Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 11, 2024, with 31 permits through August 24, 2026, declaring $1,254,643 of work. Contractor on record: Prime Electric.
Brazil Phase 3 Rebuild Main Electrical Room - Job 1026644: Rebuild of Main Electrical Room following fire. There is no new load added for this project. All new equipment and panels are replacing the same items that were lost in the fire. All new panels, transformers, switches, and transfer switches are rated the same as original equipment lost in the fire. [6/10/2026 BGO - Approved Plan Set for Electrical Room Re-Build]
Seattle permit records name Prime Electric, Cochran Inc and Cosco Fire Protection as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
31 permits issued Nov 11 – Aug 24, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#7159595-EL Electrical · Electrical We are installing (2) speakers for the 12th floor for a TI. Status: Issued | Not published | — | |
#7158913-FS Fire Sprinkler and Suppression · Trade relocate 20 QR upright sprinklers for the removal of 12" of insulation at the deck Status: Completed | Cosco Fire Protection | $14.8K | |
| applied Aug 11 | #7157706-CN Addition/Alteration · Building Construct tenant improvement to portion of L - 12 office space in a commercial building per subject to field inspection STFI. Status: Issued | Not published | $45K |
#7157167-EL Electrical · Electrical Replace all damaged security transformers, batteries and install kill switches in all of Amazon SEA53's IDF rooms. [C.Kenefick 9/17/2026 - fees adjusted to reflect 17 branch circuits up to 30a. Prior payment for 17 low voltage devices applied to new balance.] Status: Completed | Cochran Inc | — | |
#7154130-EL Electrical · Electrical Install a total of (30) VSS devices at Amazon SEA53. Status: Completed | Cochran Inc | — | |
#7148218-EL Electrical · Electrical We are installing (1) speaker strobe on the 12th floor, office 1A as a joint venture with Prime Electric. [C.Kenefick 10/22/2026 - Two speaker/strobes installed. Fees OK.] Status: Issued | Not published | — | |
| applied Jun 3 | #7145857-EL Electrical · Electrical Brazil Phase 3 Rebuild Main Electrical Room - Job 1026644: Rebuild of Main Electrical Room following fire. There is no new load added for this project. All new equipment and panels are replacing the same items that were lost in the fire. All new panels, transformers, switches, and transfer… Status: Issued | Prime Electric | $345K |
| applied May 11 | #7141173-ME Mechanical · Trade Demo (2) transfer fans and associated fire/smoke dampers. Install (2) new transfer fans and associated fire/smoke dampers. Status: Completed | Macdonald Miller Facility Solutions LLC | $10.8K |
#7144330-EL Electrical · Electrical Performance of all electrical maintenance work, including but not limited to lighting, motors, controls, breaker replacement, and electrical device replacements. This work will be logged and then inspected on a semi-annual basis. Status: Issued | Cbre | — | |
#7140436-EL Electrical · Electrical CBRE SEA53 EM PHASE 2 4000A Gear Install - Job 1026277: THIS PROJECT WILL PROVIDE TEMPORARY NORMAL POWER TO THE BUILDING THAT HAD A FAULT INCIDENT IN THE MAIN ELECTRICAL ROOM TO ALLOW FOR THE RE-OCUPATION OF THE BUILDING. TEMPORARY POWER IS INTENDED TO LAST FOR THE DURATION OF THE CONSTRUCTION OF… Status: Completed | Prime Electric | $250K | |
| applied Apr 24 | #7139932-CN Addition/Alteration · Building Construct Tenant Improvement Project at 400 9th Ave N. Installing full height demountable partition walls subject to field inspection STFI. Revision to include two more office spaces 7/17/206 Status: Issued | Not published | $16K |
| applied Apr 17 | #7139014-CN Addition/Alteration · Building Construct fire damage repairs at level A of commercial building subject to field inspection (STFI) Status: Issued | Not published | $75K |
| applied Apr 13 | #7137878-EL Electrical · Electrical FURNISH AND INSTALL (2) 1200AMP EMERGENCY SERVICES TO FEED LIFE SAFETY EQUIPMENT WHILE PRIMARY SERVICE IS BEING REPLACED. [4/20/26 BGO - Approved Temporary Service Plan with Comments] Status: Issued | Prime Electric | $250K |
#7136842-EL Electrical · Electrical MASSIVE FAULT w/EXPLOSION & FIRE Status: Issued | Prime Electric | — | |
| applied Feb 9 | #7128400-EL Electrical · Electrical BRAZIL EV Expansion - Job 4006350: Electrical work to add 20 dual head EV Chargers. Site contact: Jake Benz (425) 864-1035 [2/17/26 KEF - Plan set approved.] [9/29/26 KEF - Revised plan set approved. Revised plans supersede prior stamped set.] Status: Completed | Prime Electric | $115K |
#7126043-EL Electrical · Electrical Status: Completed | Prime Electric | — | |
#7123672-EL Electrical · Electrical Status: Issued | Pacific Power Group | — | |
#7121568-EL Electrical · Electrical We are installing (1) speaker as a joint venture with Prime Electric. Status: Completed | Prime Electric | $8.3K | |
#7119771-FS Fire Sprinkler and Suppression · Trade Add 1 new sprinkler pendent on the 6th floor to protect tenant improvements to wall addition. Status: Completed | Not published | $2.4K | |
| applied Dec 1 | #7118897-CN Addition/Alteration · Building Tenant Improvement to east portion of level 6 (Amazon - Brazil bldg.) subject to field inspection. Status: Issued | Not published | $9K |
#7117535-EL Electrical · Electrical Install contactor controlled by ansul for kitchen appliances. [1/16/2026 PGF Changed address from 401 9th Ave N. to 400 9th Ave N.] Status: Completed | Staudt Electric | $3K | |
| applied Jul 7 | #7094194-FS Fire Sprinkler and Suppression · Trade Adding protection for new phone booths over multiple floors Status: Completed | Not published | $14K |
| applied Jul 22 | #7097371-EL Electrical · Electrical This is a joint venture with Prime Electric. We will be installing (15) speaker/strobes. Status: Completed | Not published | $16.7K |
#7086566-EL Electrical · Electrical Performance of all electrical maintenance work, including but not limited to lighting, motors, controls, breaker replacement, and electrical device replacements. This work will be logged and then inspected on a semi-annual basis. Status: Completed | Not published | $5K | |
| applied May 13 | #7085736-CN Addition/Alteration · Building Install pre-manufactured booths in existing office on floors 3 and 5-12 of existing office building subject to field inspection. Status: Completed | Not published | $300K |
| applied May 1 | #7083517-CN Addition/Alteration · Building Tenant Improvement to install shelving in an existing office building (level 7) subject to field inspection. Status: Completed | Not published | $45K |
| applied Apr 14 | #7080694-CN Addition/Alteration · Building STFI Tenant Improvement at 400 9th Ave N. Installation of demountable full height partitions and ceiling track subject to field inspection STFI. Status: Completed | Not published | $15K |
#7076229-EL Electrical · Electrical Job 4005496: Adding (1) quad. Contact: Shawn Boulger 425-457-2224 Status: Completed | Prime Electric | $500 | |
#7074926-EL Electrical · Electrical Job 4005431: Adding (1) L6-30A receptacle. Contact: Shawn Boulger 425-457-2224 Status: Completed | Prime Electric | $1.5K | |
#7063565-EL Electrical · Electrical Job 7011234: Adding (1) 50 amp breaker. Contact: Shawn Boulger 425-457-2224 1/9/26 AB: Renewal Status: Issued | Prime Electric | $2K | |
#7055770-EL Electrical · Electrical 525045-SEA53 Lobby Turnstiles-Cochran to install 1ea circuit to bypass door header. Site contact: Cody Schlosser Email: cschlosser@Cochraninc.com Cell: 206.561.5807 Status: Completed | Cochran Inc | $5.8K |