Commercial General Building, Electrical, Elevator, Hvac/Mechanical work permitted March 11, 2025, with 13 permits through October 12, 2026, declaring $335,906 of work. Contractor on record: 16d LLC.
Get new commercial permits near 98109 or Seattle, free weekly email
Modernization of hydraulic elevator including, controller, power unit, car and hall fixtures, door operator, door edge and hoistway wiring. EQP-SI-05387 / EQP-CY-02739 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC, Vertical Dimensions and Fujitec Elevator as the contractors on this project, among 4 contractors in all.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
13 permits issued Mar 11 – Oct 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7167072-EL Electrical · Electrical Converting old decommissioned pool room to rec room with gym and table games. Installing 3 circuits from existing panels. Receptacles for UF fans and exercise machines. Adding 2 lights for pool table and ping-pong table. Status: Issued | Contractor with Pro | — | |
#7152362-EL Electrical · Electrical Relocate two switches and one outlet upgrade to GFI where code requ That's it Status: Issued | Not published | — | |
| applied Feb 10 | #7122652-CN Addition/Alteration · Building Construct alterations at level 3 of existing multifamily building occupy per plan. Status: Issued | Not published | $75K |
| applied Jan 26 | #7122207-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and nearby outdoor wall. Status: Completed | Not published | $9.4K |
| applied Feb 5 | #7127783-CY Conveyance · Trade Elevator Cab Alterations Includes: Wall Panels, Handrails, Ceiling with Lighting, Flooring and Cladding. EQP-SI-05387 / EQP-CY-02739 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Weight coming out: 432lbs Weight going in: 421lbs Status: Issued | Vertical Dimensions | $26.1K |
| applied Dec 11 | #7120887-EL Electrical · Electrical For the purpose of elevator modernization: Replace conventional fire alarm and initiating devices with addressable. Install elevator landing and machine room smoke detection. Install relays in elevator machine room. Status: Completed | 16d LLC | $22.4K |
#7122417-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATON Status: Completed | 16d LLC | $10.3K | |
| applied Dec 22 | #7122220-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7122207-ME Status: Completed | 16d LLC | $9.4K |
| applied Oct 29 | #7114013-CY Conveyance · Trade Modernization of hydraulic elevator including, controller, power unit, car and hall fixtures, door operator, door edge and hoistway wiring. EQP-SI-05387 / EQP-CY-02739 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Fujitec Elevator | $169K |
#7090438-EL Electrical · Electrical Apt 405 - Install 200amp electrical panel [6/12/2025 PGF Added (1) 15-20A dedicated appliance circuit to permit per contractor request (Kaulie). Post-issuance change fee included.] Status: Completed | Greenwood Heating & Home Services | $6K | |
| applied Apr 9 | #7076521-CN Addition/Alteration · Building Construct tenant improvement for condominium unit at the first floor for unit 103 of existing multifamily building per plan. Status: Completed | Not published | $2.5K |
| applied Mar 25 | #7076610-ME Mechanical · Trade Complete installation of heat pump to SDCI code requirements per plans Status: Completed | Not published | $7.7K |
| applied Mar 11 | #7074862-RF Refrigeration · Trade Correct installation of heat pump to meet SDCI code requirements. Status: Completed | Not published | $7.5K |