Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted December 20, 2024, with 23 permits through May 20, 2026, declaring $14,378,073 of work. Contractor on record: Firepower Incorporated.
This is mechanical design drawings for existing building permit 6752870-CN per plans
Seattle permit records name Firepower Incorporated, Trademark Plumbing and Merit Electric of Spokane as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
23 permits issued Dec 20 – May 20, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7144187-EL Electrical · Electrical Adding a 30A safety switch for a material lift. Status: Completed | Merit Electric of Spokane | — | |
| applied Feb 6 | #7062576-CN Addition/Alteration · Building Construct to decommission telecommunications facility on tower (Nokia) and alterations in existing commercial building (AT&T) per plan. Status: Completed | Not published | $30K |
#7127184-EL Electrical · Electrical Status: Completed | Firepower Incorporated | — | |
#7118009-EL Electrical · Electrical Adding the following: (1) - Electric Wall Heater (2) - Split System AC Status: Completed | Merit Electric of Spokane | $5K | |
| applied Nov 5 | #7111007-CY Conveyance · Trade Material lift install 6752870-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Pacific Construction Milton Inc | $106K |
#7112004-EL Electrical · Electrical Installation of AES Radio to monitor FACP Status: Completed | Guardian Security Systems Inc | $750 | |
#7109419-BP Boiler/Pressure Vessel · Trade 6 story DESC project Status: Completed | Trademark Plumbing | $2.7M | |
#7109418-BP Boiler/Pressure Vessel · Trade 6 story DESC project Status: Completed | Trademark Plumbing | $2.7M | |
#7109423-BP Boiler/Pressure Vessel · Trade 6 story DESC project Status: Completed | Trademark Plumbing | $2.7M | |
#7109426-BP Boiler/Pressure Vessel · Trade 6 story DESC project Status: Completed | Trademark Plumbing | $2.7M | |
#7090730-EL Electrical · Electrical Wire thermostat and junctions to run power between heat trace locations. Power to be left for on-site electrician and will be under a separate permit. Status: Completed | Not published | $750 | |
| applied May 7 | #7084485-CY Conveyance · Trade New installation of traction elevator Car 2 6752870-CN (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | TK Elevator | $260K |
| applied May 7 | #7084483-CY Conveyance · Trade New installation of traction elevator Car 1 6752870-CN (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | TK Elevator | $260K |
| applied Dec 16 | #7061219-FS Fire Sprinkler and Suppression · Trade RHFP will install (1) New Electric Vertical Inline Fire Pump, (1) New Class 1 Manual Wet Combination Standpipe System, (5) New Wet Pipe Sprinkler Systems, and (1) Dry Pipe sprinkler System in the new construction 6-story Multifamily Building, with a total of 632 Sprinklers. Status: Completed | Red Hawk Fire Protection | $299K |
| applied Apr 18 | #7081287-RF Refrigeration · Trade Install refrigerant pipe for (2) VRF systems with (2) BC's and (15) fan coils and refrigerant pipe for (3) Split systems. Status: Completed | United Systems Mechanical, LLC | $30K |
#7081276-EL Electrical · Electrical Installation of low voltage cabling and controls for complete HVAC system. Status: Completed | United Systems Mechanical, LLC | $30K | |
#7081228-EL Electrical · Electrical Install control wiring in 90 apartment units t-stat Status: Completed | Not published | $10K | |
#7078603-EL Electrical · Electrical Installing a DAS system throughout building Status: Completed | Firepower Incorporated | $33K | |
#7071989-EL Electrical · Electrical Installing Data, CCTV, Access Control, Intercom and ARA Status: Completed | Firepower Incorporated | $545K | |
| applied Apr 29 | #6997193-ME Mechanical · Trade This is mechanical design drawings for existing building permit 6752870-CN per plans Status: Completed | Not published | $8M |
| applied Dec 31 | #7062920-EL Electrical · Electrical New 600A, 120/208 3PH meter stack, with (5) 200A & (1) 100A meters. Currently a temp service moving to permanent. [1/3/25 KEF - Plan set approved. Two service inspections required. One for the temporary service and a second for the cutover to the permanent service.] [1/5/26 BGO - Permit extended… Status: Completed | Titan Electric Inc | $42K |
| applied Dec 3 | #7058826-EL Electrical · Electrical Installing Fire Alarm and ARA systems Status: Completed | Firepower Incorporated | $88.9K |
| applied Oct 9 | #7050040-EL Electrical · Electrical Mixed Use Building. 6 Story, 95 Units. Status: Completed | Merit Electric of Spokane | $2.3M |
In Seattle, biggest first.