Get ProEvery project in every city · from $33/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted May 9, 2025, with 15 permits through October 27, 2026, declaring $165,051,740 of work. Contractor on record: Prime Electric.
Refrigeration scope includes 1 R-410A VRF system and 38 R-454B mini-split systems, including all associated refrigeration piping, indoor units, and outdoor condensing units. Work to comply with the Seattle Mechanical Code and ASHRAE 15.
Seattle permit records name Prime Electric, EC Electric and Tapps Electric as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 7 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
15 permits issued May 9 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7169363-EL Electrical · Electrical We are restoring power to 3 parking lot lights Status: Issued | Contractor with Pro | — | |
#7168338-EL Electrical · Electrical MEMORIAL STADIUM RENNOVATION-LV - Job 5004293: Low voltage- CATEGORY 6 NETWORK CABLING, FIBER BACKBONE. Status: Issued | Contractor with Pro | — | |
#7168356-EL Electrical · Electrical MEMORIAL STADIUM RENNOVATION-AV - Job #5004314: Low voltage- AV cabling for bowl speaker system, fiber and copper for AV camera system. Status: Issued | Contractor with Pro | — | |
#7168365-EL Electrical · Electrical MEMORIAL STADIUM RENNOVATION-SEC - Job 5004315: Low voltage- SECURITY CABLING FOR ACCESS CONTROL AND CCTV LOCATIONS. Status: Issued | Contractor with Pro | — | |
| applied Oct 1 | #7164295-FS Fire Sprinkler and Suppression · Trade Memorial Stadium project. Applying for water service from behind the vault to the building. Status: Issued | Not published | $20K |
| applied Oct 15 | #7167653-RF Refrigeration · Trade Refrigeration scope includes 1 R-410A VRF system and 38 R-454B mini-split systems, including all associated refrigeration piping, indoor units, and outdoor condensing units. Work to comply with the Seattle Mechanical Code and ASHRAE 15. Status: Issued | Contractor with Pro | $140M |
| applied Apr 14 | #7138170-EL Electrical · Electrical ***Joint Venture w/Prime Electric*** New EST-4 Addressable fire alarm system with voice notification. We are using the PS system for alert and Evacuation messages for the grandstands and restrooms. Status: Issued | Contractor with Pro | $83.9K |
#7163286-EL Electrical · Electrical Install (2) heat trace circuits. Wiring from panels breaker to controller locations by others. Job# 837039 Status: Issued | EC Electric | — | |
| applied Mar 13 | #7133295-FS Fire Sprinkler and Suppression · Trade INSTALLATION OF NEW WET/DRY SPRINKLER SYSTEMS THROUGHOUT MODIFIED STADIUM. Status: Issued | Not published | $686K |
| applied Mar 27 | #7053732-PH New · Building Phased project: Construct stadium (Memorial Stadium) and associated site improvements occupy per plan. Mechanical included. Status: Issued | Not published | $13.6M |
#7107821-EL Electrical · Electrical extend 200A circuit from existing 200A disconnect on in mccaw hall to fed TPU skid Status: Completed | Tapps Electric | $3K | |
| applied Jul 21 | #7092124-CN New · Building Shoring for future construction of Memorial Stadium's at the NW Fleet Storage/Concessions building per plan. Status: Issued | Scott Solberg | $700K |
| applied Jun 20 | #7092296-EL Electrical · Electrical Job 6007783: Construction of a new athletic stadium for Seattle Public Schools on the site of the existing Memorial Stadium after the existing stadium is demolished. Open-air seating bowl surrounded by a main concourse. Free-standing single-story buildings containing restrooms, concessions, and… Status: Issued | Prime Electric | $8.2M |
| applied Mar 24 | #7037760-CN New · Building Shoring and excavation for future construction of a stadium (Memorial Stadium) per plan. Status: Issued | Not published | $1.5M |
| applied Apr 28 | #7082343-EL Electrical · Electrical Job 6007783: Temporary power service and distribution for construction of a new sports stadium. Contact: Mike Austin 206-396-8083 [9/26/25 VR, project scope moved to 7107395-EL - Tapps Electric to maintain/build remaining temp power, Prime Electric new construction only moving forward. Closing… Status: Completed | Prime Electric | $250K |
In Seattle, biggest first.