Commercial General Building, Demolition, Electrical, Fire Protection, Plumbing work permitted October 29, 2024, with 182 permits through October 28, 2026, declaring $1,249,457,649 of work. Contractor on record: Hartmann Electric Company, Inc.
DDS 2019 CBC: FULL BUILDING PERMIT FOR THE SUPERSTRUCTURE, ENCLOSURE, AND INTERIOR FIT OUT OF SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. CAISSONS ONLY PERMIT UNDER 10106693. ERS ONLY PERMIT UNDER 101068757. SHALLOW FOUNDATIONS AND SUBSTRUCTURE UNDER 101071588. (CONSTRUCTION TYPE IB, OCC GROUP A-2, A-3, F-1). CDA PROJECT NO - TAP 102.19, TAP 105.19, TAP 106.19, TAP 107.19 CONSULTANT REVIEWER: V3 COMPANIES OF IL
Chicago permit records name Hartmann Electric Company, Inc, Hunt Construction Group Inc and F.H. Paschen, S.N. Nielsen & Associates, LLC. as the contractors on this project, among 32 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
In Chicago, biggest first.
The contractor on 10 permits issued in the last 30 days is included with Pro.
182 permits issued Oct 29 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 28 | #B200517712 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 28 | #B200517717 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 28 | #B200517709 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 28 | #B200517704 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 28 | #B200517710 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/2/2026. END DATE: 12/2/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 28 | #B200517720 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 14 | #B200515894 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 139. SPECIFIC LOCATION: 1ST AND 2ND FLOORS. Status: Active | Contractor with Pro | $151K |
| applied Oct 13 | #B200515657 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: AIR CANADA. Status: Active | Contractor with Pro | $3.5K |
| applied Oct 8 | #B200515118 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/8/2026. END DATE: 11/7/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Contractor with Pro | — |
| applied Oct 2 | #B200514286 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 2. Status: Active | Contractor with Pro | $4.5K |
| applied Apr 3 | #101079761 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: CAISSONS ONLY (VERTICAL PENETRATION ONLY) PERMIT FOR THE PROPOSED SATELLITE 2 CONCOURSE (CONCOURSE E) TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT (CONSTRUCTION TYPE IB, OCC GROUP A-2, A-3, F-1). CDA PROJECT NO. TAP 102.19, TAP 105.19, TAP 106.19, TAP 107.19. CONSULTANT… Status: Active | Hunt Construction Group Inc | $5.7M |
| applied Jun 9 | #101084138 PERMIT - RENOVATION/ALTERATION 2019 CBRC - SPR - RENOVATIONS TO UPGRADE EXISTING HEATING, VENTILATION, FIRE ALARM AND CONTROL SYSTEMS OF THE EXISTING UNDERGROUND UTILITY RINGTUNNEL. ADDITION OF NEW GAS DETECTION SYSTEM, NEW FIRE SEPARATION WALLS AND NEW FIRE RATED DOORS IN THE EXISTING UNDERGROUND UTILITY RING TUNNEL OFO'HARE… Status: Active | Blinderman Construction Co., Inc. | $1M |
| applied Sep 24 | #B200513130 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 400 AMP SERVICE DISCONNECTING MEANS WITH 3 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: ADJACENT TO RECIRCULATING ROAD AT O'HARE AIRPORT. Status: Active | Broadway Electric, Inc. | $25K |
| applied Sep 30 | #B200513874 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200513876 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200513869 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200513872 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200513868 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Active | Hartmann Electric Company, Inc | — |
| applied Sep 29 | #B200513641 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: TERMINAL 3. Status: Active | Hartmann Electric Company, Inc | $25K |
| applied Sep 25 | #B200513275 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 1. Status: Active | Hartmann Electric Company, Inc | $4.5K |
| applied Sep 24 | #B200513149 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: TERMINAL #1. Status: Active | Hartmann Electric Company, Inc | $8.5K |
| applied Sep 24 | #B200513077 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: THROUGHOUT BUILDING. Status: Active | Network Technology Innovations | $150K |
| applied Sep 24 | #B200513105 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL #2. Status: Active | Hartmann Electric Company, Inc | $8.5K |
| applied Sep 21 | #B200512552 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 9 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: T-1, T-2 AND T-3. Status: Active | Hartmann Electric Company, Inc | $5.5K |
| applied Sep 21 | #B200512556 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 1. Status: Active | Hartmann Electric Company, Inc | $35K |
| applied Sep 8 | #B200510689 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change FOR PERMIT B200446859: ADDITIONAL ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. Status: Complete | Integrated Electrical Services, L.L.C. | — |
| applied Sep 9 | #B200510967 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: G- CONCOURSE. Status: Active | Hartmann Electric Company, Inc | $10.5K |
| applied Sep 1 | #B200509898 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 10 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: GATE K7. Status: Active | Hartmann Electric Company, Inc | $15.5K |
| applied Aug 27 | #B200509256 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200509265 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200509260 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200509263 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200509252 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Apr 9 | #101080680 PERMIT - RENOVATION/ALTERATION SPR 2019 CBRC: REPLACEMENT OF HEAT EXCHANGERS IN TERMINALS 1 (CONCOURSES B&C) AND 3 (CONCOURSES L&H) AND ASSOCIATED ELECTRICAL EQUIPMENT. CDA PROJECT # H7117.19-00 & H7119.19-00. NO STRUCTURAL SCOPE OF WORK, NO INTERIOR LAYOUT CHANGES. NO CHANGE TO THE EXISTING CONSTRUCTION TYPE I-B, NO CHANGE TO… Status: Active | Autumn Construction Services, Inc. | $3.6M |
| applied Aug 4 | #B200481370 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 1 CIRCUITS TO EXISTING 800 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 5. Status: Complete | Hartmann Electric Company, Inc | $55K |
| applied Jul 31 | #B200480922 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change FOR PERMIT B200446859: REPLACEMENT ELECTRICAL CONTRACTOR. ADDITIONAL ELECTRICAL CONTRACTOR. ADDITIONAL ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. Status: Complete | Quantum Crossings, LLC | — |
| applied Jul 29 | #B200480592 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: T5 M40. Status: Complete | Hartmann Electric Company, Inc | $7.5K |
| applied Jul 30 | #B200480776 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 8/1/2026. END DATE: 8/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jul 23 | #B200479800 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL TELEPHONE. SPECIFIC LOCATION: SOLI ON THE FLY T5. Status: Active | Hartmann Electric Company, Inc | $1.5K |
| applied Dec 23 | #101077694 PERMIT - RENOVATION/ALTERATION SPR 2019 CRBC: INTERIOR ALTERATIONS TO EIGHT (8) RESTROOMS THROUGHOUT THE O'HARE INTERNATIONAL AIRPORT CAMPUS FOR REFRESH OF EXISTING COMPONENTS AND FINISHES. RESTROOMS LOCATED IN TERMINAL 1 (GATES B1, B10, B15 & GATES C8, C22) AND TERMINAL 3 (GATE H4 & GATES K2, K6) INCLUDING… Status: Active | Austin Power Partners | $17.5M |
| applied May 18 | #101080332 PERMIT - NEW CONSTRUCTION VERIZON NEW SITE BUILD - NAME: AIRPORT HANGAR - E. SITE NUMBER: 50003608791. INSTALLATION OF (1) NEW LESSEE H-FRAME & EQUIPMENT ON ROOFTOP2. INSTALLATION OF (3) NEW ANTENNA MOUNTS ON ROOFTOP3. INSTALLATION OF (4) NEW LESSEE ANTENNAS4. INSTALLATION OF (4) NEW LESSEE ANTENNAS W/INTEGRATED RADIOS5.… Status: Active | Swiatek Inc | $100K |
| applied Jul 6 | #B200477497 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 8 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 5. Status: Complete | Hartmann Electric Company, Inc | $5.5K |
| applied Jun 30 | #B200476804 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jun 30 | #B200476798 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jun 30 | #B200476831 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jun 30 | #B200476827 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jun 30 | #B200476801 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jun 26 | #B200476475 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 1 C1 & C3 JETBRIDGES. Status: Active | Hartmann Electric Company, Inc | $5K |
| applied May 27 | #B101084032 PERMIT - WRECKING/DEMOLITION WRECK AND REMOVE A 1 STORY CONCRETE BLOCK BUILDING AT OHARE (BUILDING 928) AIRPORT Status: Complete | Martinez Frog's, Incorporated | $280K |
| applied Jun 23 | #B200475893 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: TERMINAL 2 UPPER & LOWER LEVEL. Status: Complete | Hartmann Electric Company, Inc | $10K |
| applied Jun 18 | #B200475461 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: TERMINAL 5 TSA CHECKPOINT. Status: Complete | Hartmann Electric Company, Inc | $5K |
| applied Jun 16 | #B200475005 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED MOVE BUILDING. Status: Active | Hartmann Electric Company, Inc | $10K |
| applied Jun 1 | #B200470555 PERMIT – EXPRESS PERMIT PROGRAM · Fire Alarm System FIRE ALARM: NEW SYSTEM. ASSOCIATED BUILDING PERMIT:101065085. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: NO. VOICE COMMUNICATION: NO. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: 1ST FLOOR. Status: Active | Siemens Industry Inc | — |
| applied May 28 | #B200472338 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied May 28 | #B200472353 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied May 28 | #B200472337 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied May 28 | #B200472340 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied May 28 | #B200472344 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied May 22 | #B200468690 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 18 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied May 19 | #B200471221 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 12 CIRCUITS TO EXISTING 1200 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 12 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: DE-ICING FACILITY. Status: Active | Hartmann Electric Company, Inc | $25K |
| applied May 19 | #B200464881 PERMIT – EXPRESS PERMIT PROGRAM · Fire Alarm System FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101056000. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: NO. VOICE COMMUNICATION: NO. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: BASEMENT, LOWER LVL, UPPER LVL,… Status: Active | Siemens Industry Inc | — |
| applied May 5 | #101082236 PERMIT - RENOVATION/ALTERATION REVISIONS TO PREVIOUSLY PERMITTED (#101061323 AND #101067914)) WORK INCLUDING RENOVATION OF EXISTING OFFICES INCLUDING REMOVING/RELOCATION EXISTING FURNITURE, REPAINTING EXISTING WALLS AND DOORS, AND BUILDING NEW WALLS/DOORS AND ADDING NEW DATA PORTS. NO CHANGE TO THE EXISTING BUILDING OCCUPANCY… Status: Active | F.H. Paschen, S.N. Nielsen & Associates, LLC. | $73.5K |
| applied May 1 | #B200468780 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: SPIRIT AIRLINES TICKET COUNTER. Status: Complete | Hartmann Electric Company, Inc | $3.5K |
| applied Apr 29 | #B200468408 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Apr 29 | #B200468388 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Apr 29 | #B200468399 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Apr 29 | #B200468403 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Apr 29 | #B200468401 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Apr 24 | #B200467901 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change FOR PERMIT B200446859: ADDITIONAL ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. Status: Complete | Ron Jones Electric Inc. | — |
| applied Apr 7 | #B200465282 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: CLEAR CHANNEL T3@H1. Status: Active | Hartmann Electric Company, Inc | $1.5K |
| applied Mar 9 | #101080355 PERMIT - RENOVATION/ALTERATION SPR 2019 CBRC: INTERIOR ALTERATIONS TO HOLDROOMS AND NEW SHALLOW FOUNDATIONS FOR A PASSENGER BOARDING BRIDGE (PBB) RELOCATION AT GATE B2 IN CONCOURSE B OF EXISTING TERMINAL 1 AT O'HARE INTERNATIONAL AIRPORT. INCLUDES HOLDROOM RECONFIGURATION, MODIFICATIONS TO FURNITURE, FLOOR FINISHES, ELECTRICAL… Status: Active | Turner Construction Company | $5M |
| applied Jan 12 | #101078365 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: REVISION TO PERMIT 101068757. REVISIONS TO THE ANGLE AND SPACING FOR THE TIEBACKS, LOWERING OF BOTTOM OF SHEET PILES, AND ELIMINATING 2ND ROW OF TIEBACKS FOR THE PERMANENT CUT OFF WALL (PERMANENT EARTH RETENTION SYSTEM) ONLY PERMIT INCLUDING EXCAVATION FOR PROPOSED SATELLITE 1… Status: Active | Hunt Construction Group Inc | $24M |
| applied Mar 31 | #B200464421 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 31 | #B200464424 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 31 | #B200464406 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 31 | #B200464416 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Active | Hartmann Electric Company, Inc | — |
| applied Mar 30 | #B200464178 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 15 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: GATE T3, T5. Status: Complete | Maron Electric Company | $70K |
| applied Nov 25 | #101076890 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: FULL BUILDING PERMIT FOR THE CONFINED SPACES PORTIONS OF CONSOLIDATED TUNNEL BETWEEN FUTURE OHARE GLOBAL TERMINAL AND FUTURE SATELLITE 2 CONCOURSE BUILDINGS AT O'HARE INTERNATIONAL AIRPORT, INCLUDING BUILDING SYSTEMS ENABLING SATELLITE 1. ERS ONLY PERMIT UNDER 101068757.… Status: Active | Hunt Construction Group Inc | $220M |
| applied Mar 12 | #B200462024 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED AIRLINES. Status: Complete | Hartmann Electric Company, Inc | $6.5K |
| applied Mar 13 | #B200455100 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 26.71 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Mar 12 | #B200462047 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 6 CIRCUITS TO EXISTING 100 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED AIRLINES TERMINAL #1. Status: Complete | Hartmann Electric Company, Inc | $25K |
| applied Mar 10 | #B200461708 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 36 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL #5. Status: Complete | Hartmann Electric Company, Inc | $15K |
| applied Mar 6 | #B200461387 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: OCC TUNNEL. Status: Complete | Hartmann Electric Company, Inc | $1.5K |
| applied Mar 2 | #B200460712 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED AIRLINES TERMINAL 1 TICKETING.. Status: Complete | Hartmann Electric Company, Inc | $5.5K |
| applied Mar 2 | #B200460685 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/2/2026. END DATE: 4/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 2 | #B200460691 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/2/2026. END DATE: 4/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 2 | #B200460681 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/2/2026. END DATE: 4/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 2 | #B200460687 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/2/2026. END DATE: 4/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Mar 2 | #B200460686 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 3/2/2026. END DATE: 4/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Feb 26 | #B200460388 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 4 CIRCUITS TO EXISTING 100 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 5 UPPER LEVEL SOLI ON THE FLY KIOSK. Status: Complete | Hartmann Electric Company, Inc | $20K |
| applied Oct 27 | #101071590 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: FULL BUILDING PERMIT FOR THE SUPERSTRUCTURE, ENCLOSURE, AND INTERIOR FIT OUT OF SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. CAISSONS ONLY PERMIT UNDER 10106693. ERS ONLY PERMIT UNDER 101068757. SHALLOW FOUNDATIONS AND SUBSTRUCTURE UNDER 101071588.… Status: Phased Permitting | Hunt Construction Group Inc | $730M |
| applied Feb 11 | #101079527 PERMIT - REINSTATE REVOKED PMT REINSTATE PERMIT NO 101046976 MUST BEGIN WORK AND OR REQUEST INSPECTION NO LATER THAN ***AUGUST 2026*** ON PERMIT 101046976 | F.E. Moran Inc | — |
| applied Feb 2 | #B200457773 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/2/2026. END DATE: 3/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Feb 2 | #B200457759 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/2/2026. END DATE: 3/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Feb 2 | #B200457772 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/2/2026. END DATE: 3/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Feb 2 | #B200457767 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/2/2026. END DATE: 3/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Feb 2 | #B200457769 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 2/2/2026. END DATE: 3/4/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Nov 3 | #101075915 PERMIT - RENOVATION/ALTERATION SPR 2019 CHICAGO REHABILITATION CODE TITLE 14R W/ APRIL 2022 SUPPLEMENTS: INTERIOR AND EXTERIOR RENOVATION AND ALTERATION WORK AT THE EXISTING UNITED AIRLINES CARGO FACILITY WAREHOUSE, BUILDING 630 (OCCUPANCY S-1, TYPE IB) AT O'HARE INTERNATIONAL AIRPORT. SCOPE TO INCLUDE, BUT NOT LIMITED TO… Status: Active | F.H. Paschen, S.N. Nielsen & Associates, LLC. | $750K |
| applied Oct 8 | #101072656 PERMIT - RENOVATION/ALTERATION DDS 2019 CBRC: PHASE 1 OF 2. REMOVAL AND REPLACEMENT OF BAGGAGE HANDLING SYSTEM AND ASSOCIATED BUILDING WORKS - ALL WORK ASSOCIATED WITH REPLACEMENT OF THE EXISTING 60 DOUBLE STACK PIERS AND 4 MAKEUP UNITES WITH 18 NEW MAKEUP UNITS. RE-MODEL OF APPROXIMATELY 2000 SQ FT OF BUILDING SPACE. TSA BREAK… Status: Active | Vanderlande Logistics LLC | $14.9M |
| applied Jan 15 | #B200456327 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: SATELLITE 1 CONCOUSE TERM. BLDG AT O'HARE. Status: Active | Aldridge Electric Inc | $50K |
| applied Jan 8 | #B200455669 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 1 @ B10. Status: Complete | Hartmann Electric Company, Inc | $2.5K |
| applied Sep 25 | #101074603 PERMIT - RENOVATION/ALTERATION RELOCATION OF A PBBINSTALLATION OF A NEW FOUNDATION FOR A RELOCATED PBBINSTALLATION OF NEW APRON PAVEMENT TO ACCOMMODATENEW ELECTRICAL Status: Active | Clune Construction Company, L.P. | — |
| applied Dec 29 | #B200454940 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Dec 29 | #B200454930 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Dec 29 | #B200454937 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Dec 29 | #B200454944 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Dec 29 | #B200454932 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Dec 16 | #B200454181 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: L STINGER. Status: Active | Hartmann Electric Company, Inc | $2.5K |
| applied Oct 14 | #101075208 PERMIT - RENOVATION/ALTERATION SPR 2019 CHICAGO REHABCODE TITLE 14R W/ APRIL 2022 SUPPLEMENTS: ALTERATION & RENOVATION TO APRON LEVEL AT TERMINAL 1, B & C CONCOURSE O'HARE INTERNATIONAL AIRPORT. WORK INCLUDES SELECTIVE DEMO, PARTIAL HEIGHT WALLS, ADDING CMU WALLS TO ENCLOSE TUG / GARAGE SPACE UNDER THE EXISTING HOLD ROOMS WITH… Status: Active | Northwest Contractors, Inc | $500K |
| applied Dec 1 | #B200452635 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 5. Status: Complete | Hartmann Electric Company, Inc | $35K |
| applied Nov 25 | #B200452264 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Nov 25 | #B200452252 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Nov 25 | #B200452263 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Nov 25 | #B200452258 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Nov 25 | #B200452261 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Oct 17 | #B200446859 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change DUCTWORK EXTENSION/RECONFIGURATION, HYDRONIC PIPING EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 34 OTHER AIR HANDLING EQUIPMENT(HUNTAIR) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 34 NON-RESIDENTIAL UNIT(S), O'HARE AIRPORT TERMINAL 3. Status: Active | F.H. Paschen, S.N. Nielsen & Associates, LLC. | — |
| applied Nov 18 | #B200451267 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED AIRLINES SERVICE CENTER. Status: Complete | Hartmann Electric Company, Inc | $5.5K |
| applied Sep 9 | #101071836 PERMIT - RENOVATION/ALTERATION SPR 2019 CBC: ALTERATIONS BUILDING PERMIT FOR UPGRADES TO THE EXISTING HEATING AND REFRIGERATION PLANT (O'HARE BUILDING 450) TO PROVIDE HEATING TO CONSOLIDATED TUNNEL, SATELLITES, AND O'HARE GLOBAL TERMINAL. (OCC. F-1; TYPE IIB CONST.) CDA PROJECT ¿ HEATING AND REFRIGERATION (H&R) GENERATION AND… Status: Active | Hunt Construction Group Inc | $10.5M |
| applied Nov 6 | #B200450056 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 1 CIRCUITS TO EXISTING 225 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TI @ C23. Status: Complete | Hartmann Electric Company, Inc | $1.5K |
| applied Nov 4 | #B200449642 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: T5 M19. Status: Complete | Hartmann Electric Company, Inc | $20K |
| applied Oct 30 | #B200449105 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Oct 30 | #B200449106 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Oct 30 | #B200449111 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Oct 30 | #B200449108 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Oct 30 | #B200449110 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jul 17 | #101071588 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: SHALLOW FOUNDATIONS AND BELOW GRADE SUBSTRUCTURE PERMIT FOR BASEMENT LEVEL OF PROPOSED SATELLITE 1 CONCOURSE TERMINAL BUILDING AT O'HARE INTERNATIONAL AIRPORT. INCLUDES UNDERGROUND ELECTRICAL AND PLUMBING SCOPE OF WORK. CAISSONS ONLY PERMIT UNDER 101066936. ERS ONLY PERMIT UNDER… Status: Phased Permitting | Hunt Construction Group Inc | $100M |
| applied Oct 13 | #B200446580 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 3. Status: Complete | Hartmann Electric Company, Inc | $1.2K |
| applied Oct 13 | #B200446509 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING OTHER. SPECIFIC LOCATION: G CONCOURSE T3 PENTHOUSE. Status: Complete | Hartmann Electric Company, Inc | $2.5K |
| applied Oct 8 | #B200445988 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL OTHER. SPECIFIC LOCATION: T5 U922. Status: Complete | Hartmann Electric Company, Inc | $8.5K |
| applied Sep 22 | #101074332 PERMIT - RENOVATION/ALTERATION 2019 CHICAGO BUILDING REHAB CODE TITLE 14RTHIS PROJECT CONSISTS OF ADDING 2 STEEL POST STRUCTURES AND CONCRETE FOUNDATIONS TO SUPPORT 2 DIGITAL SIGNS, WITH ASSOCIATED ELECTRICAL HOOKUP ON THE EXTERIOR BAGGAGE TUNNEL DRIVEWAY ENTRANCES AT GRADE LEVEL. Status: Active | Builders Chicago Corporation | $630K |
| applied Sep 26 | #B200443356 PERMIT – EXPRESS PERMIT PROGRAM · Construction Trailer 1 TEMPORARY TRAILER(S) IN CONNECTION WITH WORK UNDER PERMIT 101074603. PERMIT START DATE: 9/26/2025. PERMIT DURATION: 1 YEARS. Status: Complete | Clune Construction Company, L.P. | — |
| applied Sep 30 | #B200444777 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200444782 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Sep 29 | #B200444640 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING DATA/VIDEO. SPECIFIC LOCATION: TERMINAL 1. Status: Complete | Hartmann Electric Company, Inc | $25.5K |
| applied Sep 30 | #B200444776 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Sep 30 | #B200444785 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Sep 29 | #B200444650 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 1. Status: Complete | Hartmann Electric Company, Inc | $4.5K |
| applied Sep 30 | #B200444780 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Apr 8 | #101066936 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: CAISSONS ONLY (VERTICAL PENETRATION ONLY) PERMIT FOR PROPOSED SATELLITE 1 CONCOURSE TERMINAL BUILDING AND CONNECTOR BRIDGE TO CONCOURSE C OF EXISTING TERMINAL 1 AT O'HARE INTERNATIONAL AIRPORT (CONSTRUCTION TYPE IB, OCC GROUP A-2, A-3, F-1, S-2). CDA PROJECT NO - TAP105.19-00.… Status: Phased Permitting | Hunt Construction Group Inc | $10M |
| applied Sep 18 | #B200443031 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 1 CIRCUITS TO EXISTING 600 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL #5. Status: Complete | Hartmann Electric Company, Inc | $7.5K |
| applied May 7 | #101068757 PERMIT - NEW CONSTRUCTION DDS 2019 CBC: PERMANENT CUT OFF WALL (PERMANENT EARTH RETENTION SYSTEM) ONLY PERMIT INCLUDING EXCAVATION FOR PROPOSED SATELLITE 1 CONCOURSE BUILDING AND PORTION OF PROPOSED CONSOLIDATED TUNNEL BETWEEN FUTURE OHARE GLOBAL TERMINAL AND FUTURE SATELLITE 2 CONOCURSE BUILDINGS AT O'HARE INTERNATIONAL… Status: Suspended | Hunt Construction Group Inc | — |
| applied Sep 15 | #B200442528 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 15 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 5. Status: Complete | Hartmann Electric Company, Inc | $20K |
| applied Sep 15 | #B200442532 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL 3 L28. Status: Complete | Hartmann Electric Company, Inc | $5.5K |
| applied Apr 17 | #101065085 PERMIT - NEW CONSTRUCTION SPR 2019 CBC: FULL BUILDING PERMIT FOR THE CONSTRUCTION OF NEW MIDFIELD COOLING PLANT (MCP) (O'HARE BUILDING 240), MIDFIELD COOLING TOWER (O'HARE BUILDING 241), INCLUDING DEEP FOUNDATIONS AND SITEWORK SERVING THE PLANT. (OCC. F-1; TYPE IIB CONST.) CDA PROJECT - HEATING AND REFRIGERATION (H&R)… Status: Active | Hunt Construction Group Inc | $85M |
| applied Sep 5 | #B200441266 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: T5 M38. Status: Complete | Hartmann Electric Company, Inc | $15K |
| applied Sep 4 | #B200441146 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING OTHER. SPECIFIC LOCATION: TERMINAL 1 AND 2. Status: Active | Hartmann Electric Company, Inc | $550K |
| applied Aug 27 | #B200437104 PERMIT – EXPRESS PERMIT PROGRAM · Administrative Change FOR PERMIT B200430745: ADDITIONAL OTHER CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. Status: Complete | Hayes Commercial LLC | — |
| applied Aug 28 | #B200440088 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 15 CIRCUITS TO EXISTING 800 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 15 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: GATE G7 G9 G13 G11 G2. Status: Complete | Maron Electric Company | $350K |
| applied Aug 28 | #B200440089 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. ADD 30 CIRCUITS TO EXISTING 800 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 30 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: E15 E17 G2 G3 G17 G20. Status: Complete | Maron Electric Company | $1M |
| applied Aug 27 | #B200439978 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200439993 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200439986 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200439975 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Aug 27 | #B200439982 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Aug 26 | #B200439745 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 5 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TERMINAL #1 @B10. Status: Complete | Hartmann Electric Company, Inc | $10.5K |
| applied Aug 12 | #B200437822 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 400 AMP SERVICE DISCONNECTING MEANS WITH 42 CIRCUITS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: CAB HILL ORD. Status: Complete | Hartmann Electric Company, Inc | $20K |
| applied Aug 14 | #101073043 PERMIT - RENOVATION/ALTERATION DS 2019 CBRC: ERS/EX ONLY USING STABILIZATION PILES FOR THE RENOVATION OF EXISTING 2-STORY WITH 1 LEVEL BELOW GRADE AT TERMINAL 3 OF O'HARE INTERNATIONAL AIRPORT. CAISSONS ONLY PERMITTED UNDER D23030-01, FULL BUILDING PERMIT UNDER D23030-03. (CONSTRUCTION TYPE IB, OCC GROUP A-3, B, F-1, A-2). CDA… Status: Suspended | Clark - W.E. O'neil JV | $1.1M |
| applied Aug 12 | #B200437710 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL OTHER. SPECIFIC LOCATION: TERMINAL #5. Status: Complete | Hartmann Electric Company, Inc | $85K |
| applied Aug 8 | #B200429816 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 64.76 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Aug 4 | #B200436602 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNITED AIRLINES TERMINAL #1 C CONCOURSE. Status: Complete | Hartmann Electric Company, Inc | $15.5K |
| applied Jul 29 | #B200435835 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LINE VOLTAGE ELECTRICAL WORK. OUTDOOR LIGHTING FOR 50000 SQUARE FEET. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 6. SPECIFIC LOCATION: ORD PARKING LOT B. Status: Suspended | D N D Electric, Inc. | $690K |
| applied Jul 31 | #B200436226 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 8/1/2025. END DATE: 8/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jul 31 | #B200436230 PERMIT – EXPRESS PERMIT PROGRAM · Monthly Maintenance Permit ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: BUSINESS. START DATE: 8/1/2025. END DATE: 8/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND… Status: Complete | Hartmann Electric Company, Inc | — |
| applied Jul 16 | #101071803 PERMIT - RENOVATION/ALTERATION SELF-CERT 2019 CBRC: REVISION TO PERMIT #101067372 TO SHOW NEW OFFICE, READY ROOM, TIRE ROOM AND BREAKROOM CONFIGURATIONS REVISE MECHANICAL, ELECTRICAL AND PLUMING TO ACCOMMODATE ARCHITECTURAL CHAGES IN G APRON TERMINAL 3 PER PLANS. (USE GROUP B CONSTRUCTION TYPE IA) Status: Suspended | Northwest Contractors, Inc | $250K |
| applied Jul 14 | #101071696 PERMIT - RENOVATION/ALTERATION SELF-CERT 2019 CBRC: REVISION TO PERMIT #101064700 TO ADD NEW ELEVATOR LOBBY, CHANGE WALL TYPE IN IN TIRE ROOM TO CMU, ADD TRENCH DRAIN, OIL INTERCEPTOR AND ASSOICATED PIPING IN TIRE ROOM, REVISE HVAC IN BREAKROOM REVISE MECHANICAL, ELECTRICAL AND PLUMING TO ACCOMMODATE ARCHITECTURAL CHAGES. (USE… Status: Active | Northwest Contractors, Inc | $50K |
| applied Jun 23 | #B200430745 PERMIT – EXPRESS PERMIT PROGRAM · Nonstructural Interior Work SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISTING LOCKER ROOM, TO INCLUDE ADDITION OF NEW PARTION, FINISHES, PLUMBING, ELECTRICAL AND DUCTWORK. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), TERMINAL 1 - CONCOURSE C - BASEMENT LEVEL. Status: Complete | Rossi Contractors, Inc | $50K |
| applied Jun 17 | #101070645 PERMIT - RENOVATION/ALTERATION INTERIOR RENOVATION OF TWO HOTEL GUESTROOMS TO FUNCTION AS 'MODEL ROOMS' FOR AN EVENTUAL WHOLE BUILDING RENOVATION OF ALL GUESTROOMS. RENOVATION SCOPE CONSISTS OF REMOVAL AND RELOCATION OF SOME INTERIOR PARTITIONS AND CEILINGS, REWORKING OF MECHANICAL, PLUMBING AND ELECTRICAL DISTRIBUTION WITHIN… Status: Complete | Level General Contractors, LLC | $500K |
| applied Jun 25 | #B200419782 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 5.37 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Jun 18 | #B200428677 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. ALTER EXISTING LIGHTING. SPECIFIC LOCATION: LOBBY OF HOTEL. Status: Complete | Hilton Chicago Corporation | $3K |
| applied Apr 29 | #101068492 PERMIT - RENOVATION/ALTERATION RENOVATING AN EXISTING STORAGE ROOM AND JANITORS CLOSET INTO 5 SINGLE USER RESTROOMS WITHIN THE LOWER LEVEL OF THE HILTON OHARE HOTEL. THE BUILDING IS AN EXISTING RESIDENTIAL BUILDING WITH ACCESSORY OCCUPANCIES, ONE OF WHICH IS STORAGE. THE NEW RESTROOMS DO NOT HAVE AN OCCUPANCY IN AND OF… Status: Active | Level General Contractors, LLC | $400K |
| applied May 6 | #B200420797 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 10.05 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Apr 29 | #B200421997 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 999 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Apr 29 | #B200420735 PERMIT – EXPRESS PERMIT PROGRAM · Storm Water Management Plan APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: AIRPORT. PROJECT AREA: 38.6 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). Status: Active | Not published | — |
| applied Apr 15 | #101067914 PERMIT - RENOVATION/ALTERATION SELF-CERT 2019 CBRC: REVISIONS TO PREVIOUSLY PERMITTED (#101061323) WORK INCLUDING RENOVATION OF EXISTING OFFICES INCLUDING REMOVING/RELOCATION EXISTING FURNITURE, REPAINTING EXISTING WALLS AND DOORS, AND BUILDING NEW WALLS/DOORS AND ADDING NEW DATA PORTS. CONST. TYPE 1-B. OCCS. A-3, B. Status: Suspended | F.H. Paschen, S.N. Nielsen & Associates, LLC. | $131K |
| applied Apr 14 | #101067372 PERMIT - RENOVATION/ALTERATION SELF-CERT 2019 CBRC: ALTERATIONS TO EXISTING OFFICE SPACE, BREAK ROOM, LOCKER ROOM AND WASHROOMS IN G APRON TERMINAL 3 PER PLANS. (USE GROUP B CONSTRUCTION TYPE IA) Status: Active | Northwest Contractors, Inc | $3M |
| applied Mar 26 | #101064700 PERMIT - RENOVATION/ALTERATION SELF-CERT 2019 CBRC: ALTERATIONS TO EXISTING OFFICE SPACE, BREAK ROOM, WASHROOMS AND CONSTRUCT NEW ELEVATOR SHAFT IN L APRON TERMINAL 3 PER PLANS AND STRUCTURAL PEER REVIEW. (USE GROUP B CONSTRUCTION TYPE IA) Status: Active | Northwest Contractors, Inc | $3M |
| applied Feb 21 | #B200414563 PERMIT – EXPRESS PERMIT PROGRAM · Nonstructural Interior Work SCOPE: NONSTRUCTURAL INTERIOR REFRESH OF EXISTING STARBUCKS KIOSK, REPLACE TRIM, COUNTER AND EQUIPMENT, INSTALL NEW CIRCUITS, REMOVE ONE SINK, ALL OTHER PLUMBING FIXTURES TO REMAIN. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), TERMINAL 3, HK FOOD COURT. Status: Suspended | Ornelas Construction Company | $100K |
| applied Feb 19 | #B200414431 PERMIT – EXPRESS PERMIT PROGRAM · Plumbing Work REPAIR OR IN-KIND REPLACEMENT OF 7 PLUMBING FIXTURES AS DESCRIBED IN PERMIT APPLICATION. INCLUDES REPAIR OR REPLACMENT OF PLUMBING PIPING. LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, TERMINAL 1 GATE B9. Status: Complete | Terry Plumbing A Matrix Holdings, LLC Company | $20K |
| applied Jan 15 | #101063313 PERMIT - RENOVATION/ALTERATION SELF-CERT: 2019 CBRC: INTERIOR WORK ONLY. INTERIOR ALTERATION AND RENOVATION WORK TO CONSTRUCT AN APPROXIMATE 5,037 SF AIRPORT LOUNGE AT CHICAGO O'HARE INTERNATIONAL AIRPORT, ON THE UPPER LEVEL OF CONCOURSE M AT TENANT SPACE U635. WORK IS ANTICIPATED FOR PLUMBING SANITARY ROUTING BELOW ON THE… Status: Complete | Power Construction Company, LLC | $4.5M |
| applied Oct 28 | #101061413 PERMIT - RENOVATION/ALTERATION RENOVATION OF EXISTING OFFICES INCLUDING REMOVING/RELOCATION EXISTING FURNITURE, REPAINTING EXISTING WALLS AND DOORS, AND BUILDING NEW WALLS/DOORS AND ADDING NEW DATA PORTS. Status: Suspended | F.H. Paschen, S.N. Nielsen & Associates, LLC. | $552K |
| applied Oct 22 | #101061323 PERMIT - RENOVATION/ALTERATION RENOVATION OF EXISTING OFFICES INCLUDING REMOVING/RELOCATION EXISTING FURNITURE, REPAINTING EXISTING WALLS AND DOORS, AND BUILDING NEW WALLS/DOORS AND ADDING NEW DATA PORTS. Status: Active | F.H. Paschen, S.N. Nielsen & Associates, LLC. | $5M |
| applied Oct 28 | #B200403600 PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: TRAFFIC TUNNEL UNDER TAXIWAY LIMA & KILO AT O'HARE. Status: Complete | Connelly Electric Co. | $2.5M |