Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted December 24, 2024, with 18 permits through August 6, 2026, declaring $26,014,427 of work. Contractor on record: Trademark Plumbing.
Construct new mixed use building occupy per plan. Mechanical Included.
Seattle permit records name Trademark Plumbing, Schindler Elevator Corporation and United Systems Mechanical, LLC as the contractors on this project, among 8 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
18 permits issued Dec 24 – Aug 6, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Aug 6 | #7156555-SB Sign, Awning and Canopy · Trade install one LED illuminated projecting sign and one non-illuminated projecting sign to exterior of building (Trace). 9/1/26 SS: Revised plans received from contractor. Revised permit fees added. Status: Completed | Western Neon | $13.1K |
| applied Jul 24 | #7154544-EL Electrical · Electrical Installation of (3) Tesla Level 2 charger on Existing EV infrastructure. Conduit, wire, Panel, and Connected Load approved on Initial building construction Permit. Permit number and detail are outlined in Plan set. [8/5/26 KEF - Plan set approved.] Status: Completed | Not published | $9.4K |
| applied May 13 | #7142505-CY Conveyance · Trade Temp Use - Car 1 7109306-CY (original Conveyance Permit) 60-day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two-way communication with operator at all times. Status: Completed | Schindler Elevator | $197K |
| applied Feb 20 | #7129745-RF Refrigeration · Trade Install refrigeration pipe for 6 split system heat pumps Status: Completed | United Systems Mechanical, LLC | $12K |
#7114740-BP Boiler/Pressure Vessel · Trade 8 Story Apartment Building Status: Completed | Trademark Plumbing | $2.8M | |
#7114742-BP Boiler/Pressure Vessel · Trade 8 Story Apartment Building Status: Completed | Trademark Plumbing | $2.8M | |
#7114743-BP Boiler/Pressure Vessel · Trade 8 Story Apartment Building Status: Completed | Trademark Plumbing | $2.8M | |
#7114737-BP Boiler/Pressure Vessel · Trade 8 Story Apartment Building Status: Completed | Trademark Plumbing | $2.8M | |
#7114739-BP Boiler/Pressure Vessel · Trade 8 Story Apartment Building Status: Completed | Trademark Plumbing | $2.8M | |
| applied Oct 24 | #7109307-CY Conveyance · Trade install a traction elevator Car 2 6835622-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Schindler Elevator Corporation | $191K |
| applied Oct 24 | #7109306-CY Conveyance · Trade Install a traction elevator #1 6835622-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Schindler Elevator Corporation | $191K |
#7110499-EL Electrical · Electrical Install controls and conductors for (2) RTU's, (3) ERV's, (6) Split system heat pumps and Garage Exhaust fan system. Status: Completed | United Systems Mechanical, LLC | $16K | |
| applied Jun 13 | #7091236-FS Fire Sprinkler and Suppression · Trade INSTALL A COMBINATION SPRINKLER / STANDPIPE SYSTEM TO PROTECT THE ENTIRE BUILDING. A CLASS 1 MANUAL WET STANDPIPE WILL BE INSTALLED IN THE EXIT STAIRWELLS. Status: Completed | Smith Fire Systems | $339K |
#7106738-EL Electrical · Electrical TELECOM/LOW VOLT Status: Completed | Not published | $341K | |
| applied Apr 18 | #7081577-EL Electrical · Electrical NEW INSTALL FIRE ALARM SYSTEM [C.Kenefick 5/20/2026 - permit extended one year.] Status: Completed | Linx Integrated | $98K |
| applied Jan 23 | #7066670-EL Electrical · Electrical 800a 480v underground service [02?19/25 BGO - Approved Temp Service Plan Set with Comments] 2/23/26 PWR Permit extended, ongoing project. Status: Completed | Humble Electric LLC | $4K |
| applied Jun 14 | #6835622-CN New · Building Construct new mixed use building occupy per plan. Mechanical Included. Status: Completed | KJ Holmes | $19M |
| applied Nov 12 | #7055506-EL Electrical · Electrical Multi family building with parking garage below [ 2-24-26 BZ Revision Approved ] [9-22-26 D Rankin - Rev #2, Add washer/dryer to 71 units] Status: Completed | Humble Electric LLC | $3M |
In Seattle, biggest first.