Issued Oct 28 · 182 permits
$1.2B
DDS 2019 CBC: FULL BUILDING PERMIT FOR THE SUPERSTRUCTURE, ENCLOSURE, AND INTERIOR FIT OUT OF SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. CAISSONS…
Get ProEvery project in every city · from $33/mo
Get Pro2,616 commercial and multifamily projects permitted in the last 90 days, worth $9.6B. New permits added daily.
Newest permit issued October 28, 2026
Latest projects
Issued Oct 28 · 182 permits
$1.2B
DDS 2019 CBC: FULL BUILDING PERMIT FOR THE SUPERSTRUCTURE, ENCLOSURE, AND INTERIOR FIT OUT OF SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. CAISSONS…
Issued Oct 28 · 69 permits
$14.4M
SELF-CERT 2019 CBC: INTERIOR ALTERATION OF EXISTING OFFICES ON THE 19TH AND 20TH FLOORS, SUITES 1950 AND 2000. AREAS OF WORK TOTAL 31,462 SQ FT. NO CHANGE TO GROUP B OCCUPANCY…
Issued Oct 28 · 12 permits
$8.6M
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
$25K
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EXTERIOR FACADE OF BUILDING.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2024. END DATE: 12/31/2024. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED…
| Week of | Permits |
|---|---|
| Jul 27 | 31 |
| Aug 3 | 240 |
| Aug 10 | 243 |
| Aug 17 | 268 |
| Aug 24 | 242 |
| Aug 31 | 252 |
| Sep 7 | 222 |
| Sep 14 | 276 |
| Sep 21 | 267 |
| Sep 28 | 242 |
| Oct 5 | 264 |
| Oct 12 | 202 |
| Oct 19 | 231 |
Source: building permit records from Chicago's Socrata open-data portal, checked daily. Data through . How we count
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All Chicago projects →
By declared value, last 90 days.
Issued Oct 28 · 182 permits
$1.2B
DDS 2019 CBC: FULL BUILDING PERMIT FOR THE SUPERSTRUCTURE, ENCLOSURE, AND INTERIOR FIT OUT OF SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. CAISSONS…
Issued Oct 16 · 33 permits
$1.2B
DDS 2019 CBC: INTERIOR BUILDOUT OF NEW 7-STORY CASINO, PARKING, AND EVENT CENTER BUILDING AND 34-STORY HOTEL TOWER. CAISSONS AND PILES ONLY PERMITTED UNDER 101064196. EX/ERS,…
Permits come from the city's Socrata open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 28, 2026.
SELF CERT 2019 CBRC WITH STRUCTURAL PEER REVIEW: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING 3 STORY OFFICE AND WAREHOUSE BUILDING. EXTERIOR ALTERATIONS AT SOUTH ELEVATION TO…
$103M
DDS 2019 CBRC: AA ORD L CONCOURSE. INTERIOR RENOVATION, LIMITED RELOCATION OF CONCESSIONS PROGRAM, UPDATED BUILDING SYSTEMS, RECONFIGURATION OF 3 BOARDING GATES, AND THE ADDITION…
$543K
REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 2 COOLING TOWER(B.A.C. FLUID COOLERS M/N PFI-1012N-2D4EZ-M1 ROOF) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL…
$37K
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 100 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EXTERIOR FACE BRICK.
$5.5M
SELF-CERT: INTERIOR ALTERATIONS TO 10TH FLOOR OFFICE, SUITE 1000 FOR METLIFE. WORK TO INCLUDE DEMOLITION, AND CONSTRUCTION OF NON-LOAD BEARING PARTITIONS, MILLWORK, FINISHES, AND…
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 28 | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EXTERIOR FACADE OF BUILDING. | commercialBuilding | $25K | Contractor with ProPro |
| Oct 28 | ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2024. END DATE: 12/31/2024. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED… | commercialElectrical | — | Hartmann Electric Company, Inc |
| Oct 28 | DDS 2019 CBRC: AA ORD L CONCOURSE. INTERIOR RENOVATION, LIMITED RELOCATION OF CONCESSIONS PROGRAM, UPDATED BUILDING SYSTEMS, RECONFIGURATION OF 3 BOARDING GATES, AND THE ADDITION… | commercialBuilding, Electrical, Elevator, Plumbing, Roofing, Signs | $103M | Hartmann Electric Company, Inc |
| Oct 28 | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 2 COOLING TOWER(B.A.C. FLUID COOLERS M/N PFI-1012N-2D4EZ-M1 ROOF) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL… | multifamilyHVAC / Mechanical | $543K | Contractor with Pro |
| Oct 28 | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 100 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EXTERIOR FACE BRICK. | multifamilyBuilding | $37K | Contractor with Pro |
| Oct 28 | SELF-CERT: INTERIOR ALTERATIONS TO 10TH FLOOR OFFICE, SUITE 1000 FOR METLIFE. WORK TO INCLUDE DEMOLITION, AND CONSTRUCTION OF NON-LOAD BEARING PARTITIONS, MILLWORK, FINISHES, AND… | commercialBuilding, Electrical, Fire protection, Signs | $5.5M | Current Communications Corp. |
2,607 more projects in the last 90 days
Unlock all 2,613 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Issued Oct 13 · 22 permits
$622M
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: 6TH, 7TH, 13TH FLOORS.
Issued Oct 13 · 58 permits
$275M
DS 2019 CBRC: REVISION TO FULL BUILDING PERMIT 101056000 FOR THE RENOVATION OF EXISTING SPACE AND ADDITION OF APPROXIMATELY 35,960 SF AT TERMINAL 3 OF O'HARE INTERNATIONAL…
Issued Oct 23 · 7 permits
$265M
TRAD. DS - 2019 CBC: INTERIOR FIT OUT PHASE FOR PROPOSED 8 STORY (ABOVE GRADE) MEDICAL CENTER. OCCUPANCY: I - INSTIT AND B - BUSINESS, ACCESSORY STORAGE AND ASSEMBLY. TYPE IA…
Issued Sep 16 · 14 permits
$212M
PHASE 3 OF 3: INTERIOR ALTERATIONS TO EXISTING 7-STORY OFFICE BUILDING TO CONVERT TO A DATA CENTER. WORK TO INCLUDE NEW EQUIPMENT WITH ASSOCIATED MEP UPGRADES. PHASE 1 DEMOLITION…
Issued Oct 28 · 3 permits
$185M
DDS 2019 CBC. NEW CONSTRUCTION, FULL BUILDING PERMIT FOR A 2 STORY BUILDING WITH A MEZZANINE AND NO BASEMENT AS PER PLANS. OCCUPANCY GROUPS A-1, A-3, B, M, S-1 AND S-2.…
Issued Oct 26 · 78 permits
$127M
SELF-CERT: PHASE 2 OF 2: INTERIOR BUILD-OUT OUT OF LEVELS 18, 19, 24, 25, 26, 27, 29, 30, 31, 32, 37 AND 38 FOR OFFICE USE. WORK TO INCLUDE NEW OPEN OFFICE AND PRIVATE OFFICES,…
Commercial & multifamily permits, last 90 days.
Related permits on the same job are grouped into one project, and non-construction permits are filtered out. On Chicago permits, 98% name a contractor and 85% declare a project value.