Commercial General Building, Electrical, Fire Protection work permitted February 19, 2025, with 21 permits through August 12, 2026, declaring $14,787,663 of work. Contractor on record: Veca Electric & Technologies, LLC.
Construct alterations for OR expansion at existing institution (Harborview Medical Center) and occupy per plan. Mechanical included with this permit
Seattle permit records name Veca Electric & Technologies, LLC, Red Hawk Fire Protection and MTS Services LLC as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
21 permits issued Feb 19 – Aug 12, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7157837-EL Electrical · Electrical Install modular furniture (power wiring by others). **Address changed per Zendesk request, EC, 8/13/26** Status: Completed | SES, Inc | — |
#7155393-EL Electrical · Electrical Install (10 heat trace circuit. Wiring from panel breaker to controller location by others. Job# 836935[10/16/26 cb-Changed address from 325 9th to 908 Jefferson] Status: Completed | EC Electric | — |
#7154986-EL Electrical · Electrical 830875 - HBP Co-Location - Relocation of power and lighting for new framed hallways and demoed offices. Disconnect and reconnect of powered furniture. (4) added exit signs for new hallways, no other added lighting. Status: Completed | Veca Electric & Technologies, LLC | — |
#7154692-EL Electrical · Electrical 719012 AV Conference Rooms - 1308, 1360, 1362, 1363,1664. LV cabling and installation for ceiling speakers and mics for video conferencing systems Status: Completed | Veca Electric & Technologies, LLC | — |
#7153432-EL Electrical · Electrical 719011 - LV horizontal cabling adds Status: Completed | Veca Electric & Technologies, LLC | — |
| applied Jun 22 | #7149353-CN Addition/Alteration · Building Construct tenant improvements for medical office at level 13 of existing hospital (Harborview 9th & Jefferson) subject to field inspection (STFI) Status: Completed | Not published | $214K |
#7148243-EL Electrical · Electrical Adding the LOW VOLT BAS interface for the new Chiller. Status: Issued | MTS Services LLC | — |
#7140138-EL Electrical · Electrical Installation of 2x 70a feeders for MRI cooling. Modification of existing 150a circuit for new MRI power unit, and replacement of 12 lighting fixtures. Status: Completed | McKinstry Co LLC | — |
#7136033-EL Electrical · Electrical Replace existing transformer with new like & kind 112.5kVA transformer and repull feeder.[9/10/2026 JBC Changed Address to 908 Jefferson St ] Status: Completed | Veca Electric & Technologies, LLC | — |
#7118732-EL Electrical · Electrical AV installation of a projector, LV wire and devices. Status: Issued | One Diversified | $14.3K |
| applied Aug 29 | #7104321-EL Electrical · Electrical REVISION TO ISSUED PERMIT 7082238-EL. Add 4 sprinkler waterflow switches monitored by fire alarm system. Joined venture with Veca Electric. Tenant improvement on Level 4 OR. New devices tie to existing system. Status: Completed | Red Hawk Fire Protection | $1.6K |
| applied Jul 24 | #7098113-CN Addition/Alteration · Building Install patient lift at level 6 of existing hospital (Harborview 9th & Jefferson) subject to field inspection (STFI) Status: Completed | Not published | $10K |
#7097543-EL Electrical · Electrical 25D5E20495 - HMC OR Expansion - access control Status: Completed | Pavion Corp. | $55K |
#7092966-EL Electrical · Electrical Install 2 Cat6A to 1 location from UW IDF to new CT scanner room Status: Completed | Cochran, Inc. | $3.5K |
| applied Apr 23 | #7082238-EL Electrical · Electrical Joined venture with Veca Electric. Tenant improvement on Level 4 OR. New devices tie to existing system. Status: Completed | Red Hawk Fire Protection | $24K |
| applied Apr 14 | #7080444-FS Fire Sprinkler and Suppression · Trade PERMIT REVISIONS TO 7068444-FS. FIRE SPRINKLER SEPARATED BY SMOKE COMPARTMENTS PER BUILDING PERMIT REVIEW COMMENTS Status: Completed | Red Hawk Fire Protection | $132K |
| applied Feb 13 | #7070034-EL Electrical · Electrical 830130 HMC-OR Renovation of the 4th floor for construction of 5 operating rooms and support areas [ 7-25-25 BZ Revision Approved ] [ 9-9-25 BZ Revision #2 Approved ] Status: Completed | Veca Electric & Technologies, LLC | $2.1M |
#7084536-EL Electrical · Electrical 718008 Pull New Cat 6 and Cat6A cable, Nurse call cabling and Access Control to existing IDF. POC Van Stenburg (206) 743-7115 cb-7/23/25 changed address from 325 9th Ave. to 908 Jefferson Status: Completed | Veca Electric & Technologies, LLC | $150K |
#7079482-EL Electrical · Electrical Installation of LOW VOLTAGE HVAC Controls Status: Completed | MTS Services LLC | $39.8K |
| applied Jul 24 | #7023078-CN Addition/Alteration · Building Construct alterations for OR expansion at existing institution (Harborview Medical Center) and occupy per plan. Mechanical included with this permit Status: Completed | Not published | $12M |
#7071271-EL Electrical · Electrical Install power for new CT Scanner. Relocate lights and plugs as needed for new layout. [7/28/2025 BGO - Approved Plan Set with Comments] Status: Completed | Not published | $55K |