Issued Dec 23
$55M
IQHQ 5AP - 1, 2, 3rd floor Tenant fit out for approx 146,000 square feet for a leading robotics co, facility to span 3 floors and designed to support advanced research,…
Get ProEvery project in every city · from $33/mo
Get ProMonthly permit report
By declared value.
Issued Dec 23
$55M
IQHQ 5AP - 1, 2, 3rd floor Tenant fit out for approx 146,000 square feet for a leading robotics co, facility to span 3 floors and designed to support advanced research,…
Issued Dec 19 · 10 permits
$8.2M
Interior Fit-out within an existing building. The alterations do impact or change the construction type, occupancy class, or use group. Work scope for this project includes…
Issued Dec 18 · 2 permits
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$8.2M
Remove (2) existing boilers and replace with (2)in kind duel fueled boilers. Work to include electrical, plumbing and the modification of existing fire alarm devices.
Issued Dec 10 · 3 permits
$3.1M
Construction of new Ji Physics Lab. New concrete equipment pit. New AHU, chiller and MEP equipment to facility lab requirements. New lab gases, plumbing and electrical. New…
Issued Dec 8 · 2 permits
$1.4M
Renovation and fit-up of dental office in wood structure to install new dentist office. Structural modifications as required by structural engineer, including new stairs.…
Issued Dec 1 · 2 permits
$1.4M
Perform interior renovations to areas affected by fire. Work includes interior work within (4) residential areas and (2) commercial spaces renovating spaces to conditions prior…
Issued Dec 19
$1.3M
Install new fire alarm system at Walbach Hall.
Issued Dec 19 · 2 permits
$1.2M
Reconfiguration of exisiting lab on the 4th floor of building 35 Project includes reconfiguration of partions,doors and new fiinshes to support new layout As well as MEP…
Issued Dec 30 · 3 permits
$845K
Restaurant buildout for "Naya". Space was formerly Clover restaurant. Work includes modifications to the interior to update the layout, fixtures, finishes, furniture with…
Issued Dec 9
$822K
Interior finishes renovation of 2 existing classrooms within the Gutman Library
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026