Get ProEvery project in every city · from $79/mo
Get Procommercial project · Cambridge, MA
Commercial General Building work permitted February 24, 2025, with 5 permits through September 3, 2026, declaring $7,664,230 of work. Contractor on record: Wise Construction.
Replace existing uninterruptible power systems (UPS) with new 400KW UPS (PenthouseC) and 250KW UPS (Level 4B) with upgrades to the vertical power distribution through the existing stackedelectrical rooms. ( C wing and B wing) . New structural concrete pads and structural reinforcement,architectural modifications to room/alcove finishes and nearby elements, new raised interior floor platformsfor UPS breaker access reach, interior ceilings /walls updated to related scope to accommodate demolitionand new HVAC, fire protection and electrical work.
Cambridge permit records name Wise Construction, Walsh Brothers Inc and Columbia Construction Company as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Feb 24 – Sep 3, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Aug 12 | #1225625 Building: Alteration and Addition Repairs of the parking level slabs of the existing parking structure. Status: Active | Wise Construction | $2.5M |
| applied Jul 15 | #1221132 Building: Alteration and Addition Project involves updates for approximately 2,400 SF of existing laboratory space to accommodate new laboratory furniture and laboratory utility adjustments required for the new equipment layout. Project is located on the second floor of the 250 Massachusetts Ave building in Cambridge, MA. Status: Active | Wise Construction | $535K |
| applied Nov 6 | #1189562 Building: Alteration and Addition The scope of work includes a majority interior renovation of the AV Control Room, as well as AV upgrades within the existing auditorium. The alterations do not impact or change the construction type of occupancy class/ use group. Additional scope of work for this project include minimal… Status: Active | Wise Construction | $1.1M |
| applied Jan 15 | #1148741 Building: Alteration and Addition Replace existing uninterruptible power systems (UPS) with new 400KW UPS (PenthouseC) and 250KW UPS (Level 4B) with upgrades to the vertical power distribution through the existing stackedelectrical rooms. ( C wing and B wing) . New structural concrete pads and structural… Status: Active | Walsh Brothers Inc | $3.1M |
| applied Jan 2 | #1147437 Building: Alteration and Addition Update two small office suites and workstations on the 6th floor, including the removal of enclosed offices, installation of new ceiling in one suite, and updates to furniture and finishes. Status: Active | Columbia Construction Company | $381K |
In Cambridge, biggest first.