Glossary
Building permit glossary
The terms you’ll see on building permit records and on our city pages, in plain English.
- Building permit
- Written permission from a city or county to build, alter, repair or demolish a structure. The permit record names the address, the scope of work, usually the declared value and the contractor, and it moves through statuses from application to issue to final inspection.
- Commercial permit
- A permit for work on a non-residential property: offices, retail, restaurants, warehouses, industrial buildings, hotels, schools, hospitals and similar. On US Permit Search, “commercial and multifamily” permits are the ones a commercial contractor can bid on. How we classify permits →
- Multifamily
- Residential buildings with five or more units (apartments, condominiums). Most building codes treat them like commercial buildings, and they are permitted and built by commercial contractors.
- Trade permit
- A permit for one trade's work (electrical, plumbing, mechanical/HVAC, fire protection, roofing), usually pulled by the licensed subcontractor doing it. A large job has a building permit plus many trade permits. Permits by trade →
- MEP
- Mechanical, electrical and plumbing: the building systems trades, often permitted and bid together on commercial jobs.
- Permit type
- The city's category for a permit (for example Building, Electrical, Mechanical, Demolition or Sign). Names differ city to city; we map each into one list of trades.
- Work class
- The kind of work within a permit type: new construction, addition, alteration or remodel, repair, change of use, demolition. Many cities publish it; it is the quickest way to tell new buildings from renovations.
- Declared valuation
- The construction cost the applicant states on the permit application, used by many cities to calculate fees. It is an estimate, not a contract amount or market value, and some cities don't collect it for trade permits.
- Application date
- The day the permit application was filed. The time from application to issue is the review time, which our permit guides report as a median for each city.
- Issued date
- The day the city issued the permit and work could legally start. Our pages count permits and projects by issue date.
- Finaled
- A permit whose work passed final inspection and was closed out by the city. Statuses such as “Final”, “Completed” or “Signed-off” mean the same thing.
- Plan review
- The city's check of construction drawings against building, fire and zoning codes before a permit is issued. Commercial projects nearly always need it; it accounts for most of the time between application and issue.
- Express (over-the-counter) permit
- A permit issued the same day or within days, without full plan review, for simple, well-defined work such as equipment change-outs, minor repairs or signs.
- Certificate of occupancy
- The document a city issues when a new building, or one whose use changed, is safe to occupy. It comes after the building permit's work is finaled.
- General contractor
- The company responsible for the whole construction job, usually the one named on the building permit. It hires the subcontractors who pull the trade permits.
- Tenant improvement (TI)
- Interior work to fit out commercial space for a tenant: walls, ceilings, lighting, HVAC, finishes. TI permits are one of the most common commercial permit types in large cities.
- BBL and PIN
- Parcel identifiers: New York City's Borough-Block-Lot number and Cook County's Property Index Number. We use them to look up a building's land-use class when a permit doesn't say whether the property is commercial.
- Project (on US Permit Search)
- All the permits for one construction job, grouped by the city's project or job number, or by building address where the city has none. How we group permits →