Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted November 22, 2024, with 33 permits through October 1, 2026, declaring $359,538 of work. Contractor on record: Prime Electric.
JOB # 526112 - Install Bastille Network at SEA43 15floor
Seattle permit records name Prime Electric, Cochran Inc and Johnson Controls Fire Protection as the contractors on this project, among 8 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
33 permits issued Nov 22 – Oct 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 6 | #7156913-EL Electrical · Electrical Modification to existing fire alarm system for suite on Level 1 of Tower 1. Installation of (33) new devices and relocation of (13) existing devices. This is a joint venture between Johnson Controls and R-C True Line Corp. Status: Issued | Contractor with Pro | $20.9K |
#7157262-EL Electrical · Electrical 2250 7th Ave - Job 1027290: Altering (1) 20A circuit to install (1) Duplex NEMA 5-15 receptacle. Status: Issued | Prime Electric | — | |
#7157407-EL Electrical · Electrical Modification to existing fire alarm system. Installation of (1) new speaker/strobe on Level 7. Status: Issued | Johnson Controls Fire Protection | — | |
#7154618-EL Electrical · Electrical 526546 - Alter existing 120V, 20A branch circuit serving security power enclosure to install listed RSB2 switching device. No new branch circuit, no service or feeder modification, and no load increase. Status: Issued | Not published | — | |
#7144750-BP Boiler/Pressure Vessel · Trade Replacing an AMTROL THERMXTROL ST80VC Commercial Thermal Expansion Tank with like-in-kind, due to failed internal bladder. Status: Completed | JLL Nitro SEA48 | $5K | |
#7136899-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - add and relocate sprinkler for wall relocation Status: Issued | Patriot Fire Protection Inc | $2.8K | |
#7136206-EL Electrical · Electrical 2250 7th Ave- Job# 1026112, adding (1) duplex receptacle, level 15. Site Contact: Shawn Boulger 425-457-2224 Status: Issued | Prime Electric | — | |
#7133178-EL Electrical · Electrical 83444- Provide and Install new heat trace in the parking garage of Amazon Nitro. Provide and install (1) new Tracon FPT 130 heat trace unit. Provide and install (1) 30a 120v circuit and breaker Status: Completed | Cochran Inc | — | |
#7131956-EL Electrical · Electrical 82193_SEA43-Repair of customer provided lighting fixture / driver on SEA43 skybridge. Site Contact: Ken Little Email: klittle@cochraninc.com Cell: 2065862051 Status: Completed | Cochran Inc | — | |
| applied Jan 28 | #7126909-CY Conveyance · Trade Install car top handrails - Elevator S1 EQP-SI-10774 / EQP-CY-10109 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Artline | $8.1K |
| applied Jan 28 | #7126910-CY Conveyance · Trade Install car top handrails - Elevator S2 EQP-SI-10774 / EQP-CY-10110 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Artline | $8.1K |
#7126028-EL Electrical · Electrical Status: Completed | Prime Electric | — | |
#7115972-EL Electrical · Electrical 80962 Shutdown retail switchgear (MSB-43HN0GB5) to correct phase reversal for R1-8 (Supreme Dumplings)[11/19/2025 JBC Repaired 200amp Feeder Panel phase reversal at (MSB-43HN0GB65) for R1-8, Added Feeder to permit] Status: Completed | Cochran Inc | $3.9K | |
#7111315-FS Fire Sprinkler and Suppression · Trade Add protection for 2 new phone booths on floors 2 & 4 Status: Completed | Not published | $3.9K | |
#7104794-EL Electrical · Electrical Modification of existing fire alarm system. Install (3) ceiling mounted speaker/strobes to the newly built out Sound Booths. This is a joint venture between Johnson Controls Inc and Prime Electric LLC. Status: Completed | Johnson Controls Fire Protection | $9.5K | |
#7102711-EL Electrical · Electrical Modification to existing fire alarm system. Installing (1) new ceiling mounted speaker/strobe device to the newly added sound booth. This is a joint venture between Johnson Controls Inc and Prime Electric LLC. Status: Completed | Johnson Controls Fire Protection | $9.2K | |
| applied Jul 7 | #7094353-EL Electrical · Electrical Modify existing fire alarm system for tenant improvements. Amazon Block 21. Bike parking area. 2250 7th Ave Seattle, WA 98121. Install (1) new device and (2) new Vesda panels. This is a joint venture between Johnson Controls Fire Protection (JOHNSCP831PR) and Prime Electrical Services… Status: Completed | Johnson Controls Fire Protection | $55.3K |
| applied Jun 26 | #7093344-CN Addition/Alteration · Building Construct alterations to install pre-manufactured phone booths at 2nd and 4th floor levels of commercial office building [BLOCK 21 NITRO TOWER 1] subject to field inspection [STFI]. Status: Completed | Not published | $60K |
#7090920-EL Electrical · Electrical Job 4005461: Adding (2) general use duplex. Site contact: Shawn Boulger (425) 457-2224 Status: Completed | Prime Electric | $500 | |
#7087257-EL Electrical · Electrical Job 4005676: Adding (1) general use receptacle. Contact: Shawn Boulger (425) 457-2224 Status: Completed | Prime Electric | $500 | |
#7073808-EL Electrical · Electrical Job 4005441: Adding (1) 120v single poing connection for new fan. Contact Shawn Boulger 425-457-2224. 3/12/2026 jnl renewal Status: Completed | Prime Electric | $700 | |
#7073030-EL Electrical · Electrical 526776 SEA43 - Install 1 door package at sea43 15F telecom riser room Status: Completed | Not published | $17K | |
#7071954-EL Electrical · Electrical SEA-43 Add 2 cameras, Relocate 1 camera. Levels 0G and 2. Status: Completed | Not published | $8K | |
#7069517-EL Electrical · Electrical 77045 - Provide and install (1) 30a 208 single phase circuit in emt for the composter with NEMA L6-30R plug Status: Completed | Cochran Inc | $4.6K | |
| applied Feb 6 | #7068358-ME Mechanical · Trade Install (1) new exhaust fan - Subject to Field Inspection (STFI) Status: Completed | Not published | $7.5K |
#7063190-EL Electrical · Electrical 526113 Provide and install 100' of conduit and power to Energize (1) Trove can panel. Site Contact: Cody Schlosser 206-561-5807 cschlosser@cochraninc.com[8/8/2025 JBC Added Dedicated circuit to Permit]. Status: Completed | Cochran Inc | $3.4K | |
#7062626-EL Electrical · Electrical Install network cabling as part of tenant improvement Status: Completed | Teknon Corporation | $33.2K | |
#7060902-EL Electrical · Electrical Install (2) 50A/208v circuits, (1) 20A/208v circuit & (1) 20A/120v circuit for new equipment. Relocate (6) 20A/120v circuits, (1) 30A/208v circuit & (1) 50A/208v circuit-Seq Job #305819 REPLACING PERMIT 7059725-EL Status: Completed | Not published | $30K | |
#7060086-EL Electrical · Electrical Add (2) cut-in duplex receptacles utilzing existing circuitry. Job 7011173 ATTN SHAWN BOULGER (425) 457-2224 Status: Completed | Prime Electric | $2K | |
#7059752-EL Electrical · Electrical JOB # 526112 - Install Bastille Network at SEA43 15floor Status: Completed | Not published | $74K | |
#7059725-EL Electrical · Electrical SEQ# 305819 - Install (2) 208v/50amp circuits for added equipment. Install (1) 208v/20amp circuit for added equipment Install (2) 120v/20amp circuits for added equipment. Status: Completed | Sequoyah Electric LLC | $30K | |
#7057830-EL Electrical · Electrical 38184 GENERATOR LOAD BANK Status: Completed | Not published | $500 | |
#7057817-EL Electrical · Electrical 38185-PERFORM LOAD BANK ON GENERATOR Status: Completed | Not published | $500 |