Commercial General Building, Electrical, Elevator work permitted January 22, 2025, with 14 permits through September 16, 2026, declaring $212,459,974 of work. Contractor on record: Arco/Murray National Construction Company LLC.
Get new commercial permits in Chicago, free weekly email
PHASE 3 OF 3: INTERIOR ALTERATIONS TO EXISTING 7-STORY OFFICE BUILDING TO CONVERT TO A DATA CENTER. WORK TO INCLUDE NEW EQUIPMENT WITH ASSOCIATED MEP UPGRADES. PHASE 1 DEMOLITION ONLY WORK PERMITTED UNDER 101083036. PHASE 2 INFRASTRUCTURE WORK PERMITTED UNDER 101081181. IA CONSTRUCTION; B-BUSINESS. CONSULTANT REVIEWER: V3 COMPANIES OF IL
Chicago permit records name Arco/Murray National Construction Company LLC, Kone Elevator Company and Abco Electrical Construction & as the contractors on this project, among 8 contractors in all.
The property owner is included with Pro.
14 permits issued Jan 22 – Sep 16, newest first.
In Chicago, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jun 17 | #101084518 PERMIT - RENOVATION/ALTERATION PHASE 3 OF 3: INTERIOR ALTERATIONS TO EXISTING 7-STORY OFFICE BUILDING TO CONVERT TO A DATA CENTER. WORK TO INCLUDE NEW EQUIPMENT WITH ASSOCIATED MEP UPGRADES. PHASE 1 DEMOLITION ONLY WORK PERMITTED UNDER 101083036. PHASE 2 INFRASTRUCTURE WORK PERMITTED UNDER 101081181. IA CONSTRUCTION;… Status: Active | Arco/Murray National Construction Company LLC | $151M |
| applied Aug 12 | #101087166 PERMIT - ELEVATOR EQUIPMENT MODERNIZATION OF (1) ONE EWGT FREIGHT ELEVATOR; 10,000LBS CAPACITY @ 100FPM, 8 FLOORS, PURSUANT TO SCOPE OF WORK SUBMITTED AND SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION (EV003721). | Kone Elevator Company | $1.4M |
| applied Jul 15 | #101085995 PERMIT - ELEVATOR EQUIPMENT INSTALLATION OF ONE(1) 7000LB CAPACITY, 8-FLOOR, 300FPM, TORNBORG PERSONNEL/CONSTRUCTION HOIST, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED. | Safway Atlantic, LLC | $150K |
| applied Jul 13 | #B200478464 PERMIT – EXPRESS PERMIT PROGRAM · Scaffolding TEMPORARY SCAFFOLDING: QTY: 6, MAX. LENGTH: 231 FT., MAX. HEIGHT: 122 FT. LOCATION: EAT AND WEST ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE Status: Active | Bulley & Andrews, L.L.C. | — |
| applied Jun 23 | #B200475301 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 80 CIRCUITS TO EXISTING 1000 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 63 . LIGHTING OUTLETS: 35. SPECIFIC LOCATION: TEMP POWER FOR 7 FLOOR RENOVATION. Status: Active | Abco Electrical Construction & | $300K |
| applied May 8 | #101081181 PERMIT - RENOVATION/ALTERATION DDS 2019 CBRC: PHASE 2 OF 3: INFRASTRUCTURE UPGRADES. CONVERT 7 STORY OFFICE BUILDING TO A DATA CENTER. REINFORCEMENT OF EXISTING FLOORS. ARCHITECTURAL PLANS PROVIDED FOR REFERENCE. ELECTRICAL WORK LIMITED TO ELECTRICAL DISTRIBUTION FROM COMED VAULT TO UPPER FLOORS. MECHANICAL, PLUMBING AND FIRE… Status: Phased Permitting | Arco/Murray National Construction Company LLC | $51.1M |
| applied Apr 22 | #101082470 PERMIT - NEW CONSTRUCTION TEMPORARY CONSTRUCTION HOIST PERMIT FOR TORNBURGS FC7000 SINGLE CAR TOWER WITH 7,000 LBS. CAR CAPACITY, AS PER PLANS. Status: Active | Arco/Murray National Construction Company LLC | $60K |
| applied May 8 | #101083036 PERMIT - RENOVATION/ALTERATION DDS 2019 CBRC: PHASE 1 OF 3: DEMOLITION OF NON LOAD BEARING PARTITIONS ON BASEMENT, 1ST THROUGH 7TH FLOORS OF EXISTING OFFICE BUILDING AS PER PLANS. TO ALSO INCLUDE DEMOLITION WORK ON THE MECHANICAL PENTHOUSE. 1A CONSTRUCTION. B-BUSINESS CONSULTANT REVIEWER: V3 COMPANIES Status: Phased Permitting | Arco/Murray National Construction Company LLC | $4M |
| applied Jun 24 | #B200476121 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: GROUND FLOOR EXTERIOR UNDER THE EXISTING BREEZEWAY. Status: Active | Abco Electrical Construction & | $120K |
| applied Mar 11 | #101080339 PERMIT - RENOVATION/ALTERATION DDS 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING LOWER LEVEL COMED VAULT ROOM. WORK TO INCLUDE SELECTIVE DEMOLITION OF NON-LOAD BEARING PARTITIONS, REPLACEMENT OF DOORS, INSTALLATION OF NEW CURBS, NEW VENTILATION, AND NEW LIGHTING SYSTEMS. NO CHANGE TO OCCUPANCY OR BUILDING AREA. IA CONSTRUCTION;… Status: Active | Arco/Murray National Construction Company LLC | $275K |
| applied Jan 22 | #101077548 PERMIT - RENOVATION/ALTERATION SELF CERT 2019 CBRC: INTERIOR DEMOLITION ONLY OF NON-LOAD BEARING PARTITIONS AT 1ST, 4TH. 5TH, 6TH, AND 7TH FLOOR OFFICES AS PER PLANS. 1A CONSTRUCTION. B-BUSINESS Status: Active | Arco/Murray National Holdings Inc | $3.8M |
| applied Jan 14 | #B200456217 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 60. SPECIFIC LOCATION: TEMPORARY POWER LIGHTING ON FLOORS 4,5,6,&7. Status: Active | Prime Electric Co., Inc. | $50K |
| applied Sep 11 | #B200442183 PERMIT – EXPRESS PERMIT PROGRAM · Scaffolding TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 225 FT., MAX. HEIGHT: 60 FT. LOCATION: ALL EXTERIOR FACADE ELEVATIONS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE Status: Active | The W. J. MC Guire Company | — |
| applied Jan 22 | #101064528 PERMIT - ELEVATOR EQUIPMENT MODERNIZATION OF ONE(1) 2000LB CAPACITY, 150FPM, 2-FLOOR, HYDRAULIC, PASSENGER ELEVATOR(#5), PURSUANT TO THE SCOPE OF WORK SUBMIIITED.(EV003721) 425 S. FINANCIAL PL | Kone Elevator Company | $165K |