Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 11, 2024, with 31 permits through October 21, 2026, declaring $11,479,471 of work. Contractor on record: Sequoyah Electric LLC.
Construct blanket permit tenant improvements to Apollo on floors: 10 11 and 12 of existing commercial building per plan.
Seattle permit records name Sequoyah Electric LLC, Cochran Inc and Prime Electric as the contractors on this project, among 11 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
31 permits issued Nov 11 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Sep 24 | #7163568-ME Mechanical · Trade Provide and install (1) new Water Source Heat Pump. Provide and install new duct, diffusers, and hydronic piping. Re-balance existing FTUs. Status: Issued | Not published | $30K |
#7164337-EL Electrical · Electrical Adding (6) 120V/20A circuits. Adding (1) 480V/20A circuit for new heat pump. SEQ#306610 Status: Issued | Not published | — | |
#7164427-EL Electrical · Electrical 325 9th Ave N - Job 1027962: Alter (1) circuit to add (1) receptacle. Status: Issued | Prime Electric | — | |
#7162209-EL Electrical · Electrical Load bank testing of emergency back up generator - 130121 Status: Issued | Pacific Power Group | — | |
#7162051-EL Electrical · Electrical 531296: Install (1) Z4 door package and (3) EEO door packages at Amazon SEA54.03.403. Status: Completed | Not published | — | |
#7144329-EL Electrical · Electrical Performance of all electrical maintenance work, including but not limited to lighting, motors, controls, breaker replacement, and electrical device replacements. This work will be logged and then inspected on a semi-annual basis. Status: Issued | Cbre | — | |
| applied Mar 19 | #7134280-CN Addition/Alteration · Building Construct tenant improvement for office spaces at levels 11 - 12 of existing commercial building subject to field inspection (STFI) Status: Inspections Completed | Not published | $5K |
#7134027-EL Electrical · Electrical Relocate 4 receptacles, pathway for data - SEQ #101216 Status: Completed | Sequoyah Electric LLC | — | |
#7131926-EL Electrical · Electrical 529372_SEA54 Power Supply-Replace Disconnect and reconnect (5) new power supplies. Site contact: Ken Little Email: klittle@cochraninc.com Cell: 206582051 Status: Issued | Cochran Inc | — | |
#7124583-EL Electrical · Electrical Status: Completed | ANZAC Electric | — | |
| applied Sep 24 | #7108450-FS Fire Sprinkler and Suppression · Trade Cosco Fire Protection to add/relocate sprinkler heads to accommodate new walls and ceiling office layout for Levels 10-12 per NFPA 13, 2019. Status: Completed | Cosco Fire Protection | $176K |
| applied Oct 16 | #7111689-EL Electrical · Electrical 3 floor TI. 10th Floor relocation of 53 speaker strobes and 1 speaker only. 11th floor relocation of 50 speaker strobes and 7 new speaker strobes, 12th floor 66 new speaker strobes and 1 new speaker only Status: Completed | Sequoyah Electric LLC | $39K |
#7116025-EL Electrical · Electrical SEA54 Bike Cages-Provide power and pathway for 2 wave sensors, provide power and pathway for 1 auto door opener. Site contact: Cody Schlosser Email: cschlosser@cochraninc.com Cell: 206.561.5807 Status: Completed | Cochran Inc | $10K | |
| applied Oct 1 | #7109717-EL Electrical · Electrical Scope is install (1) new 400A 120/208V panel being feed from existing transformer and install (20) 40A circuits for owner furnished car chargers. [10/28/25 KEF - Plan set approved.] Status: Completed | JH Kelly, LLC | $85K |
#7113895-EL Electrical · Electrical VE JOB#21814 Apollo Lowe voltage DDC controls for HVAC system upgrade please contact Francisco for inspections @ 206-876-0019 Status: Completed | Valley Electric Co. Of Mount Vernon Inc | $56K | |
| applied Sep 5 | #7104545-ME Mechanical · Trade Provide and install (2) new Fan Powered VAVs with Electric Heat, relocate existing VAVs, rework existing and provide new medium and low pressure duct. Provide and install new supply, return, and transfer GRDs. Provide and install new exhaust duct, per plans. Status: Completed | Not published | $750K |
| applied Oct 7 | #7110354-EL Electrical · Electrical Provide new lighting fixtures, lighting controls, power, and furniture power-Seq Job #101216 [10/24/25 KEF - Plan set approved.] Status: Completed | Not published | $2.9M |
#7112080-EL Electrical · Electrical 325 9th Ave N, Job #4006277; Provide and install (1) receptacle, lvl5. Site Contact: Shawn Boulger (425) 457-2224 Status: Completed | Prime Electric | $1.5K | |
#7110999-EL Electrical · Electrical 718655 SEA54 project - Pull New CAT6, CAT6A & New Sound Masking System Status: Completed | Veca Electric & Technologies, LLC | $280K | |
#7110235-EL Electrical · Electrical SEA54 527653-06 - Add Wave Sensor to Bike Storage Room Status: Completed | Not published | $8.2K | |
#7107890-EL Electrical · Electrical Install and pull cable for 27 cameras and 9 card readers into new enclosures in the IDF. Status: Completed | Cochran Inc | $166K | |
#7105104-EL Electrical · Electrical load bank testing on electric backup generator - SR00117085 Status: Completed | Pacific Power Group | $450 | |
#7104849-EL Electrical · Electrical Data Cabling for the Angio Project at UW A1 Level 1 Status: Completed | Intra-communication Network System Inc | $30K | |
| applied Aug 22 | #7103211-BK Tenant Improvment · Building Construct blanket permit tenant improvements to Apollo on floors: 10 11 and 12 of existing commercial building per plan. Status: Completed | Not published | $6.9M |
#7086565-EL Electrical · Electrical Performance of all electrical maintenance work, including but not limited to lighting, motors, controls, breaker replacement, and electrical device replacements. This work will be logged and then inspected on a semi-annual basis. Status: Completed | Not published | $5K | |
| applied May 1 | #7083640-CN Addition/Alteration · Building ANCHOR (4) PRE-MANUFACTURED PHONE BOOTHS ON MULTIPLE FLOORS SUBJECT TO FIELD INSPECTION STFI Status: Issued | Not published | $80K |
#7059350-EL Electrical · Electrical SEQ # 101185 - Install qty (12) receptacles and qty (12) light fixtures Status: Completed | Sequoyah Electric LLC | $5K | |
#7059360-EL Electrical · Electrical SEQ # 101185 - Install qty (12) receptacles and qty (12) light fixtures Status: Completed | Sequoyah Electric LLC | $5K | |
#7059355-EL Electrical · Electrical SEQ # 101185 - Install qty (12) receptacles and qty (12) light fixtures Status: Completed | Sequoyah Electric LLC | $5K | |
#7059356-EL Electrical · Electrical SEQ # 101185 - Install qty (12) receptacles and qty (12) light fixtures Status: Completed | Sequoyah Electric LLC | $5K | |
#7055773-EL Electrical · Electrical 525047-SEA54 Lobby Turnstiles-Cochran to provide and install 1ea circuit for bypass door header. Site contact: Cody Schlosser Email: cschlosser@cochraninc.com Cell:206.561.5807 Status: Completed | Cochran Inc | $6.7K |