Commercial General Building, Demolition, Electrical, Fire Protection, Hvac/Mechanical work permitted November 12, 2024, with 18 permits through June 10, 2026, declaring $156,470,020 of work. Contractor on record: Valley Electric Co. Of Mount Vernon Inc.
Demolish existing institutional building (Rainier Beach High School) per plan.
Seattle permit records name Valley Electric Co. Of Mount Vernon Inc, Security Solutions NW and Patriot Fire Protection as the contractors on this project, among 11 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
18 permits issued Nov 12 – Jun 10, newest first.
Commercial and multifamily, biggest first.
| Issued |
|---|
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7147370-EL Electrical · Electrical Additional clock and Intercom to Phase 4 PAC Building Sound Systems Status: Completed | Dimensional Communications Inc. | — | |
#7147371-EL Electrical · Electrical Adding additional data locations and door access locations. Status: Issued | EZ Interface | — | |
#7136830-EL Electrical · Electrical Install LED sports field lighting system to Rainier Beach Soccer. Light fixtures on poles only, all other electrical work done by others. Status: Completed | Lightworks Electric Company | — | |
#7132747-EL Electrical · Electrical Class 2 LV Mechanical Controls: -(41) VAV's with factory mounted controls. -(25) Fin Tube Radiators wired to the associated VAV Box. -(15) Radiant Panels with enable to the associated VAV Box. -(3) Unit Heaters with Enable, Status, and Zone Sensor. -(3) WAHP's with field mounted controls. -(7)… Status: Completed | Static Energy, Inc | — | |
#7130457-EL Electrical · Electrical Install head end equipment and trim field device in Concessions Stand for the access control system. Status: Completed | Security Solutions NW | — | |
| applied Oct 24 | #7113384-FS Fire Sprinkler and Suppression · Trade Design and install new sprinklers and piping fed from existing systems in 'phase 4' of new construction. Status: Completed | Patriot Fire Protection | $263K |
| applied Jul 16 | #7096475-CN Addition/Alteration · Building Install card readers and electric locks on non-egress sides of doors in institutional building (Rainier beach HS) subject to field inspection (STFI) Status: Issued | Not published | $64K |
| applied Jul 14 | #7096044-EL Electrical · Electrical Replace like in kind Batteries in a single UPS Cabinet. This is a maintenance battery replacement. All existing wiring and Load will remain the same. No modifications or alterations to the existing system. Only removal of old batteries and replace new batteries. Total 40 batteries (PWHR12280). We… Status: Completed | Enersys Delaware Inc | $1.5K |
#7096923-EL Electrical · Electrical install 1 24 Strand SM Fiber from MDF to IDF-1A Status: Completed | Cochran, Inc. | $8K | |
| applied Jun 17 | #7091555-EL Electrical · Electrical Valley Job# 19164 - Temp Power for the Rainier Beach High School Phase 4 work. Includes (2) 100A feeds, and (2) 50A pig tails from existing infrastructure installed during Phase 3. Feeds/pig tails to be removed once temp power is no longer required for Phase 4 work. [6/26/25 KEF - Plan set… Status: Completed | Valley Electric Co. Of Mount Vernon Inc | $20K |
| applied Mar 28 | #7069469-DM Demolition · Demolition Demolish/remove existing east portable classroom for institutional campus (Rainier Beach High School) per plan. Status: Completed | Not published | $100K |
#7081007-EL Electrical · Electrical Terminate wires in panel for new burg system Status: Completed | Security Solutions NW | $5K | |
| applied Jan 2 | #6822319-DM Demolition · Demolition Demolish existing institutional building (Rainier Beach High School) per plan. Status: Completed | Not published | $155M |
| applied Jan 30 | #7067906-FS Fire Sprinkler and Suppression · Trade REVISION TO ISSUED PERMIT #7028473-FS. INSTALL AUX DRY SYSTEM AT LOADING DOCK AT NEW RAINIER BEACH HIGH SCHOOL. THIS INCLUDES NEW DRY PIPE VALVE, AIR COMPRESSOR,PIPING, AND (4) SPRINKLER HEADS. Status: Completed | Patriot Fire Protection | $7.5K |
#7072367-EL Electrical · Electrical Install of AES Radio System. Permit required for monitoring of fire alarm system VE Job #19164 Status: Completed | Valley Electric Co. Of Mount Vernon Inc | $1K | |
| applied Oct 11 | #6990740-EL Electrical · Electrical Installing fire alarm system, Security Solutions NW is parts and smarts, Joint venture with Valley Electric who is doing the install Status: Completed | Valley Electric | $180K |
#7067545-EL Electrical · Electrical Installation of new CCTV cameras, and swapping out existing access control systems. VE Job # 40003 Status: Issued | Valley Electric Co. Of Mount Vernon Inc | $500K | |
| applied Nov 12 | #7055606-RF Refrigeration · Trade Rainier Beach High School Replacement Ductless Split-System Heat Pump unit Status: Completed | Apollo Mechanical Contractors | $320K |