Get ProEvery project in every city · from $33/mo
Get Promultifamily project · San Francisco, CANew: first permit Oct 28
Multifamily General Building work permitted October 28, 2026, declaring $8,000 of work.
repair limited non-structural dryrot siding and replace approx. 400 sq ft of deteriorated mood siding at the rear, non-street facing wall. new siding to match, from wood to cement board following same style. (e) horizontal lap design. no changes to window or doors. waterproofing.
This is a new project: its first permit was issued October 28, 2026. The contractor on it is included with Pro, with the phone number, and is named here 30 days after the first permit.
See the contractor1 permit issued Oct 28 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 28 | #202610289998 otc alterations permit |
Commercial and multifamily, biggest first.
repair limited non-structural dryrot siding and replace approx. 400 sq ft of deteriorated mood siding at the rear, non-street facing wall. new siding to match, from wood to cement board following same style. (e) horizontal lap design. no changes to window or doors. waterproofing.
Status: Issued
| Contractor with Pro |
| $8K |