Commercial General Building, Electrical, Elevator work permitted July 21, 2025, with 9 permits through June 12, 2026, declaring $125,354,824 of work. Contractor on record: Prime Electric.
Phased project: Construction of residential/retail high rise building occupy per plan.
Seattle permit records name Prime Electric, Otis Elevator Company and Ocean Park mechanical as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Jul 21 – Jun 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7147634-CY Conveyance · Trade Installation of roped hydraulic elevator - Car E 6905992-PH (Phased Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Issued |
| Otis Elevator Company |
| $435K |
#7132878-EL Electrical · Electrical 121 Boren - Job 6008063: Temp Power Connections from Dist Switchboard Status: Issued | Prime Electric | — |
| applied Nov 14 | #7115874-CN New · Building Construct new pedestrian tunnel in SDOT right of way occupy per plan. (Construction pedestrian tunnel in right of way to connect two mixed-use buildings per plan. Review and process for 2 CN's under 7115874-CN.) Status: Issued | Not published | $83.8K |
| applied Mar 10 | #7074588-EL Electrical · Electrical LAND USE APPLICATION TO ALLOW A 48-STORY TOWER WITH 478 RESIDENTIAL UNITS, 1,590 SQ. FT. COMMERCIAL USES AND BELOW GRADEPARKING GARAGE FOR 98 EHICLES. PROPOSAL INCLUDES DEMOLITION OF AN EXISTING ONE STORY BUILDING. Status: Issued | Prime Electric | $12M |
| applied Oct 22 | #7112953-EL Electrical · Electrical 121 Boren - Job 6007567: Distribution switchboard only, does not include equipment connections. Site contact: Paul Mattoon (425) 351-2074 Status: Issued | Prime Electric | $120K |
#7117574-EL Electrical · Electrical 121 Boren Temp Power - Job 6007567: OTC permit for the installation of (1) 35kW portable generator - to be used to power temp site office trailer. Site contact: Paul Mattoon (425) 351-2074 Status: Completed | Prime Electric | $1.3K |
| applied Feb 15 | #6905992-PH New · Building Phased project: Construction of residential/retail high rise building occupy per plan. Status: Phase Issued | Not published | $112M |
#7104278-EL Electrical · Electrical Move 1 fan coil and add 3 fan coils to level 13. Add Space temperature sensor. Status: Completed | Ocean Park mechanical | $5K |
| applied Nov 11 | #6767882-CN New · Building Shoring and excavation for future high-rise building per plan. Review and processing for (2) records on 6767882-CN Status: Issued | Not published | $500K |