Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted November 13, 2024, with 146 permits through October 27, 2026, declaring $30,334,260 of work. Contractor on record: Titan Electric Inc.
Construct blanket permit tenant improvements to JP Morgan Chase on floors: 14 22 23 24 and 25 of existing commercial building per plan.
Seattle permit records name Titan Electric Inc, Chinook Elevator Solutions LLC and Cochran Inc as the contractors on this project, among 21 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
Commercial and multifamily, biggest first.
146 permits issued Nov 13 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7169379-EL Electrical · Electrical Conduit Pathway & Boxes Only on Floors 15, 16 & 18 Status: Issued | Contractor with Pro | — | |
| applied Oct 15 | #7166591-SB Sign, Awning and Canopy · Trade Installation of a non-illuminated blade sign above business entrance Status: Issued | Contractor with Pro | $3.5K |
#7165324-EL Electrical · Electrical Furnish and install 1 Outlet for TV. Job#:2601537 Status: Issued | Contractor with Pro | — | |
#7162858-EL Electrical · Electrical Adding 50amp California style receptacles on levels 15,16, and 18. 2 per floor. Job 531246 Status: Issued | Cochran Inc | — | |
#7160971-EL Electrical · Electrical 2 Existing Booth Power & LV Decom 1 Furnish and Install NEW Clock Plug Outlets with Constant Power 2 Furnish and Install NEW Clock Plug Outlets with Existing Controlled Power for PN-05 NEW Sales Office Lightbox 3 Furnish and Install NEW Clock Plug Outlets with Relocated Power & Data for PN-04 NEW… Status: Issued | Titan Electric Inc | — | |
#7158651-EL Electrical · Electrical 20 Remove Existing Fire Caulking in Telco Sleeving - B1 to 19th Flr 20 Furnish and Install Multimode 6 Strand Fiber - B1 to Suite 1950 Demark 20 Furnish and Install Fiber Support & Dressing - B1 to Suite 1950 Demark 20 Reinstall Fire Caulking in Telco Sleeving - B1 to 19th Flr Job#:2601443 Status: Issued | Titan Electric Inc | — | |
#7154675-EL Electrical · Electrical 2645049 - RIC L39 Zillow TI HVAC Controls Cabling Status: Issued | Titan Electric Inc | — | |
#7152409-EL Electrical · Electrical SOW: Disconnect/Reconnect (2) HUBs. Location: Office 1 / CCR 1. Two trips during business hours Status: Completed | Not published | — | |
| applied Jun 16 | #7148391-CN Addition/Alteration · Building Tenant improvements at level 1 (coat check) of existing art museum (Seattle Art Museum) subject to field inspection. Status: Issued | Not published | $167K |
| applied Jun 26 | #7150273-FS Fire Sprinkler and Suppression · Trade Install Ansul R102 fire suppression system into Wells self contained hood Status: Completed | Vulnix Fire Protection | $1K |
#7150281-FS Fire Sprinkler and Suppression · Trade RELOCATE 3 SPRINKLERS FOR ELEVATOR WORK. Status: Issued | Viking Automatic Sprinkler - Seattle | $7K | |
#7149408-EL Electrical · Electrical Running Fiber to 19Floor to server room. Job#:2601316 Status: Issued | Titan Electric Inc | — | |
| applied Apr 22 | #7139173-ME Mechanical · Trade Add (1) FCU, (1) Duct Heater. Extend Chilled Water Piping to new location, Relocate (1) VAV box. Demo (2) VAV boxes. per plans Status: Completed | Not published | $70K |
#7147794-EL Electrical · Electrical Pull from B1 South Telco up to 3rd Floor South Telco Job#:2601295 Status: Completed | Titan Electric Inc | — | |
#7147385-EL Electrical · Electrical Single notification device for conference room. J00300247 joint venture with Titan Electric Status: Issued | Convergint Technologies | — | |
#7147186-EL Electrical · Electrical 4 smoke detectors added for door release on L23. Status: Issued | Convergint Technologies | — | |
#7146437-EL Electrical · Electrical Floor 23 (7) conference rooms - audio/network cabling pull Floor 25 (6) conference rooms - audio/network cabling pull also: (2) wallmounted TVs - network cabling pull Status: Completed | Advantage Audio Visual Systems, LLC | — | |
| applied Jun 2 | #7145777-ME Mechanical · Trade Relocate (1) VAV to serve new space. New MP and LP duct. Balance (2) VAV zones. Subject to Field Inspection - STFI Status: Completed | Not published | $20K |
#7143882-EL Electrical · Electrical 1 Controlled Quad Outlet and Data Ring, 1 Controlled Duplex Outlet and Data Ring, 3 Controlled Duplex Outlets, 3 Install Existing Linear Pendants Job#:2601189 Status: Completed | Titan Electric Inc | — | |
#7143937-EL Electrical · Electrical I am installing (24) new Category 6 Plenum Cables for new workstation, WIFI, speaker and Camera Locations. Devices installed by tenant Status: Completed | Interface Technologies Northwest | — | |
#7140353-EL Electrical · Electrical Pulling Fiber to between Flr 17 and Flr 2. Job#:2601211 Status: Completed | Titan Electric Inc | — | |
#7139444-EL Electrical · Electrical Install controls for FCUs, energy recovery ventilator, kitchen fan, transfer fan, interlock, water meter, water heater. Connect 120v to new lv transformer. titan electric job #2542108 Status: Completed | Titan Electric Inc | — | |
#7138641-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - Added 2 upright sprinklers - Modify existing sprinkler system for new wall and ceiling layout. New sprinklers to match type and size of existing. Zillow floor 39 conference room Status: Completed | Not published | $2.8K | |
#7138093-EL Electrical · Electrical 6 Furnish and Install 20amp Bolt breakers - Job#:2611255 Status: Completed | Titan Electric Inc | — | |
| applied Apr 6 | #7136951-EL Electrical · Electrical Replacement of (2) 125HP Fire Pump Controllers on floor P3 and (2) 100HP Fire Pump Controllers on floor 18 [4/9/26 KEF - Plan set approved. Note - Per drawings, the P3 scope of work is (2) new controllers for 20A generator fuel pumps, not 125HP fire pumps.] Status: Completed | Titan Electric Inc | $250K |
| applied Mar 17 | #7130999-CN Addition/Alteration · Building Construct interior alterations to portions of 12th floor to create new elevator lobby per plan. Status: Issued | Not published | $125K |
| applied Mar 27 | #7135631-CN Addition/Alteration · Building Construct tenant improvement to office space subject to field inspection STFI. Status: Completed | Not published | $60.9K |
#7134162-EL Electrical · Electrical 2543028 - JPMC Seattle Phase 2 + 3 Security Security doors and camera install. Russell Investment Center. 23rd floor and 25 floor. Status: Completed | Titan Electric Inc | — | |
#7131344-EL Electrical · Electrical Floor 23 and Floor 25 : (6) Zoom Huddle rooms (teleconferencing wire) and (2) TVs wallmounted. Status: Completed | Advantage Audio Visual Systems, LLC | — | |
| applied Feb 3 | #7127745-EL Electrical · Electrical Joint Venture with Titan - (285026) Change of fire pumps on P3 and lv8. Total of 8 modules. Status: Issued | Titan Electric Inc | $6K |
#7130687-EL Electrical · Electrical Installing controls for (4) CHW FCUs, (1) Duct heater, (3) fans, (41) VAVs. Titan Electric job #2542044 Status: Completed | Titan Electric Inc | — | |
#7130105-EL Electrical · Electrical 2643022 TD JPMC 23rd and 25th Sound Masking Status: Completed | Titan Electric Inc | — | |
#7129447-EL Electrical · Electrical 75kva transformer & 200amp Panel swap Job#:2501679 Status: Completed | Titan Electric Inc | — | |
#7128504-EL Electrical · Electrical Status: Issued | Titan Electric Inc | — | |
#7126629-EL Electrical · Electrical INSTALL CATEGORY 6A CABLES TO (27) DATA OUTLET LOCATIONS, (5) CEILING DEVICE LOCATIONS, AND (2) DATA RACK LOCATIONS. INSTALL FIBER OPTIC CABLE TO (2) DATA RACK LOCATIONS. DEMO OLD CABLES FROM (26) LOCATIONS. TOTAL (1) CONTROL UNIT AND (36) OUTLET/DEVICE LOCATIONS. PROJECT #528208 SITE CONTACT:… Status: Completed | Cochran Inc | — | |
| applied Dec 18 | #7121837-EL Electrical · Electrical Existing EST3 Addressable Fire Alarm System with voice evacuation. Remove, relocate and new notification devices to support new room layout. Existing power supply will be used to support new/relocated strobes. Existing EST3 speaker amplifier will be used to support new/relocated speakers. Status: Issued | OEG, Inc | $7K |
| applied Aug 26 | #7103356-EL Electrical · Electrical Multi floor tenant improvement project of commercial office space. Including installation of new panelboards, new breakers as needed, low voltage cabling, receptacles, light fixtures, lighting controls, furniture feeds and panel to panel connections, floor boxes, and mechanical power connections. Status: Completed | Titan Electric Inc | $1.5M |
#7123841-FS Fire Sprinkler and Suppression · Trade relocating / adding 10 sprinklers Status: Completed | Cosco Fire Protection | $9.2K | |
| applied Dec 30 | #7122814-SB Sign, Awning and Canopy · Trade Two new illuminated channel letter sets Status: Completed | Meyer Sign Company | $25K |
| applied Dec 30 | #7123028-RF Refrigeration · Trade Install walk in cooler and walk in freezer per plans. Status: Completed | Northsound Refrigeration Inc | $32K |
| applied Dec 23 | #7121794-SB Sign, Awning and Canopy · Trade To install the interior illuminated LED sign and lighting in the game room on the 14th floor of the building. Status: Completed | Creo Industrial Arts | $10K |
#7122141-EL Electrical · Electrical replace 17 readers in low voltage system Status: Completed | Not published | $15K | |
| applied Oct 17 | #7112289-EL Electrical · Electrical EXISTING EST3 ADDRESSABLE FIRE ALARM SYSTEM WITH VOICE NOTIFICATION TO REMAIN. THIS IS PHASE 2 OF A 2 PHASE PROJECT. THIS PHASE INCLUDES LEVELS 23 & 25 (SUBMITTED UNDER SEPARATE PERMIT). NEW NOTIFICATION DEVICES PROVIDED TO SUPPORT NEW ROOM LAYOUT.EXISTING POWER SUPPLIES AND SPEAKER AMPLIFIERS TO… Status: Completed | Titan Electric Inc | $10K |
| applied Oct 17 | #7112296-EL Electrical · Electrical EXISTING EST3 ADDRESSABLE FIRE ALARM SYSTEM WITH VOICE NOTIFICATION TO REMAIN. THIS IS PHASE 2 OF A 2 PHASE PROJECT. THIS PHASE INCLUDES LEVELS 23 (SUBMITTED UNDER SEPARATE PERMIT) & 25. NEW NOTIFICATION DEVICES PROVIDED TO SUPPORT NEW ROOM LAYOUT. EXISTING POWER SUPPLIES AND SPEAKER AMPLIFIERS TO… Status: Completed | Titan Electric Inc | $10K |
#7117166-EL Electrical · Electrical Add (4) lights to L17 elevator lobby. Titan Job #2564002 Status: Completed | Titan Electric Inc | $1.5K | |
#7113430-EL Electrical · Electrical Upgrading 9 card readers on Access Control on 40th flr using existing wiring Status: Completed | Not published | $6.7K | |
| applied Mar 19 | #7071479-CN Addition/Alteration · Building Construct interior alterations in existing commercial building for a cafe on the ground floor occupy per plan. Status: Completed | Not published | $550K |
| applied Jun 5 | #7069983-ME Mechanical · Trade HVAC to support interior TI per plan Status: Completed | Not published | $100K |
| applied Oct 1 | #7109439-FS Fire Sprinkler and Suppression · Trade Tenant Improvement for new wall and ceiling layout in new cafe and kitchen area above. Total of 56 heads. Status: Completed | Not published | $19K |
#7109396-EL Electrical · Electrical MER room on 14th floor. Preaction interface for IT move in. 1- spk/str, 2- smoke, 1- siga-rel, 2- siga-ct2, 1-siga-ct1 Status: Completed | Titan Electrical LLC | $2K | |
#7108490-EL Electrical · Electrical installing 2 security cameras and 2 cable runs only Status: Completed | Not published | $2.3K | |
| applied Jul 23 | #7097515-EL Electrical · Electrical Existing EST3 analog addressable fire alarm system with voice evacuation to remain. Remove and reinstall existing smoke detectors and notification devices in existing locations in new ceiling. Status: Completed | Titan Electrical LLC | $6K |
#7106985-EL Electrical · Electrical Sound Masking System for 14th, 22nd and 24th Floor Titan Electric Job number 2543097 Status: Completed | Titan Electric Inc | $86K | |
| applied Aug 7 | #7100464-EL Electrical · Electrical Revision to issued permit 7078765-EL- Added pre action system in the MER room on 14th floor and 3 additional video pods. 22nd floor elevator vestibule moved to other side of elevator. Status: Completed | Titan Electrical LLC | $9K |
| applied Aug 14 | #7101329-ME Mechanical · Trade Provide and install (1) fan coil unit and (1) new fan powered terminal unit to replace existing units. Modification of existing ducting to support replaced units per plans Status: Completed | Not published | $45K |
#7101219-EL Electrical · Electrical 1 Furnish & Install 20 amp Dedicated Circuit- Job#:2501499 Status: Completed | Titan Electric Inc | $1.2K | |
#7100337-EL Electrical · Electrical 2401846-Installed 3 outlets on roof top. Status: Completed | Titan Electric Inc | $18K | |
#7099825-EL Electrical · Electrical Two rooms. Simple installation of low voltage audio visual wire, connected to speakers, video system and wall mounted camera, all contained within one room. New speakers and cameras also installed. Status: Completed | One Diversified | $111K | |
| applied Jun 26 | #7092798-ME Mechanical · Trade Demo (34) VAVs, existing supply duct and GRDs. Provide and install (4) new chilled water FCUs and piping, (1) electric duct heater, (3) inline fans, (51) VAVs with electric heat, new supply duct and GRDs. Status: Completed | Not published | $1M |
| applied Jul 2 | #7094351-BK Tenant Improvment · Building Construct blanket permit tenant improvements to JPMorganChase on the 23rd and 25th floors of existing commercial building per plan. Status: Completed | Not published | $3.1M |
#7098935-EL Electrical · Electrical 2501462 - Zillow 37th & 39th Floor Pwr Add - Tie in (6) quads to existing 120v Power Status: Completed | Titan Electric Inc | $4K | |
#7098244-EL Electrical · Electrical replace Mag lock with identical pre-existing. Status: Completed | Not published | $500 | |
| applied Jun 12 | #7090898-FS Fire Sprinkler and Suppression · Trade LEVEL 14 - MER ROOM, NEW PREACTION SYSTEM LEVEL 22 - OPEN STAIR WATER CURTAIN EXISTING FIRE SPRINKLER PERMIT # 7071983-FS ISSUED 03/27/2025 Status: Completed | Not published | $40K |
| applied May 28 | #7088022-FS Fire Sprinkler and Suppression · Trade RIC BUILDING FIRE PROTECTION TI WORK - PHASE 2 LEVEL 23, LEVEL 25 TI WORK, MODIFY EXISTING TO CONFORM WITH TENANT IMPROVEMENT WORK. Status: Completed | Not published | $95K |
#7095315-EL Electrical · Electrical Access Control and Security Camera Installations - JN 2543028 Status: Completed | Titan Electric Inc | $90.9K | |
#7093053-EL Electrical · Electrical Install low voltage cabling for Floors 14, 22-25 Status: Completed | It Servicepoint | $500K | |
#7092787-EL Electrical · Electrical Demo existing and decomission (1) existing VAV, relocate (1) existing VAV. Install controls for (1) exhaust fan, (1) chilled water FCU, (1) electric duct heater. Titan electric job #2542048 Status: Completed | Titan Electric Inc | $3.9K | |
| applied Apr 18 | #7081093-ME Mechanical · Trade Installation of (1) fan coil unit, (1) duct heater, (1) outside air fan, and associated duct and pipe. Relocation of (1) existing VAV. Status: Completed | Hermanson Company | $70K |
| applied Apr 8 | #7079583-EL Electrical · Electrical Multi floor tenant improvement project of commercial office space. Including installation of new breakers as needed, modification of or installation of new branch circuits, low voltage cabling, receptacles, light fixtures, furniture feeds, and floor boxes. [6/13/2025 BGO - Approved TI Plan Set]… Status: Completed | Titan Electric Inc | $2M |
#7090183-EL Electrical · Electrical Install receptacle on 4th Floor. TItan Job 2511400 Status: Completed | Titan Electric Inc | $850 | |
#7089346-EL Electrical · Electrical 2511390 - 15th Floor Lighting Assist. - Install (1) light switch[Ok to Cancelled permit, no work performed] Status: Closed | Titan Electric Inc | $500 | |
#7088779-EL Electrical · Electrical Providing connection of (20) low voltage devices. - Job#:2501331; [6/5/26 RN Renewal/Reinstatement fee added] Status: Completed | Titan Electric Inc | $26K | |
| applied Apr 2 | #7078765-EL Electrical · Electrical EXISTING EST3 ADDRESSABLE FIRE ALARM SYSTEM WITH VOICE NOTIFICATION TO REMAIN. THIS IS PHASE 1 OF A 2 PHASE PROJECT. THIS PHASE INCLUDES LEVELS 14, 22, AND 24. NEW NOTIFICATION DEVICES AND SMOKE DETECTION TO BE PROVIDED ON LEVEL 14 TO SUPPORT NEW ROOM LAYOUT. EXISTING POWER SUPPLIES AND SPEAKER… Status: Completed | Titan Electric Inc | $70K |
#7086453-EL Electrical · Electrical 2501225 -17th Flr Porter - Adding (1) 75kva Transformer, (1) 200A Feed thru Panel and (10) dedicated 20A circuits Status: Completed | Titan Electric Inc | $50K | |
#7085170-EL Electrical · Electrical 17th floor TI restoration of bathroom. Changing to an all gender with notification devices added into each stall. Status: Completed | Titan Electric Inc | $4K | |
| applied May 5 | #7083980-CY Conveyance · Trade ADDING ENTRANCE ON 17TH FLOOR EQP-SI-07702 / EQP-CY-06566 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Thyssenkrupp Elevator | $68.3K |
| applied May 5 | #7083974-CY Conveyance · Trade ADD ENTRANCE AT 17TH FLOOR EQP-SI-07702 / EQP-CY-06568 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Thyssenkrupp Elevator | $68.3K |
| applied May 5 | #7084011-CY Conveyance · Trade INSTALL ENTRANCE AT 4TH FLOOR EQP-SI-07702 / EQP-CY-06551 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | TK Elevator | $68.3K |
| applied May 5 | #7084003-CY Conveyance · Trade INSTALL ENTRANCE ON 4TH FLOOR EQP-SI-07702 / EQP-CY-06553 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | TK Elevator | $68.3K |
| applied May 5 | #7083995-CY Conveyance · Trade INSTALL ENTRANCE ON 17TH FLOOR EQP-SI-07702 / EQP-CY-06569 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | TK Elevator | $68.3K |
| applied May 5 | #7083990-CY Conveyance · Trade INSTALL ENTRANCE & DD KIOSK ON 17TH FLOOR EQP-SI-07702 / EQP-CY-06567 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Thyssenkrupp Elevator | $71.3K |
#7083498-EL Electrical · Electrical 2501275 - Zillow 36th Flr Conf RM Add - Adding (1) Controlled Quad Outlet[7/16/2025 JBC Added Quad Receptacles, Lights and Circuit for room Scheduler to permit]. Status: Completed | Titan Electric Inc | $3K | |
#7082960-EL Electrical · Electrical Install controls for (103) VAVs, (10) fan coil units, (3) supply fans, (3) exhaust fans, and (3) electric duct heaters. Titan Electric job #2542044 Status: Completed | Titan Electric Inc | $100K | |
| applied Apr 16 | #7079481-ME Mechanical · Trade Install (1) new GRD in new elevator lobby; rebalance existing VAV-17-W19; install (4) new GRD's in new restroom and relocate diffusers as needed to avoid new soffit in the hallway. All work subject to field inspection, STFI. Status: Completed | Not published | $14.2K |
| applied Feb 10 | #7064649-CN Addition/Alteration · Building Construct alterations in commercial building on Level 14 and at convenience stairs on Levels 22-23 occupy per plan. Status: Completed | Not published | $725K |
| applied Mar 27 | #7077710-EL Electrical · Electrical Revision to issued permit 7050407-EL REV2 shows added sprinkler monitoring, AV override, FSD dampers. Status: Completed | Titan Electric Inc | $8K |
#7080219-EL Electrical · Electrical Job#: 2501221 17th Flr Porter - Fiber BB Add 1 Device Status: Completed | Titan Electric Inc | $2K | |
| applied Apr 8 | #7078440-SB Sign, Awning and Canopy · Trade Image Mill is partnering with HSW and Titan Electric to update (2) existing parking garage blade signs. New blade signs will use existing electrical lines. 4/8/25 SS: Corrections noted, email sent to applicant/contractor. Sign details & area based fees added for 1 directional sign shown on… Status: Completed | Image Mill | $30K |
| applied Mar 5 | #7072539-BK Tenant Improvment · Building Construct blanket permit tenant improvements to JP Morgan Chase on floors: 14 22 23 24 and 25 of existing commercial building per plan. Status: Completed | Not published | $11.1M |
#7078081-EL Electrical · Electrical 7th & 10th Floors, install controls on chilled water pumps 2 on each floor Status: Completed | Titan Electric Inc | $8.8K | |
| applied Feb 24 | #7071983-FS Fire Sprinkler and Suppression · Trade RIC BUILDING FIRE PROTECTION TI WORK - PH1 L14, L22, L24 TI WORK, MODIFY EXISTING SYSTEMS FOR TI WORK Status: Completed | Not published | $149K |
#7077780-EL Electrical · Electrical 2501197 - Installing (1) Low voltage device Status: Completed | Titan Electric Inc | $8.3K | |
#7077527-EL Electrical · Electrical Titan Job# 2564002 TI of building including installation of light fixtures, lighting controls, power, fire alarm devices and fire alarm cabling. Status: Completed | Titan Electric Inc | $20.5K | |
#7076446-EL Electrical · Electrical Job #2501172 Adding 1 Fiber building to Floor 33 Status: Completed | Titan Electric Inc | $7K | |
#7076193-EL Electrical · Electrical Job #2501167 - Adding 1 fiber in building to floor 28 Status: Completed | Titan Electric Inc | $3.8K | |
#7075745-EL Electrical · Electrical DAS System Antenna Relocation Status: Completed | Titan Electric Inc | $24K | |
| applied Mar 11 | #7074865-CN Addition/Alteration · Building Tenant improvement to existing office space subject to field inspection STFI. Status: Completed | Not published | $73.5K |
#7072750-EL Electrical · Electrical 160I-24-54086 Lane Powell Seattle - Audiovisual installation of fifteen (15) conference rooms with low voltage cabling, audiovisual. 3/18/2025 Address change from 1420 5th Ave[5/15/2026 JBC Renewed permit until 5/15/2026] Status: Completed | Avi-SPL LLC | $600K | |
#7071829-EL Electrical · Electrical Audio/Video Low voltage, cabling, speakers, Monitors, etc. Status: Completed | Not published | $20K | |
#7071020-EL Electrical · Electrical Job #2501114 - Installing (1) fiber from floor B1 to floor 33 Status: Completed | Titan Electric Inc | $8.5K | |
#7070794-EL Electrical · Electrical Job #2501001 - Installing conduit and wire for booster pumps, installing dent meters with (3) CT's Status: Completed | Titan Electric Inc | $70K | |
#7070456-EL Electrical · Electrical Job #2501100 - Installing 2 quad outlets in nw quadrant Status: Completed | Titan Electric Inc | $1.2K | |
| applied Jan 16 | #7065571-EL Electrical · Electrical THIS IS ADDITIONAL WORK TO APPROVED PERMIT 7038162-EL. JOINT VENTURE BETWEEN TITAN AND CONVERGINT. INSTALLING 3 DUCT DETECTORS FOR FSDs. INSTALLING 12 WP SPEAKER STROBES IN LOCKER ROOM SHOWERS. Status: Completed | Not published | $1.6K |
#7067986-EL Electrical · Electrical 1 Outlet-Job 2461008 Status: Completed | Titan Electric Inc | $700 | |
#7067948-EL Electrical · Electrical Security installation of (38) cameras, (18) intercoms, (6) duress buttons and (8) provided access control enclosures and (89) provided card readers Status: Completed | Cochran Inc | $206K | |
#7067903-EL Electrical · Electrical Install 2 2x2 (Owner Supplied) Fixture Install Status: Completed | Titan Electric Inc | $700 | |
| applied Sep 24 | #7047654-FS Fire Sprinkler and Suppression · Trade T.I. of Floors 41 & 42 of Russell Investment Center Building. New spaces are offices (IBC GROUP 'B') & Assembly areas (IBC Groups 'A-2' & 'A-3') . Floor square footage is: 18,739 S.F. for L41, & 16,089 S.F. for L42. Both floors to receive new 2-hour fire barrier division, thus the following FP… Status: Completed | Cosco Fire Protection | $384K |
#7067298-EL Electrical · Electrical Job #2501045 - Installing (2) floor box outlets Status: Completed | Titan Electric Inc | $5.5K | |
| applied Jun 25 | #7032255-ME Mechanical · Trade Addition of 4 Fan Coil Units, Rezoning of 60 VAV boxes, demo 8 units VAV boxes, and add of 2 VAVs. Re-use of 2 exhaust fans. LV by controls contractor Status: Completed | Hermanson Company | $900K |
#7065901-EL Electrical · Electrical Audio/Video Low Voltage, cabling, speakers, monitors, etc. 1/21/2025 Address change from 1201 3rd Av Status: Completed | Not published | $50K | |
#7065403-EL Electrical · Electrical 2543006 - JPMC - 13th Floor Swing SM Sound Masking install Status: Completed | Titan Electric Inc | $18.8K | |
#7063089-EL Electrical · Electrical Job #2401843 - Installing (2) 480V 50A dryer Receptacles; [1/8/26 RN Renewal/Reinstatement fee added] Status: Completed | Titan Electric Inc | $7.5K | |
| applied Dec 31 | #7062936-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06557 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 31 | #7062930-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 650 lbs New interiors: 862 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06548 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $47.2K |
| applied Dec 31 | #7062931-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 650 lbs New interiors: 862 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06549 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $47.2K |
| applied Dec 31 | #7062932-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 650 lbs New interiors: 862 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06550 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $47.2K |
| applied Dec 31 | #7062933-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06553 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 31 | #7062934-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06552 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 31 | #7062935-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06551 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Oct 10 | #7050407-EL Electrical · Electrical Existing EST 3 Analog addressable fire alarm system with voice evac to remain. A new remote EST3 fire alarm control panel will be added to support added speaker amplifiers and new data card. A graphic annunciator will be installed in the fire command center adjacent to the main FACP to indicate… Status: Completed | Convergint Technologies | $160K |
| applied Dec 18 | #7061596-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06566 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061597-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06565 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061598-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06563 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061599-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06564 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061600-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06562 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061601-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06561 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061602-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06560 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061603-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06559 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061604-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06554 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061605-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06555 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061606-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06556 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061607-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06558 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061595-CY Conveyance · Trade Forms and Surfaces interior to include panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs, rebalance by TKE EQP-SI-07702 / EQP-CY-06567 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Closed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061594-CY Conveyance · Trade Forms and Surfaces interior to include: panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06570 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061593-CY Conveyance · Trade Forms and Surfaces interior to include panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06569 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
| applied Dec 18 | #7061592-CY Conveyance · Trade Forms and Surfaces interior to include panels/reveals/metal base panels/ ss handrails and ss ceiling and LED Perimeter lighting, new carpet flooring. Existing weight: 772 lbs New interiors: 1043 lbs rebalance by TKE EQP-SI-07702 / EQP-CY-06568 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $46.9K |
#7059460-EL Electrical · Electrical Job #2401802 - Relocating (E) switch from column to proposed new door. Reinstall VAV, Install ring and string for room scheduler Status: Completed | Titan Electric Inc | $3.5K | |
#7058799-EL Electrical · Electrical Install (4) wireless coordinators, Install wireless controls for (58) VAVs, install wireless controls for (4) FCUs, install (2) leak detectors, install (2) trane control cabinets, install controls for (2) BTU Meters. Titan Electric job #2442163 Status: Completed | Titan Electric Inc | $58K | |
| applied Aug 20 | #7041915-EL Electrical · Electrical Perkins Coie TI - 2462013 - Tenant Improvement on Floors 31, 34, and 35 containing the following work: Demo/make safe, temp power, temp lighting, branch circuiting, wall power, overhead power and lighting, lighting fixtures, lighting controls, low volt rough in, switchgear, fire alarm, mechanical… Status: Completed | Titan Electric Inc | $2M |
| applied Aug 28 | #7043149-EL Electrical · Electrical Perkins Coie TI - 2462013 - Tenant Improvement on Floors 41, 42 containing the following work: Demo/make safe, temp power, temp lighting, branch circuiting, dedicated circuiting, wall power, overhead power and lighting, lighting fixtures, lighting controls, low volt rough in, switchgear, fire… Status: Completed | Titan Electric Inc | $1.8M |
#7058294-EL Electrical · Electrical Security system installation - JPMC Swing Space Status: Completed | Titan Electric Inc | $20.8K | |
| applied Aug 28 | #7043148-EL Electrical · Electrical Perkins Coie TI - 2462013 - Tenant Improvement on Floors 32 and 33 containing the following work: Demo/make safe, temp power, temp lighting, branch circuiting, dedicated circuiting, wall power, overhead power and lighting, lighting fixtures, lighting controls, low volt rough in, switchgear, fire… Status: Completed | Titan Electric Inc | $1.4M |
| applied Nov 21 | #7057709-CN Addition/Alteration · Building Construct tenant improvement to office space subject to field inspection STFI. Status: Completed | Not published | $51.8K |
#7057885-EL Electrical · Electrical Replacing 3 IP cameras Replacing door locking mechanisms Status: Completed | Not published | $500 | |
#7057658-EL Electrical · Electrical 13th Floor JPMC Swing Space. Furniture Power and Feeders. Status: Completed | Titan Electric Inc | $25K | |
| applied Sep 23 | #7047475-EL Electrical · Electrical Tenant improvement on levels 26-28. New notification devices throughout. One new power supply to be installed to serve TI area on level 27. New speaker/strobes and strobes to be installed. Smoke detection added in tenant space on levels 27 & 28. No changes are to be made to sequence of operations.… Status: Completed | Titan Electric Inc | $27K |