Issued Oct 28
$32.2K
2/f: replace tub, vanity & toilet. change out tile. add exhaust fan.
Get ProEvery project in every city · from $33/mo
Get Pro1,283 commercial and multifamily projects permitted in the last 90 days, worth $2.3B. New permits added daily.
Newest permit issued October 28, 2026
Latest projects
Issued Oct 28
$32.2K
2/f: replace tub, vanity & toilet. change out tile. add exhaust fan.
Issued Oct 28 · 3 permits
$55K
apt 7: update bathroom with shower. move an electrical panel from closet and update washer/dryer to closet.
Issued Oct 28 · 29 permits
$6.1M
11th floor: interior t.i. ; demolition and construction of non-structural partitions, new lighting, finishes, and installation/anchoring of phone booths. mep and life safety…
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
$1.4M
concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing.
$461K
interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modifications
| Week of | Permits |
|---|---|
| Jul 27 | 35 |
| Aug 3 | 146 |
| Aug 10 | 148 |
| Aug 17 | 149 |
| Aug 24 | 170 |
| Aug 31 | 151 |
| Sep 7 | 114 |
| Sep 14 | 158 |
| Sep 21 | 157 |
| Sep 28 | 153 |
| Oct 5 | 133 |
| Oct 12 | 124 |
| Oct 19 | 155 |
Source: building permit records from San Francisco's Socrata open-data portal, checked daily. Data through . How we count
By declared value, last 90 days.
Issued Sep 28 · 12 permits
$134M
this permit# 202411215452 is only for the 201 market rate housing units and for the mixed occupancies: r-2,a-3,m,e. 22 story over 1 basement, type 1a, fully sprinklered mixed use…
Issued Oct 22 · 98 permits
$76.6M
31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture…
Permits come from the city's Socrata open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 28, 2026.
$102K
interior remodel of (e) retail and office. removal of (1) exterior door. new non structural work, (n) break areas, (n) accessible restroom.
$12.7M
6th fl, sector 2b ti for mri suite
$455K
unit 409: drywall, insulation, texture, paint, cabinets and flooring. no new framing. new electrical and plumbling. common hallway: drywall, insulation, texture, paint, cabinets,…
$8K
repair limited non-structural dryrot siding and replace approx. 400 sq ft of deteriorated mood siding at the rear, non-street facing wall. new siding to match, from wood to…
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 28 | concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing. | multifamilyBuilding | $1.4M | Camp Roofing Ltd Dba Camp Construction |
| Oct 28 | interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modifications | commercialBuilding | $461K | Aaa Restaurant Fire Control Llc |
| Oct 28 | interior remodel of (e) retail and office. removal of (1) exterior door. new non structural work, (n) break areas, (n) accessible restroom. | commercialBuilding | $102K | Contractor with ProPro |
| Oct 28 | 6th fl, sector 2b ti for mri suite | commercialBuilding | $12.7M | Siemens Industry, Inc. |
| Oct 28 | unit 409: drywall, insulation, texture, paint, cabinets and flooring. no new framing. new electrical and plumbling. common hallway: drywall, insulation, texture, paint, cabinets,… | multifamilyBuilding | $455K | Contractor with Pro |
| Oct 28 | repair limited non-structural dryrot siding and replace approx. 400 sq ft of deteriorated mood siding at the rear, non-street facing wall. new siding to match, from wood to… | multifamilyBuilding | $8K | Contractor with Pro |
1,274 more projects in the last 90 days
Unlock all 1,280 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All San Francisco projects →
Issued Sep 9
$67.3M
phase ii: mayoral ed 17-02 & 13-01: erect type i-a, a 23-story with 233 residential units with 2-stories above-grade parking.
Issued Oct 20 · 41 permits
$64.4M
level 1 thru level 4 & roof only: tenant improvement.new partitions, ceiling, finishes, millwork & lighting. mep included.new communicating stair from level 1 thru 6. with…
Issued Oct 20 · 110 permits
$64M
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in…
Issued Oct 27 · 38 permits
$63.1M
converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered…
Issued Oct 21 · 98 permits
$54.1M
33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom…
Issued Aug 28 · 21 permits
$52.1M
ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will…
Commercial & multifamily permits, last 90 days.
Related permits on the same job are grouped into one project, and non-construction permits are filtered out. On San Francisco permits, 83% name a contractor and 82% declare a project value.