Issued Oct 28
$417K
Interior tenant alteration for Edward Jones Financial Office. *IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL…
Get ProEvery project in every city · from $33/mo
Get Pro269 commercial and multifamily projects permitted in the last 90 days, worth $749M. New permits added daily.
Newest permit issued October 28, 2026
Browse by trade
Latest projects
Issued Oct 28
$417K
Interior tenant alteration for Edward Jones Financial Office. *IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL…
Issued Oct 28
$20.8K
Retrofit existing plumbing to accommodate new double combi ovens; connect new water filter supply to combi ovens; drain combi oven to existing floor sink
Issued Oct 28 · 2 permits
$57.4K
Enlarge existing truck door and install concrete ramp at Commercial building.
Updated daily
Grouped by project, newest first. Pro members see every project with the contractor, owner and phone number.
$162K
PROJECT CONSISTS OF REPLACING THE EXISTING FIRE ALARM AND DETECTION SYSTEM WITH A SIEMENS CERBERUS PRO FC924 ADDRESSABLE FIRE ALARM CONTROL PANEL. THE FIRE ALARM CONTROL PANEL…
$5.5M
Interior alterations at Lululemom. **Approved Mechanical, and Plumbing scopes will require seperate permits for fixtures/equipment **
| Week of | Permits |
|---|---|
| Jul 27 | 9 |
| Aug 3 | 23 |
| Aug 10 | 45 |
| Aug 17 | 18 |
| Aug 24 | 35 |
| Aug 31 | 22 |
| Sep 7 | 30 |
| Sep 14 | 35 |
| Sep 21 | 24 |
| Sep 28 | 21 |
| Oct 5 | 30 |
| Oct 12 | 41 |
| Oct 19 | 30 |
Source: building permit records from Tacoma's open-data portal, checked daily. Data through . How we count
By declared value, last 90 days.
Issued Oct 1 · 13 permits
$262M
Construct a new 957,779SF industrial facility building. **Plumbing and Mechanical scopes will require separate permits** ***FRC25-0239 - Approved 10.7.25. Description: Revised…
Issued Oct 14 · 9 permits
$50.2M
Onsite work associated with the construction of a new Tacoma Water Warehouse and Shops Facility with integrated administrative space, raised loading dock, and support areas. The…
Permits come from the city's open-data portal, checked daily. This page covers Jul 31 – Oct 29; the newest permit was issued October 28, 2026.
$50K
TI of existing space for new office
$20.9K
Retrofit existing plumbing to accommodate new double combi ovens; connect new water filter supply to combi ovens; drain combi oven to existing floor sink
$88.3K
REMOVAL OF EXTERIOR CLADDING TO INCLUDE SIDING, GARAGE DOORS, GARAGE DOOR TRACKS AND ASSOCIATED HARDWARE, ROOF, GUTTERS, DOWNSPOUTS, AND ALL ASSOCIATED HARDWARE, LEAVING ALL…
$2.9M
Interior renovations of existing office space on Level 10 including selective demolitions, new finishes, new partitions, ceiling, doors and millwork in Commercial Bldg.
| Issued | Project | Type | Value | Contractor |
|---|---|---|---|---|
| Oct 28 | PROJECT CONSISTS OF REPLACING THE EXISTING FIRE ALARM AND DETECTION SYSTEM WITH A SIEMENS CERBERUS PRO FC924 ADDRESSABLE FIRE ALARM CONTROL PANEL. THE FIRE ALARM CONTROL PANEL… | commercialBuilding, Fire protection | $162K | Contractor not published |
| Oct 28 | Interior alterations at Lululemom. **Approved Mechanical, and Plumbing scopes will require seperate permits for fixtures/equipment ** | commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing, Signs | $5.5M | Contractor not published |
| Oct 28 | TI of existing space for new office | commercialBuilding | $50K | Contractor not published |
| Oct 28 | Retrofit existing plumbing to accommodate new double combi ovens; connect new water filter supply to combi ovens; drain combi oven to existing floor sink | commercialPlumbing | $20.9K | Contractor not published |
| Oct 28 | REMOVAL OF EXTERIOR CLADDING TO INCLUDE SIDING, GARAGE DOORS, GARAGE DOOR TRACKS AND ASSOCIATED HARDWARE, ROOF, GUTTERS, DOWNSPOUTS, AND ALL ASSOCIATED HARDWARE, LEAVING ALL… | commercialBuilding | $88.3K | Contractor not published |
| Oct 28 | Interior renovations of existing office space on Level 10 including selective demolitions, new finishes, new partitions, ceiling, doors and millwork in Commercial Bldg. | commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing, Roofing | $2.9M | Contractor not published |
260 more projects in the last 90 days
Unlock all 266 projectsEvery project, contractor and phone number · from $33/mo · cancel anytime
Projects whose contractor just became public: we name it 30 days after the first permit (Pro sees it the day it’s issued). All Tacoma projects →
Issued Oct 14 · 13 permits
$50.1M
Construction of commercial warehouse building development and associated parking, landscaping and site work improvements. **FRC26-0211 (08.18.26): The generator pad has been…
Issued Sep 23 · 7 permits
$39.9M
Associated site improvements for Martine Skills Center and Port Business Center: utility structures, paved parking and driveway areas, underground utilities, and stormwater…
Issued Oct 26 · 20 permits
$38.5M
Onsite improvements associated with the construction of Bates Technical College Fire Service Training Center aims to construct a new facility at their South Campus in Tacoma.…
Issued Sep 29 · 6 permits
$31.9M
Frontage improvements associated with converting nine stories of the Sandberg from office use to residential units, including restoration / replacement of existing sidewalk…
Issued Oct 13 · 13 permits
$29.5M
PRIORITY - SITE DEVELOPMENT FOR THE CONSTRUCTION OF A FOUR-STORY APARTMENT BUILDING OF TYPE VA WOOD FRAME CONSTRUCTION. PROJECT INCLUDES 63 AFFORDABLE APARTMENTS FOR SENIORS WITH…
Issued Oct 27 · 44 permits
$21.5M
Remodel of existing patient rooms, adding exam lights in (8); dialysis connection boxes in all rooms on 6th and 7th floors, and additional power outlets in the patient rooms. Two…
Commercial & multifamily permits, last 90 days.
Tacoma’s permit feed doesn’t include contractor names, so leads list the site, scope and value.
See every contractorRelated permits on the same job are grouped into one project, and non-construction permits are filtered out. On Tacoma permits, 0% name a contractor and 85% declare a project value.