Commercial General Building, Demolition work permitted November 8, 2024, with 62 permits through September 29, 2026, declaring $74,358,608 of work.
Get new commercial permits near 91406 or Los Angeles, free weekly email
(N) ADVANCED WATER PURIFICATION FACILITY BUILDING, TYPE II-B , OCCUPANCY F-1, B , NFPA-13 FIRE SPRINKLERS THROUGHOUT , ALL WORK PER ENGINEERING
Los Angeles’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
62 permits issued Nov 8 – Sep 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 21 | #25010-20013-00615 Bldg-Alter/Repair · Building Eplan Supplemental to Permit # 25010-20000-00615 for deferred submittal for MF Racks, all work per engineering Status: Issued | Not published | $5K |
Commercial and multifamily, biggest first.
#25010-20016-00615 Bldg-Alter/Repair · Building Eplan Supplemental to 25010-20000-00615 for a deferred submittal for Pipe Tunnel Supports , all work per engineering Status: Issued |
| Not published |
| $2.5K |
| applied Sep 21 | #25010-20014-00615 Bldg-Alter/Repair · Building Eplan Supplemental to Permit # 25010-20000-00615 for deferred submittal for RO Feed Pump Anchorage , all work per engineering Status: Issued | Not published | $2.5K |
| applied Sep 21 | #25010-20015-00615 Bldg-Alter/Repair · Building Eplan Suplemental to Permit # 25010-20000-00615 for deferred submittal for FRP Chemical Tank Anchorage, All work per engineering Status: Issued | Not published | $2.5K |
| applied Sep 16 | #25010-20011-00615 Bldg-Alter/Repair · Building EPLAN Supplemental to 25010-20000-00615 for deferred submittal for Fabricated Slide Gates anchorage calculations , all work per engineering Status: Issued | Not published | $3.5K |
| applied Sep 16 | #25010-20012-00615 Bldg-Alter/Repair · Building EPLAN Supplemental to Permit # 25010-20000-00615 for deferred submittal for MF CIP Tank Anchorage , all work per engineering Status: Issued | Not published | $2.5K |
| applied Sep 10 | #25010-20010-00615 Bldg-Alter/Repair · Building *EPLAN* Supplemental to 25010-20000-00615 for deferred submittal for Stainless Steel Stilling Well design detail , all work per engineering Status: Issued | Not published | $2.5K |
| applied Jul 16 | #20010-20001-00304 Bldg-Alter/Repair · Building SUPPLEMENTAL PERMIT TO 20010-20001-00304 TO ADD STEEL STAIRS Status: Issued | Not published | $120K |
| applied Aug 6 | #26016-20000-20807 Bldg-Alter/Repair · Building ePlan: ANCHOR FOR ROOF MOUNTED SOLAR PANEL Status: Issued | Not published | $757K |
| applied Nov 9 | #21016-10001-01401 Nonbldg-Alter/Repair · Building SUPPLEMENTAL TO PERMIT # 21016-10000-01401 TO INSTALL A NEW STEEL BEAM ACROSS THE DRIVEWAY SUPPORTING ELECTRICAL CONDUIT Status: Issued | Not published | $20K |
| applied Jan 26 | #21016-10000-01401 Nonbldg-Alter/Repair · Building NEW REINFORCED CONCRETE WALL IN AN EXISTING CONCRETE CHANNEL AND NEW LIGHT POLES BASE PLATE Status: Issued | Not published | $25K |
| applied Aug 25 | #25010-20009-00615 Bldg-Alter/Repair · Building ATTN: Rares Bodea, Steven Kim , emailed 08/25/2026. LADBS has issued Building Permit #25010-20000-00615 to LADBS for construction of a new Advanced Water Purification Facility (AWPF) at DC Tillman Water Reclamation Plant. This is deferred submittal for Trapeze Anchorage and Bracing Structural… Status: Issued | Not published | $2.5K |
| applied Aug 17 | #25010-20006-00615 Bldg-Alter/Repair · Building Eplan Supplemental to #25010-20000-00615 for deferred submittal for Sulfuric Acid Tank Anchorage , all work per engineering Status: Issued | Not published | $2.5K |
| applied Aug 17 | #25010-20007-00615 Bldg-Alter/Repair · Building ePLAN Supplemental Building Permit #25010-20000-00615 for deffered submital for Welded Carbon Steel Tank Structural and Anchorage Status: Issued | Not published | $2.5K |
| applied Aug 17 | #25010-20005-00615 Bldg-Alter/Repair · Building Eplan Suppleemental to 25010-20000-00615 for deferred submittal for Reverse Osmosis (RO) Rack , all work per engineering Status: Issued | Not published | $2.5K |
| applied Aug 17 | #25010-20008-00615 Bldg-Alter/Repair · Building EMAILED 8/14/26_RARES BODEA_STEVEN K***_ LADBS has issued permit # 25010-20000-00615 to LADBS for construction of a new Advanced Water Purification Facility (AWPF) at DC Tillman Water Reclamation Plant. This is deferred submittal for Reverse Osmosis (RO) Miscellaneous Equipment Anchorage… Status: Issued | Not published | $2.5K |
| applied Jun 10 | #26030-20000-04122 Grading · Building GRADING FOR CHANNEL EXPANSION AND SHORING Status: Issued | Not published | $170 |
| applied Jun 10 | #26020-20000-01194 Nonbldg-New · Building CHANNEL EXTENSION & NEW PAD AREA AND SHORING, ALL WORK PER ENGINEERING Status: Issued | Not published | $10K |
| applied Jul 15 | #25010-20004-00615 Bldg-Alter/Repair · Building EMAILED 7/9/26_RARES BODEA_STEVEN K***_This differed submittal covers material for barrel for the MF Feed Pumps at Advanced Water Purification Facility (AWPF) being built at DC Tillman Water Reclamation Plant. Status: Issued | Not published | $2.5K |
| applied Apr 3 | #25020-20001-00243 Nonbldg-New · Building SUPPLEMNTAL TO 25020-20000-00243 TO REVISE THE STRUCTURAL PLANS AND DETAiLS FOR EQUIPMENT PAD FOR PUMP, ALL WORK PER ENGINEERING Status: Issued | Not published | $1K |
| applied Apr 3 | #25020-20001-00244 Nonbldg-New · Building SUPPLEEMENTAL TO 25020-20000-00244 TO REVISE STRUCTURAL PLANS AND DETAILS FOR EQUIPMENT VAULT FOR WATER STORAGE, ALL WORK PER ENGINEERING Status: Issued | Not published | $1K |
| applied Apr 3 | #25010-20003-00615 Bldg-Alter/Repair · Building SUPPLEMENTAL TO 25010-20000-00615 TO REVISE OVERALL BUILDING HEIGHT AND STRUCTURAL REVIEWS, ALL WORK PER ENGINEERING Status: Issued | Not published | $5K |
| applied Feb 4 | #26020-20000-00233 Nonbldg-New · Building SHORING FOR EQP FACILITY , ALL WORK PER ENGINEERING Status: Issued | Not published | $6K |
| applied Feb 4 | #26020-20000-00229 Nonbldg-New · Building FLOW CONTROL VAULT, ALL WORK PER ENGINEERING Status: Issued | Not published | $10K |
| applied Feb 4 | #26020-20000-00234 Nonbldg-New · Building SHORING FOR EQV FACILITY, ALL WORK PER ENGINEERING Status: Issued | Not published | $6K |
| applied Feb 4 | #26030-20000-00845 Grading · Building GRADING FOR PUMP VAULT, FLOR CONTROL VAULT, ODOR CONTROL PAD, CHANNEL EXTENSION Status: Issued | Not published | $4.6K |
| applied Feb 4 | #26020-20000-00230 Nonbldg-New · Building EXTEND CHANNEL 2 FACILITY, ALL WORK PER ENGINEERING Status: Issued | Not published | $8K |
| applied Feb 4 | #26020-20000-00228 Nonbldg-New · Building PUMP VAULT STATION , ALL WORK PER ENGINEERING Status: Issued | Not published | $10K |
| applied Feb 4 | #26020-20000-00231 Nonbldg-New · Building CONCRETE PAD FOR MOUNTING ODOR CONTROL EQUIPMENT, ALL WORK PER ENGINEERING Status: Issued | Not published | $10K |
| applied Dec 11 | #25030-20000-08455 Grading · Building GRADING TO REPLACE (E) MANHOLE SHAFT. BACKFILL AND REPLACE TO (E) GRADE Status: Issued | Not published | $241 |
| applied Dec 11 | #25020-20000-02618 Nonbldg-New · Building SHORING FOR MANHOLE REPLACEMENT, ALL WORK PER ENGINEERING Status: Permit Finaled | Not published | $41K |
| applied Sep 12 | #25030-20000-06203 Grading · Building GRADING FOR ADVANCED WATER EQUALIZATION BASINS FOR TREATMENT PLANT Status: Issued | Not published | $11.4K |
| applied Sep 12 | #25020-20000-01880 Nonbldg-New · Building NEW ADVANCED WATER EQUALIZATION BASINS FOR TREATMENT PLANT, ALL WORK PER ENGINEERING Status: Issued | Not published | $5M |
| applied Jul 31 | #25010-20002-00615 Bldg-Addition · Building SUPPLEMENTAL TO 25010-20000-00615 TO EXPAND BASEMENT,NFPA-13 FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING Status: Issued | Not published | $5M |
| applied Jul 31 | #25020-20001-00242 Nonbldg-New · Building SUPPLEMENTAL TO 25020-20000-00242 FOR BASEMENT EXPANSION FOR SHORING Status: Issued | Not published | $100K |
| applied Jul 31 | #25030-20001-00883 Grading · Building SUPPLEMENTAL TO 25030-20000-00883 FOR BASEMENT EXPANSION Status: Issued | Not published | $5.3K |
#25016-90000-29528 Bldg-Alter/Repair · Building Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof… Status: Permit Finaled | Not published | $8K |
| applied Feb 10 | #25010-20000-00590 Bldg-New · Building Installation of commercial coaches modular structure for temporary construction use per state approved manufacturing per PFS-2163047. Status: Issued | Not published | $300K |
| applied Jan 29 | #20010-20000-00304 Bldg-New · Building WHSE/ MAINTENANCE SHOPS & OFFICESNFPA13 THROUGHOUT Status: Issued | Not published | $6.5M |
| applied Jan 29 | #20030-20000-00551 Grading · Building GRADING FOR SITE, CUT 4195 CY, FILL 929 CY EXPORT 3266CY , & REMOVE & RECOMPACT MAX. 5' DEEP 10983 CY Status: Issued | Not published | $15.2K |
| applied Jan 29 | #20010-20000-00305 Bldg-New · Building STORAGE OF HAZARDOUS MATERIALSNFPA13 THROUGH OUT Status: Issued | Not published | $215K |
| applied Feb 11 | #25020-20000-00241 Nonbldg-New · Building (N) RETAINING WALL 6.10 FT MAX X 114.83 FT LONG, NEW RETAINING WALL 2.59 FT HIGH MAX X 163.09 FT LONG ., ALL WORK PER ENGINEERING Status: Issued | Not published | $100K |
| applied Feb 11 | #25020-20000-00244 Nonbldg-New · Building EQUIPMENT VAULT FOR WATER STORAGE, ALL WORK PER ENGINEERING Status: Issued | Not published | $75K |
| applied Feb 11 | #25020-20000-00242 Nonbldg-New · Building SHORING FOR WATER PURIFICATION PLANT, ALL WORK PER ENGINEERING Status: Issued | Not published | $300K |
| applied Feb 11 | #25020-20000-00243 Nonbldg-New · Building EQUIPMENT PAD FOR PUMP, ALL WORK PER ENGINEERING Status: Issued | Not published | $7.5K |
| applied Feb 11 | #25030-20000-00883 Grading · Building GRADING FOR SITE/RET WALLS EXCAVATION AND BACKFILL. 3 OF 7 Status: Issued | Not published | $47.9K |
| applied Feb 11 | #25010-20000-00615 Bldg-New · Building (N) ADVANCED WATER PURIFICATION FACILITY BUILDING, TYPE II-B , OCCUPANCY F-1, B , NFPA-13 FIRE SPRINKLERS THROUGHOUT , ALL WORK PER ENGINEERING Status: Issued | Not published | $60M |
| applied Sep 2 | #20019-20000-03280 Bldg-Demolition · Building DEMO THE (E) SERVICE BUILDING. SEWER CAP NAD PEDESTRIANE FENCE IS REQUIRED. Status: Issued | Not published | $30K |
| applied Sep 2 | #20019-20000-03279 Bldg-Demolition · Building DEMO THE (E) SERVICE BUILDING # 2. SEWER CAP AND PEDESTRIANE FENCE IS REQUIRED. Status: Issued | Not published | $30K |
| applied Mar 14 | #25030-20000-02036 Grading · Building GRADING PERMIT TO EXCAVATE AND BACKFILL FOR (3) NEW UNDERGROUND CONCRETE VAULTS, (N) LINE TO DIVERT EFFLUENT TO (E) RAW SEWAGE LINE. (N) JUNCTION STRUCTURE AT TIE-IN. REPLACE QUARRY TILE PAVING Status: Permit Finaled | Not published | $804 |
| applied Mar 14 | #25020-20000-00872 Nonbldg-New · Building NEW SHORING FOR VAULTS FOR DIVERSION PIPE Status: Permit Finaled | Not published | $120K |
| applied Mar 14 | #25020-20000-00625 Nonbldg-New · Building NEW 24" ISOLATION CONTROL VALVE VAULT , ALL WORK PER ENGINEERING Status: Cofo In Progress | Not published | $566K |
| applied Mar 14 | #25020-20000-00481 Nonbldg-New · Building 16" ISOLATION VALVE AND FLOW METER VAULT , ALL WORK PER ENGINEERING Status: Cofo In Progress | Not published | $566K |
| applied Sep 6 | #24014-20000-03866 Bldg-Alter/Repair · Building Eplan Anchorage only for relocation of existing storage racks Status: Permit Finaled | Not published | $5K |
| applied Feb 3 | #23026-10001-00141 Nonbldg-Alter/Repair · Building SUPPLEMENTAL PERMIT TO 23020-10001-00141 TO UPDATE STRUCTURAL PLANS Status: Permit Finaled | Not published | $50K |
| applied Apr 29 | #19026-20001-00257 Nonbldg-Alter/Repair · Building ePLAN. Supplemental to permit 19026-10000-00257 to capture revised structural frame from lumber to concrete. Status: Issued | Not published | $50K |
| applied Aug 22 | #24030-20000-05239 Grading · Building GRADING FOR STAGING AREA Status: Issued | Not published | $10.9K |
| applied Dec 6 | #23020-10000-02394 Nonbldg-New · Building SHORING FOR INSTALLATION OF A TEMPORARY A WET WELL SHORED PIT WILL BE BADCFILLED TO EXISTING CONDITIONS SOLL REPORT AND CALC1 OF 2 Status: Permit Finaled | Not published | $400K |
| applied Dec 6 | #23030-10000-07572 Grading · Building GRADING FOR PROPOSED SHORING2 OF 2 Status: Permit Finaled | Not published | $1.6K |
| applied Nov 20 | #20010-20005-04698 Bldg-Alter/Repair · Building Supplemental to 20010-10000-04698 For the exterior roof access ladder Status: Permit Finaled | Not published | $15K |
| applied Nov 20 | #24030-10000-07419 Grading · Building Grading - excavate and backfill at the area of area of 3 generators and ground resister mechanical units. Status: Issued | Not published | $1.5K |
| applied Nov 4 | #18020-10001-02867 Nonbldg-Alter/Repair · Building Supplemental to permit number 18020-1000-02867 to change matt foundation design per new engineer of record, (the work is at the same location) Status: Issued | Not published | — |