Get ProEvery project in every city · from $79/mo
Get Pro118 building permits on commercial and multifamily jobs in the last 90 days, declaring $325M of work. See the contractor on every job and get new ones by email each morning.
Newest permit in Cambridge issued October 28, 2026
Updated daily
$2.4M
All work is limited to open air concrete garage area. No scheduled work within the building/hotel - Concrete spalling repairs to columns and parking deck with temp shoring within…
this space currently is restaurant, adding a Sushi bar, and repaint the wall, no other change. no Plumbing and electrical change or add on.
| Week of | Permits |
|---|---|
| Jul 27 | 0 |
| Aug 3 | 12 |
| Aug 10 | 16 |
| Aug 17 | 6 |
| Aug 24 | 2 |
| Aug 31 | 12 |
| Sep 7 | 4 |
| Sep 14 | 7 |
| Sep 21 | 10 |
| Sep 28 | 10 |
| Oct 5 | 8 |
| Oct 12 | 15 |
| Oct 19 | 12 |
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Contractors are named 30 days after the first permit; Pro sees them the day it’s issued.
All Work done on second floor right side as outlined in plans.Refresh of current millwork that is in the space new doors / hardware. Additional 3 cabinets and sinks going into 3…
COMMERCIAL (BANK) INTERIOR LEVEL 2 ALTERATION OF A SINGLE STORY SPACE WITH NO BASEMENT.INTERIOR SCOPE OF WORK INCLUDES:FURNITURE, EQUIPMENT, FINISHES WITH LIMITED INTERIOR WALL…
$275K
Remove non-structural interior components of home. Update all wiring and plumbing to code to accomodate new cabinets, appliances, plumbing fixtures and HVAC. New board,…
$387K
This Project involves the construction required for the interior fit-out of approximately 5,200 GSF on the second floor of 14 Story Street for HCP office space. The existing…
| Issued | Project | Type | Project value | Contractor |
|---|---|---|---|---|
| Oct 28 | All work is limited to open air concrete garage area. No scheduled work within the building/hotel - Concrete spalling repairs to columns and parking deck with temp shoring within… | commercialBuilding | $2.4M | Bond Building |
| Oct 28 | this space currently is restaurant, adding a Sushi bar, and repaint the wall, no other change. no Plumbing and electrical change or add on. | commercialBuilding | $35K | Feng Chen |
| Oct 28 | All Work done on second floor right side as outlined in plans.Refresh of current millwork that is in the space new doors / hardware. Additional 3 cabinets and sinks going into 3… | commercialBuilding | $157K | Dog Demo Llc |
| Oct 26 | COMMERCIAL (BANK) INTERIOR LEVEL 2 ALTERATION OF A SINGLE STORY SPACE WITH NO BASEMENT.INTERIOR SCOPE OF WORK INCLUDES:FURNITURE, EQUIPMENT, FINISHES WITH LIMITED INTERIOR WALL… | commercialBuilding | $1.1M | Contractor with ProPro |
| Oct 22 | Remove non-structural interior components of home. Update all wiring and plumbing to code to accomodate new cabinets, appliances, plumbing fixtures and HVAC. New board,… | multifamilyBuilding | $275K | Contractor with Pro |
| Oct 22 | This Project involves the construction required for the interior fit-out of approximately 5,200 GSF on the second floor of 14 Story Street for HCP office space. The existing… | commercialBuilding | $387K | Contractor with Pro |
112 more projects on commercial jobs in the last 90 days
Unlock all 118 projectsEvery project, contractor and phone number · from $79/mo · cancel anytime