) and 250KW UPS (Level 4B) with upgrades to the vertical power distribution through the…
Commercial & multifamily permits, last 90 days.
Related permits on the same job are grouped into one project, and non-construction permits are filtered out. On Cambridge permits, 97% name a contractor and 100% declare a project value.