Commercial Electrical, Elevator work permitted December 17, 2024, with 6 permits through December 4, 2025, declaring $110,987 of work. Contractor on record: TK Elevator.
Seattle permit records name TK Elevator, Tke and Sequoyah Electric LLC as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Dec 17 – Dec 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 4 | #7119665-CY Conveyance · Trade |
Commercial and multifamily, biggest first.
Replace existing hall stations with new hall stations - I Hall Fixture 1402796 US1524281 Conv 8416 RO 4980398 EQP-SI-04362 / EQP-CY-06238 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Status: Issued
| TK Elevator |
| $30.8K |
| applied Jun 9 | #7089945-CY Conveyance · Trade Install a new car operating station-1331403 Car "1" CONV: 8416 US:1524281 RO:4744825 EQP-SI-04362 / EQP-CY-06238 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $25.7K |
#7073766-EL Electrical · Electrical SEQ# 7315287. ADD (1) 20A CIRCUIT FOR DAMPNER Status: Completed | Sequoyah Electric LLC | $800 |
#7071684-EL Electrical · Electrical Access control and closed intercom Status: Closed | BKS Security | $50K |
#7070533-EL Electrical · Electrical Add outlets and data boxes in the lobby area, 8 total Status: Completed | Beach Electric LLC | $3K |
#7061465-EL Electrical · Electrical Installation of AES radio to existing FACP. UPDATE (01/24/25): Address changed from 619 32nd Ave. Status: Completed | Guardian Security Systems Inc | $750 |