Commercial General Building, Sign work permitted November 8, 2024, with 110 permits through October 20, 2026, declaring $64,049,299 of work. Contractor on record: Hp Build.
Get new commercial permits near 94111 or San Francisco, free weekly email
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work
San Francisco permit records name Hp Build, Pyro-Comm Systems, Inc. and Source Planning And Construction Inc as the contractors on this project, among 18 contractors in all.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor110 permits issued Nov 8 – Oct 20, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 20 | #202610209658 otc alterations permit 25/f: removal of stand alone wall in pantry. removal & replacement of millwork & associated finishes. wall covering installation at reception. Status: Issued | Contractor with Pro | $140K |
| applied Sep 29 | #202609298784 otc alterations permit 10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884 Status: Issued | Source Planning And Construction Inc | $35K |
| applied Sep 30 | #202609308804 otc alterations permit 46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494 Status: Issued | Source Planning And Construction Inc | $35K |
| applied Sep 30 | #202609308800 otc alterations permit 39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369 Status: Issued | Source Planning And Construction Inc | $35K |
| applied Sep 29 | #202609298743 otc alterations permit 13th floor - 2 way com system alteration. add 2 call stations, 2 way-comm signature. ref pa 202511260514 Status: Reinstated | Pyro-Comm Systems, Inc. | $12K |
| applied Sep 18 | #202609188315 otc alterations permit 45th floor: reference#202607305820 mechanical and electrical for the project Status: Complete | Hp Build | $44.3K |
| applied Aug 27 | #202608277286 otc alterations permit 47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits. Status: Issued | Source Planning And Construction Inc | $202K |
| applied Aug 4 | #202608046053 otc alterations permit revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only). Status: Issued | Hathaway Dinwiddie Co. | $3K |
| applied Jul 27 | #202607275593 otc alterations permit 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. Status: Issued | Skyline Construction | $45K |
| applied Jul 22 | #202607225369 otc alterations permit 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 Status: Issued | Source Planning And Construction Inc | $202K |
| applied Jun 25 | #202606253884 otc alterations permit 10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491 Status: Issued | Not published | $202K |
| applied Jul 22 | #202607225371 otc alterations permit 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 Status: Issued | Source Planning And Construction Inc | $202K |
| applied Jul 30 | #202607305820 otc alterations permit 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072 Status: Complete | Hp Build | $254K |
| applied Jul 28 | #202607285685 otc alterations permit 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 Status: Issued | Bcci Construction Company | $202K |
| applied Jul 17 | #202607175188 otc alterations permit 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. Status: Issued | Bcci Construction Company | $751K |
| applied Jun 29 | #202606294113 otc alterations permit 15/f - ste 1500: deferred mep work for permit# 202604018658 Status: Issued | Dpr Construction A | $320K |
| applied Jul 10 | #202607104843 otc alterations permit 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. Status: Issued | Hathaway Dinwiddie Co. | $5K |
| applied Jun 18 | #202606183505 otc alterations permit 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing Status: Complete | Skyline Construction | $1.6M |
| applied Jun 1 | #202606012221 otc alterations permit floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. Status: Issued | Skyline Construction | $38K |
| applied Jun 18 | #202606183494 otc alterations permit 46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes Status: Issued | Source Planning And Construction Inc | $250K |
| applied Jun 5 | #202606052646 otc alterations permit 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) Status: Complete | Hp Build | — |
| applied Apr 1 | #202604018658 otc alterations permit 15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately. Status: Issued | Dpr Construction A | $2M |
| applied May 1 | #202605010540 otc alterations permit 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control Status: Issued | Hathaway Dinwiddie Co. | $399K |
| applied May 1 | #202605010517 otc alterations permit 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes Status: Issued | Hathaway Dinwiddie Co. | $399K |
| applied May 22 | #202605221781 otc alterations permit 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 Status: Issued | Hathaway Dinwiddie Co. | $15K |
| applied Apr 7 | #202604079019 otc alterations permit 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th Status: Issued | Hathaway Dinwiddie Co. | $144K |
| applied Apr 21 | #202604219822 otc alterations permit 25/fl- ref 202602025031 to include mep Status: Complete | Hp Build | $83.5K |
| applied Apr 17 | #202604179616 otc alterations permit 43rd floor. modifyting existing fire alarm sytem install 2 pull sstation to the 2-way-comm emergency system. no t.i. involved. Status: Complete | Pyro-Comm Systems, Inc. | $12K |
| applied Apr 10 | #202604109205 otc alterations permit 28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088 Status: Complete | Hp Build | $460K |
| applied Apr 7 | #202604079037 otc alterations permit revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps. Status: Issued | Hathaway Dinwiddie Co. | $68K |
| applied Apr 15 | #202604159434 otc alterations permit fire alarm voluntary 2-way replacement for like for like basis. Status: Issued | Pyro-Comm Systems, Inc. | $42K |
| applied Mar 11 | #202603117335 otc alterations permit 9th flr: suite 925: mech + electrical for 202512051085 Status: Complete | Hp Build | $710K |
| applied Mar 13 | #202603137519 otc alterations permit 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. Status: Complete | Hp Build | $80K |
| applied Mar 13 | #202603137517 otc alterations permit 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. Status: Complete | Hp Build | $80K |
| applied Mar 2 | #202603026741 otc alterations permit 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting Status: Issued | Bcci Construction Company | $1M |
| applied Dec 1 | #202512010611 otc alterations permit 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep Status: Issued | Hathaway Dinwiddie Co. | $6.6M |
| applied Dec 8 | #202512081180 otc alterations permit new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. Status: Issued | Hathaway Dinwiddie Co. | $1M |
| applied Nov 26 | #202511260514 otc alterations permit 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep. Status: Issued | Hathaway Dinwiddie Co. | $8.8M |
| applied Dec 3 | #202512030863 otc alterations permit 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep Status: Issued | Hathaway Dinwiddie Co. | $6.5M |
| applied Dec 3 | #202512030869 otc alterations permit 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work Status: Issued | Hathaway Dinwiddie Co. | $9.7M |
| applied Feb 6 | #202602045227 additions alterations or repairs 24th/fl: relocate 181 upright sprinklers on the 24th floor for demo. Status: Complete | Golden Gate Fire Protection Inc | $43.5K |
| applied Feb 2 | #202602025031 otc alterations permit 25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions Status: Complete | Hp Build | $120K |
| applied Dec 5 | #202512051088 otc alterations permit 28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred. Status: Complete | Hp Build | $919K |
| applied Dec 5 | #202512051085 otc alterations permit 9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred. Status: Complete | Hp Build | $1.1M |
| applied Nov 26 | #202511260531 otc alterations permit 43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain) Status: Complete | Bcci Construction Company | $8M |
| applied Nov 19 | #202511199932 otc alterations permit fire alarm as built 2 ceiling strobes to be added to the phone booths. ref pa 202506138659 Status: Complete | Pyro-Comm Systems, Inc. | — |
| applied Nov 5 | #202511058999 otc alterations permit g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835 Status: Complete | Hp Build | $13.1K |
| applied Oct 6 | #202509155263 additions alterations or repairs 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 Status: Issued | Source Planning And Construction Inc | $3K |
| applied Oct 23 | #202510237960 otc alterations permit 34th fl. fire alarm 1 2-way call station: 1 remote power supply, 23 ceiling speaker strobes, 10 strobes,2 call stations, 39 smoke detectors, 6 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 202505206899 Status: Complete | Pyro-Comm Systems, Inc. | $67.7K |
| applied Oct 23 | #202510237967 otc alterations permit 35th fl. fire alarm 1-2 way 1 smoke supply 31 ceiling speaker strobes, 10 strobes, 2 call stations, 39 smoke detectors, 5 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 2025-0519-6756 Status: Complete | Pyro-Comm Systems, Inc. | $117K |
| applied Sep 18 | #202509185644 otc alterations permit 35/f: deferred submittal of structural drawings ref#2025-0519-66756 Status: Complete | Bcci Construction Company | $150K |
| applied Sep 18 | #202509185642 otc alterations permit 35/f:deferred submittal at mep ref#202505196756 Status: Complete | Bcci Construction Company | $1.7M |
| applied Sep 18 | #202509185632 otc alterations permit 34th floor: deferred submittal of mep. ref pa #202505206899 Status: Complete | Bcci Construction Company | $1.7M |
| applied Sep 12 | #202509125221 otc alterations permit revision 202507181106- structural attachment detail Status: Complete | Brandex Corp | — |
| applied Sep 10 | #202509104983 otc alterations permit 35th fl- ref pa # 2025-0519-6756 add 43 relocate 179 fire sprinkler ti. job #25-652 Status: Complete | Ayoob & Peery Plumbing Co Inc | $138K |
| applied Sep 10 | #202509104965 otc alterations permit 34th fl: add 26, relocate 209, fire spprinkler per ti . job 25-652, ref 202505206899 Status: Complete | Ayoob & Peery Plumbing Co Inc | $146K |
| applied Aug 14 | #202508143032 otc alterations permit the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710. Status: Issued | Source Planning And Construction Inc | — |
| applied May 19 | #202505196756 otc alterations permit 35th fl - interior office ti. new non load bearing partitions, ceilings, doors & finishes. mep deferred Status: Complete | Bcci Construction Company | $3.3M |
| applied Jul 18 | #202507181106 sign - erect suite 1050:to erect non electrical and non-illuminated blade sign. ( avotoasty) project includes 2 identical signs. sign a and sign b Status: Complete | Brandex Corp | $3K |
| applied May 20 | #202505206899 otc alterations permit 34th ti (n) non-structural partitions, lighting, ceiling, finishes, mep; mep structural deferred Status: Complete | Bcci Construction Company | $3.3M |
| applied Jul 9 | #202507090428 otc alterations permit 25th/f: partial t.i. of a single suite of an e) high rise Status: Issued | Gci, Inc | $195K |
| applied Jul 3 | #202507030127 otc alterations permit 8th fl - relocate 34 uprights, 17 pendents, & 13 concealed pendents. ref pa 202412126710 Status: Complete | Golden Gate Fire Protection Inc | $14.8K |
| applied Jun 27 | #202506279637 otc alterations permit 42/f new power & signal devices. ref ti 202504164515 Status: Issued | C B F Inc | $42.2K |
| applied Feb 21 | #202502210835 otc alterations permit ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of use Status: Complete | Hp Build | $42.5K |
| applied Jun 17 | #202506178918 otc alterations permit 13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. Status: Complete | Novo Construction Inc | $201K |
| applied Jun 17 | #202506178916 otc alterations permit 12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. no Status: Complete | Novo Construction Inc | $201K |
| applied Jun 17 | #202506178872 otc alterations permit 9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operational Status: Complete | Novo Construction Inc | $10K |
| applied Jun 17 | #202506178876 otc alterations permit 11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operational Status: Complete | Novo Construction Inc | $20K |
| applied Jun 13 | #202506138659 otc alterations permit 8f ref pa #2024-1212-6710: fire alarm 11 speaker strobes, 5 strobes, 4 relay modules, 3 duct detectors will be added. 11 smoke detectors were relocated Status: Complete | Pyro-Comm Systems, Inc. | $29.7K |
| applied Jun 6 | #202506068145 otc alterations permit fire sprinkler demo, rel0cate 181 uprights on the 12 th fl Status: Complete | Golden Gate Fire Protection Inc | $45.3K |
| applied Jun 6 | #202506068120 otc alterations permit 13th floor: fire sprinkler demo. relocate 181 uprights Status: Complete | Golden Gate Fire Protection Inc | $45.3K |
| applied Jun 5 | #202506058000 otc alterations permit 42/f: relocate 19 pendents. ref permit 202504164515. Status: Complete | Golden Gate Fire Protection Inc | $4.8K |
| applied Jun 4 | #202506047902 otc alterations permit fire sprinkler demo; relocate 15 uprights on the 9th floor. fire sprinkler demo; relocate 181 uprights on the 11th floor. Status: Complete | Golden Gate Fire Protection Inc | $122K |
| applied May 19 | #202505196806 otc alterations permit unit #300: replacing (e) evo event 48e electric cooktop model #10-0148-evt w/ new evo event 48e plus electric cooktop model #10-0600-evt. inkind. install per manufacturer's installaion instructions. Status: Issued | Acme Pacific Repairs, Inc | $67.1K |
| applied May 23 | #202505237136 otc alterations permit suite 4200: asbuilt to show correct soo showing the solid tone and not a voice message. ref 2025-0307-1821, 2025-0514-6432 Status: Complete | Pyro-Comm Systems, Inc. | — |
| applied May 23 | #202505237134 otc alterations permit 42nd/fl: 1 speaker strobe, 2 strobes, and 2 smoke detectors to be relocated. Status: Complete | Pyro-Comm Systems, Inc. | $2K |
| applied May 14 | #202505146432 otc alterations permit suite#: 4200; as built to show correct soo showing the temporal tone and not a voice message. ref#: 202503071821. Status: Complete | Pyro-Comm Systems, Inc. | — |
| applied May 14 | #202505146438 otc alterations permit suite 2800; fire alarm 2 relay modules will be added for door release and av shunt. ref#: 202504285353 Status: Complete | Pyro-Comm Systems, Inc. | $1K |
| applied Apr 28 | #202504285353 otc alterations permit 28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades. Status: Issued | Source Planning And Construction Inc | $50K |
| applied Dec 12 | #202412126710 otc alterations permit 8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposed Status: Issued | Source Planning And Construction Inc | $2.5M |
| applied Apr 16 | #202504164515 otc alterations permit suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred. Status: Complete | Richlen Construction | $422K |
| applied Mar 24 | #202503242867 otc alterations permit 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electrical Status: Complete | Hp Build | $30K |
| applied Mar 19 | #202503192541 otc alterations permit 34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 Status: Complete | Skyline Construction | $200K |
| applied Mar 19 | #202503192542 otc alterations permit 35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 Status: Complete | Skyline Construction | $200K |
| applied Dec 11 | #202412116572 otc alterations permit 26th fl - revision for pa 202406204908 deferred mep for ti permit 202405142058. no exterior work Status: Complete | Bcci Construction Company | $75K |
| applied Mar 19 | #202503192523 otc alterations permit 42nd fl: title 24 lighting compliance ref pa #2024-1218-7060 & 2024-1218-7066 Status: Complete | Mcclure Electric Inc | $17.5K |
| applied Mar 7 | #202503071821 otc alterations permit suite #4200: fire alarm: 2 ceiling speaker strobes to be added to provide proper coverage. ref pa #202412187066 Status: Complete | Pyro-Comm Systems, Inc. | $2K |
| applied Mar 13 | #202503132150 otc alterations permit 28th fl - fire alarm 1 smoke detector and 1 ceiling speaker strobe to be added to provide proper coverage ref pa 202412187047 Status: Complete | Pyro-Comm Systems, Inc. | $1.7K |
| applied Feb 27 | #202502271188 otc alterations permit 26th fl - as built for permit 202410213332 show heads that are hard piped for final inspection Status: Complete | Golden Gate Fire Protection Inc | $1K |
| applied Feb 20 | #202502200646 otc alterations permit 42nd/f ste 4200: relocate 5 pendents, 4 semi recessed. ref to t.i. 202412187066 Status: Complete | Pioneer Fire Inc. | $2K |
| applied Feb 11 | #202502110104 otc alterations permit 19/f - fire alarm as built. 1 duct detector and relay module was removed for fcu-2 as it never existed. 1 smoke detector added to idf room. ref f/a permit 202412247370. Status: Complete | Pyro-Comm Systems, Inc. | $720 |
| applied Dec 18 | #202412187066 otc alterations permit 42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits. Status: Complete | Hp Build | $115K |
| applied Dec 18 | #202412187060 otc alterations permit 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals. Status: Complete | Hp Build | $250K |
| applied Jan 23 | #202501238929 otc alterations permit mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485 Status: Complete | Hp Build | $105K |
| applied Dec 6 | #202412066287 otc alterations permit revision to 202405142058. updated finishes, new lighting, fixture replacement in kind. work at elevator lobby removed. mep deferred Status: Complete | Bcci Construction Company | $144K |
| applied Jan 6 | #202501067735 otc alterations permit 19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485. Status: Complete | Mcclure Electric Inc | $36.4K |
| applied Jan 6 | #202501067790 otc alterations permit 19/f suite 1925: fire alarm - 4 smoke detectors, 3 speaker strobes, 2 speakers, 1 strobe to be added to provide proper coverage. ref pa# 202411215485 Status: Complete | Pyro-Comm Systems, Inc. | $7.4K |
| applied Nov 18 | #202410304044 additions alterations or repairs 17th fl ref pa #202407267324 fire alarm 1 remote power supply, 28 speakers strobes, 27 speakers, 12 strobes, 37 smoke detectors, 9 duct detectors, 15 relay modules, 1 monitor module to be added to provide proper coverage. Status: Complete | Pyro-Comm Systems, Inc. | $124K |
| applied Dec 26 | #202412267408 otc alterations permit relocate (3) uprights, convert (7) uprights to pendents gcti #2024-1121-5485 19th fl. Status: Complete | Pioneer Fire Inc. | $6.2K |
| applied Dec 24 | #202412247370 otc alterations permit 19th floor. fire alarm: 11 smoke detectors, 2 duct detectors, 4 relay modules, 14 speaker strobes, 1 speaker, 13 should be added to provide proper coverage. pa#: 202410112776 Status: Complete | Pyro-Comm Systems, Inc. | $37.2K |
| applied Dec 13 | #202412136771 otc alterations permit 18/fl- evacation signage Status: Complete | Skyline Construction | $2.6K |
| applied Dec 13 | #202412136770 otc alterations permit 17/fl- evacation signage Status: Complete | Skyline Construction | $2.6K |
| applied Dec 18 | #202412187047 otc alterations permit minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parking Status: Complete | Source Planning And Construction Inc | $48K |
| applied Dec 5 | #202412056238 otc alterations permit ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018 Status: Complete | Hp Build | $11K |
| applied Nov 21 | #202411215485 otc alterations permit suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes Status: Complete | Hp Build | $475K |
| applied Dec 10 | #202412106479 otc alterations permit fire sprinkler relocate 4 sprinklers in the 20th fl restrooms ti 202408209067 Status: Complete | R L H Fire Protection Inc | $1K |
| applied Dec 3 | #202412036018 otc alterations permit 19th fl suite 1950 - fire sprinkler t.i. due to demo back to warm shell Status: Complete | Pioneer Fire Inc. | $10.8K |
| applied Nov 20 | #202410304047 additions alterations or repairs 18th fl ref pa #202408027822 fire alarm 1 remote power supply, 28 speakers strobes, 29 speakers, 9 strobes, 32 smoke detectors, 6 duct detectors, 12 relay modules, 2 monitor module to be added to provide proper coverage. Status: Complete | Pyro-Comm Systems, Inc. | $14K |
| applied Nov 22 | #202411225574 otc alterations permit 19th floor: relocate 16 pendents, repipe existing 37 drops with pendents to uprights, add 11 uprights. ref to t.i. 202410112776 Status: Complete | Pioneer Fire Inc. | $37.9K |
| applied Oct 25 | #202410253712 otc alterations permit rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl. Status: Complete | Skyline Construction | $19.3K |
In San Francisco, biggest first.