Commercial General Building work permitted April 14, 2025, with 4 permits through October 14, 2026, declaring $11,317,197 of work. Contractor on record: Chapman Construction/ Design.
The build is a +/-17,500 SF interior fit-out on the 6th floor. No make-safe or demolition is required as part of this project. Scope includes new finishes throughout, partition walls, millwork, furniture and lab benches, bathrooms, lab plumbing, cleanroom, new HVAC and electrical infrastrucure and distrubition, new lighting, and networking.
Cambridge permit records name Chapman Construction/ Design and Total Construction Solutions as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor4 permits issued Apr 14 – Oct 14, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Sep 30 | #1232641 Building: Alteration and Addition Replacement of existing asphalt paving with concrete. One for one replacement of overhead door. Status: Active | Contractor with Pro | $79.5K |
| applied Oct 9 | #1186653 Building: Alteration and Addition Renovation of existing lab spaces - new cleanroom walls and ceilings, new finishes, new process piping, new hvac including ductwork and equipment, new electical including power, lighting, and fire alarm. Status: Active | Chapman Construction/ Design | $3M |
| applied Mar 19 | #1156360 Building: Alteration and Addition Tank Pad 12: thick steel reinforced approx 540 sqft and fenced in with bollards , On exiterior of building for 3000 gal cryogenic tank and vaporizers. Status: Active | Total Construction Solutions | $37.7K |
| applied Jan 27 | #1149818 Building: Alteration and Addition The build is a +/-17,500 SF interior fit-out on the 6th floor. No make-safe or demolition is required as part of this project. Scope includes new finishes throughout, partition walls, millwork, furniture and lab benches, bathrooms, lab plumbing, cleanroom, new HVAC and electrical infrastrucure and… Status: Active | Chapman Construction/ Design | $8.2M |