6316 N Topanga Canyon Blvd 1110
Issued Oct 24
$150K
*EPLAN* INTERIOR NON-STRUCTURAL TENANT IMPROVEMENT OF EXISTING DINING ROOM AND OUTDOOR DINING AREA OF EXISTING RESTAURANT SPACE. NO CHANGE TO KITCHEN OR BATHROOMS.
Get ProEvery project in every city · from $33/mo
Get Pro3,074 commercial and multifamily projects permitted in the last 90 days, worth $5.5B. New permits added daily.
Newest permit issued October 24, 2026
Browse by trade
Latest projects
6316 N Topanga Canyon Blvd 1110
Issued Oct 24
$150K
*EPLAN* INTERIOR NON-STRUCTURAL TENANT IMPROVEMENT OF EXISTING DINING ROOM AND OUTDOOR DINING AREA OF EXISTING RESTAURANT SPACE. NO CHANGE TO KITCHEN OR BATHROOMS.
Issued Oct 24 · 2 permits
$32K
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_32_Squares. Class A roof covering is required within Very High Fire Hazard…
Issued Oct 23 · 6 permits
$5M
**ePlan** **New ADA & standard parking, hardscape and landscape redesign.** 2 of 3 **
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
$15.6K
EPLAN. Supplemental to permit 20010-10000-03782 to change door and window types, and to change structural framing members.
$66.8K
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 234 Squares. Class A roof covering is required within Very…
| Week of | Permits |
|---|---|
| Jul 27 | 36 |
| Aug 3 | 287 |
| Aug 10 | 254 |
| Aug 17 | 276 |
| Aug 24 | 334 |
| Aug 31 | 341 |
| Sep 7 | 270 |
| Sep 14 | 294 |
| Sep 21 | 339 |
| Sep 28 | 317 |
| Oct 5 | 244 |
| Oct 12 | 268 |
| Oct 19 | 323 |
Source: building permit records from Los Angeles's Socrata open-data portal, checked daily. Data through . How we count
By declared value, last 90 days.
Issued Oct 23 · 14 permits
$2.3B
**ePlan**LAX** Rebuild and addition for Terminal 05 at LAX Airport.
Issued Oct 22 · 12 permits
$512M
**Eplan, LACC*** NEW 4 STORY TYPE I-A ( PICO HALL) ADDITION TO (E) LA. CONVENTION CENTER TO COMBINE WEST HALL WITH SOUTH HALL. ( CONNECTS THE (E) SOUTH HALL & WEST HALL).
Permits come from the city's Socrata open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 24, 2026.
$29.5K
Kitchen remodel for residential buildings (no structural changes).
$7.2K
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 30 Squares. Class A roof covering is required within Very High…
$150K
VOLUNTARY SEISMIC RETROFIT OF (E) 2-STORY APARTMENT.
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 23 | EPLAN. Supplemental to permit 20010-10000-03782 to change door and window types, and to change structural framing members. | multifamilyBuilding | $15.6K | Contractor not published |
| Oct 23 | Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 234 Squares. Class A roof covering is required within Very… | commercialBuilding, Signs | $66.8K | Contractor not published |
| Oct 23 | Kitchen remodel for residential buildings (no structural changes). | multifamilyBuilding | $29.5K | Contractor not published |
| Oct 23 | Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very… | commercialBuilding | $7.2K | Contractor not published |
| Oct 23 | Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 30 Squares. Class A roof covering is required within Very High… | multifamilyBuilding | $9K | Contractor not published |
| Oct 23 | VOLUNTARY SEISMIC RETROFIT OF (E) 2-STORY APARTMENT. | multifamilyBuilding | $150K | Contractor not published |
3,065 more projects in the last 90 days
Unlock all 3,071 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All Los Angeles projects →
Issued Oct 2 · 47 permits
$194M
NEW 6 STORY CREATIVE OFFICE & PRODUCTION STUDIO BUILDIN GOVER 2 LEVELS OF SUBTERRANEAN PARKING GARAGE .
Issued Oct 16 · 53 permits
$126M
LAX project--Eplan#: 220713Anchorage for the baggage conveyor sytem for TBIT level 2. Baggage Handling Upgrade (BOP 2)
Issued Sep 22 · 6 permits
$121M
New 10-Story Type IA research facility building with no basement.
Issued Aug 10
$116M
(N) 19-STORY 386 UNIT APARTMENT OVER PODIUM WITH 4 LEVELS OF ABOVE GRADE GARAGE OVER 3 LEVELS OF BASEMENT GARAGE, INCLUDE 14 "WORKFORCE" UNITS.
Issued Sep 29 · 62 permits
$74.4M
(N) ADVANCED WATER PURIFICATION FACILITY BUILDING, TYPE II-B , OCCUPANCY F-1, B , NFPA-13 FIRE SPRINKLERS THROUGHOUT , ALL WORK PER ENGINEERING
Issued Aug 31 · 3 permits
$64.8M
New 8-story type I-A & type III-A , mixed-use Apartment building with 362 Units . (4 levels of Type III-A apartments over 4 levels of Type I-A parking & apartments & ground floor…
Commercial & multifamily permits, last 90 days.
Los Angeles’s permit feed doesn’t include contractor names, so leads list the site, scope and value.
See every contractorRelated permits on the same job are grouped into one project, and non-construction permits are filtered out. On Los Angeles permits, 0% name a contractor and 94% declare a project value.