Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted March 24, 2026, with 32 permits through October 27, 2026, declaring $6,083,413 of work. Contractor on record: Prime Electric.
Tenant improvements at levels 1-3 of existing commercial building per plan. Mechanical included.
Seattle permit records name Prime Electric, 16d LLC and Vertical Dimensions as the contractors on this project, among 12 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 7 permits issued in the last 30 days is included with Pro.
Commercial and multifamily, biggest first.
32 permits issued Mar 24 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 23 | #7163714-EL Electrical · Electrical add to existing fire alarm system Status: Issued | Contractor with Pro | $30K |
| applied Oct 20 | #7168231-RF Refrigeration · Trade For the purpose of elevator modernization: Replace existing unit with new split unit in existing car 4 machine room and adjacent roof wall. Status: Issued | Contractor with Pro | $7.8K |
#7166825-EL Electrical · Electrical Providing Card reader to existing elevator. Adding Duplex/connection to access control power supply. Status: Completed | Not published | — | |
| applied Sep 14 | #7162452-EL Electrical · Electrical Lighting retro - take down and replace with LED. Replacing (6) existing panels like to like with suitable AIC/SCCR rating. Reuse existing circuits and feeders. Provide wiring for cash wraps and miscellaneous merchandising power locations. Note Prime Electric is also working in the suite but for… Status: Issued | Contractor with Pro | $245K |
#7166616-EL Electrical · Electrical installation of teledata cable on floor 1,2 and 3 for Nordstrom Rack Status: Issued | Contractor with Pro | — | |
#7166166-EL Electrical · Electrical 601 Pine Street - Job 5005378: Install (3) Singlemode fiber backbones from MPOE to Lvl 2/3/4 Status: Issued | Contractor with Pro | — | |
#7166168-FS Fire Sprinkler and Suppression · Trade Nordstrom Rack relocation to 601 Pine Street. Multistory building protected throughout by existing fire sprinklers. Sprinkler modifications to portions of the system(s) on 2nd and 3rd floors. Will need to relocated/swap sprinklers as necessary to accommodate for new ceilings and walls.… Status: Issued | Contractor with Pro | $6.4K | |
#7164687-EL Electrical · Electrical Background music sound system for retail space - Nordstrom Rack. 93 speakers total. Status: Issued | Audio Video Exclusives | — | |
#7163842-EL Electrical · Electrical For the purpose of elevator modernization: Replace existing elevator machine room smoke detectors with relay base smoke detectors for hat indications Status: Issued | 16d LLC | — | |
#7163815-EL Electrical · Electrical Installing a new video surveillance and intrusion detection system Status: Issued | Security Solutions NW | — | |
| applied Sep 15 | #7162625-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7162623-ME Status: Issued | 16d LLC | $17.8K |
#7161393-EL Electrical · Electrical (2) 50amp temp power circuits for spider boxes Status: Issued | Sea-Tac Electric Inc | — | |
| applied Jul 13 | #7151725-SB Sign, Awning and Canopy · Trade install one canopy sign and one projecting sign for Nordstrom Rack. Status: Issued | Ion Sign Group LLC | $10K |
#7160708-EL Electrical · Electrical Low Voltage HVAC Energy Management Controls System Status: Issued | Datskiy Electric LLC | — | |
| applied Apr 30 | #7132340-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Issued | Not published | $350K |
#7156221-BP Boiler/Pressure Vessel · Trade The project at 601 Pine St. involves the demolition and removal of existing rooftop HVAC equipment and associated ductwork to support a planned mechanical system upgrade. Work included disconnecting and removing rooftop units, duct connections, supports, and related components, as well as… Status: Issued | Auburn Mechanical | $1.8M | |
#7156219-BP Boiler/Pressure Vessel · Trade The project at 601 Pine St. involves the demolition and removal of existing rooftop HVAC equipment and associated ductwork to support a planned mechanical system upgrade. Work included disconnecting and removing rooftop units, duct connections, supports, and related components, as well as… Status: Issued | Auburn Mechanical | $1.8M | |
#7157679-EL Electrical · Electrical Electrical for elevator modernization. Status: Issued | 16d LLC | — | |
| applied Aug 11 | #7157316-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING - Car 2 EQP-SI-06690 / EQP-CY-05151 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 815 lbs. Weight coming out: 835 lbs. Status: Issued | Vertical Dimensions | $27.4K |
| applied Aug 11 | #7157318-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING - Car 3 EQP-SI-06690 / EQP-CY-05152 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 674 lbs. Weight coming out: 691 lbs. Status: Issued | Vertical Dimensions | $27.4K |
#7157267-EL Electrical · Electrical Joint venture with Prime Electric - Adding (3) new duct detectors[8/10/2026 JBC Added Prime Electric to Permit] Status: Issued | Guardian Security Systems Inc | — | |
| applied Aug 10 | #7157314-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING - Car 1 EQP-SI-06694 / EQP-CY-05178 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 669 lbs. Weight coming out: 686 lbs. Status: Issued | Vertical Dimensions | $27.4K |
| applied Apr 16 | #7122723-CN Addition/Alteration · Building Tenant improvements at levels 1-3 of existing commercial building per plan. Mechanical included. Status: Issued | Not published | $3M |
| applied Jul 27 | #7153698-CY Conveyance · Trade EQP-SI-06694 / EQP-CY-05178 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Traction Mod- New controller, electro-magnetic brake, governor, governor rope, hoist ropes, seismic switch, rope gripper, hoistway wiring, cop & hall fixtures, elsco roller guides, door operator, 3D door edge, car &… Status: Issued | Fujitec Elevators | $327K |
| applied Jul 22 | #7153692-CY Conveyance · Trade Hydro Mod- New controller, pump unit, OSV, hoistway wiring, cop & hall fixtures, elsco roller guides, door operator, 3D door edge, car & hoistway doors, & pit ladder - Car 2 EQP-SI-06690 / EQP-05151 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Fujitec Elevators | $192K |
| applied Jul 7 | #7151173-EL Electrical · Electrical 601 Pine White Shell - Job 4006606: Remove (7 EA) total panels and install (7 EA) new panels that meet the required Fault Current Rating per the new Fault Current Study that has been performed by Coffman Engineering. We are only installing new panels and keeping all remaining circuits at each… Status: Completed | Prime Electric | $70K |
#7147182-EL Electrical · Electrical 601 Pine White Shell - Job 4006606: Demo out (2) existing RTU rated at 300A each. Demo (2) exhaust fans located on top pf penthouse roof. Install (2) new RTU rated at 40A and 140A. Install (1) new Boiler rated at 350A. Install (1) new HP rated at 150A. See attached revised panel load for PNL… Status: Completed | Prime Electric | — | |
#7142940-EL Electrical · Electrical 601 Pine White Shell - Job #4006606: Take down (30) 1x4 incandescent fixtures and install new LED 1x4 fixtures. This is for corridors in back of house areas ONLY. This is for BASEMENT LEVEL only.[CF7/1/2026 - This permit also includes line voltage work for FACP change and AES radio addition on… Status: Completed | Prime Electric | — | |
#7142972-EL Electrical · Electrical 601 Pine White Shell - Levels 3 + 4 - Job 4006606: Take down (21) 1x4 compact fluorescent fixtures and install new LED 1x4 fixtures. Takedown and install (5) Exit Signs. One circuit involved on each floor. Status: Completed | Prime Electric | — | |
#7140272-EL Electrical · Electrical Installing an Emergency Responder Communications Enhancement System (ERCES) for 601 Pine. PowerCom Job# 550586 Status: Issued | PowerCom, Inc. | — | |
#7140294-EL Electrical · Electrical Fire panel replacement - 1 device Status: Completed | Guardian Security Systems Inc | — | |
#7134906-EL Electrical · Electrical Extending existing circuit to provide connection to new access control power supply. Status: Completed | Not published | — |
In Seattle, biggest first.