Commercial General Building, Electrical, Elevator, Fire Protection, Roofing work permitted November 7, 2024, with 18 permits through July 7, 2026, declaring $1,379,114 of work. Contractor on record: Cochran Inc.
Amazon 1.0 MOD - SEA21 #1 - Modernization: New: Controller, Machine, Fixtures, COP, Door Operator, Governor. EQP-SI-08250 / EQP-CY-07309 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1)
Seattle permit records name Cochran Inc, McKinstry Co LLC and Columbia Fire as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
18 permits issued Nov 7 – Jul 7, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7151545-EL Electrical · Electrical Adding (2) 4' LED strip light fixtures. SEQ#306458 Status: Completed | Not published | — | |
#7142274-EL Electrical · Electrical Install (2) dedicated 15-amp circuits for new Vapor Fireplace Install (1) dedicated 3-pole 40-amp circuit into panel (V1H2) for new electric hot water heater Status: Issued | McKinstry Co LLC | — | |
#7137843-EL Electrical · Electrical 530013-provide and install (6) exterior lighting fixtures at SEA21 Path to Yes. Site contact: Ken Little: Klittle@Cochraninc.com Cell: 206-586-2051 Status: Issued | Cochran Inc | — | |
#7136454-FS Fire Sprinkler and Suppression · Trade Modify the existing fire sprinkler system to accommodate the new vestibule. Status: Issued | Columbia Fire | $3.7K | |
#7130669-EL Electrical · Electrical Install (3) 120V single point power connections for auto doors. Low voltage rough-in for security at each door. SEQ #306437 Status: Completed | Sequoyah Electric LLC | — | |
#7127969-EL Electrical · Electrical Status: Completed | Not published | — | |
| applied Jan 21 | #7125761-CY Conveyance · Trade New rubber flooring . Weight out 96.5 LBS, weight in 101 LBS EQP-SI-08250 / EQP-CY-07309 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $12.3K |
#7117584-RR Roof · Roof Performing PVC single-ply roofing overlay on the existing BUR following manufacturer and code requirements for an adhered assembly using fleece-back membrane. Status: Issued | James King Roofing, LLC | $203K | |
#7115418-EL Electrical · Electrical Joint venture between Convergint and Cochran Electric. Adding two relays for turnstiles on LVL1. [4-6-26 D Rankin - reopened permit, Fire has to re-Test for final] Status: Completed | Not published | $200 | |
| applied Jun 4 | #7084885-CN Addition/Alteration · Building Tenant improvement for new security gates at freight elevators Levels P2 P3 & PA of existing commercial building per plan Status: Completed | Not published | $200K |
| applied Jul 22 | #7096904-EL Electrical · Electrical 527676-SEA21 Lighting Control Update-Cochran to Provide and install updated lighting control devices to existing fixtures: [7/28/25 BGO - Lighting Controls Only Plan Review Waived] Level 1 :Following device install and programming QS-A-CMP-S-0 (1) QP3-1PL-100-240 (1) QSN-1ECO-S (1) … Status: Completed | Cochran Inc | $185K |
#7097310-EL Electrical · Electrical 426 Terry Ave Otis FA-Cochran to remove the new heat detector to re-pipe and extend the location to the top of the elevator. Cochran to re-install new heat detector with new wiring. Site Contact: Cody Schlosser Email: cschlosser@cochraninc.com Cell: 206.561.5807 Status: Closed | Cochran Inc | $810 | |
#7092863-EL Electrical · Electrical Description of Work: Performance of all electrical maintenance work to include but not limited to: Lighting, motors, controls, breaker replacement and electrical device replacement. This work will be logged and then inspected on a yearly basis Status: Completed | Not published | $5K | |
#7084635-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATION Status: Completed | 16d LLC | $14.4K | |
| applied Apr 24 | #7082305-CY Conveyance · Trade Amazon 1.0 MOD - SEA21 #1 - Modernization: New: Controller, Machine, Fixtures, COP, Door Operator, Governor. EQP-SI-08250 / EQP-CY-07309 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Otis Elevator Company | $524K |
#7063135-EL Electrical · Electrical 526078 Pathway for (2) bypass doors,01.403B with (2) card readers, 01.515E with (2) card readers. Provide pathway for (3) turnstiles (X-ray and Core as needed). Fire Alarm as required by AHJ. Provide (1) circuit for Trove 3(assumed with 300'). Site Contact: Cody Schlosser 206-561-5807… Status: Completed | Cochran Inc | $25.6K | |
#7059603-EL Electrical · Electrical JOB # 526077 - SEA21 - ELECTRICAL - TURNSTILE UPGRADE. **Renewed 11/5/25, EC** Status: Completed | Not published | $203K | |
#7055167-EL Electrical · Electrical Relocate (1) existing fire alarm device on L01. This is a joint venture with Convergint Technologies, Job #7010523 Contact: Shawn Boulger 425-457-2224 Status: Completed | Prime Electric | $1.5K |