Commercial Electrical, Hvac/Mechanical work permitted April 1, 2025, with 10 permits through September 29, 2026, declaring $18,202,659 of work. Contractor on record: Prime Electric.
Installation of electrical and low-voltage systems to support construction of a new 44 story mixed-use residential tower, which includes a below grade parking structure. Job #6007434 Contact: Paul Mattoon 425-351-2074 [1-8-25 BZ changed Address to follow BLDG Permit 6911575-PH] 3/30/2026 - AB Renewal
Seattle permit records name Prime Electric, Hermanson Company and TeamLINX as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Apr 1 – Sep 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7163698-BP Boiler/Pressure Vessel · Trade Installation of new pressure vessel in roof 2 mechanical room. Taco CTH3000F08-S100 Buffer Tank Serial # 547516 Status: Issued |
| Hermanson |
| $51K |
#7158134-EL Electrical · Electrical Installation of new Cellular DAS throughout entire building.[8/18/2026 JBC - Permit Fees are incorrect there are actully 10 Headend Controllers and 213 Antennas, this permit only had 7 antennas on it, Added 206 Antennas and 10 Headend Controllers to this permit, prior permits 7099643-EL &… Status: Issued | TeamLINX | — |
#7144507-BP Boiler/Pressure Vessel · Trade Install (1) electric boiler. Status: Issued | Hermanson Company | $33K |
#7144511-BP Boiler/Pressure Vessel · Trade Install (1) electric boiler. Status: Issued | Hermanson Company | $33K |
| applied Oct 9 | #7110967-EL Electrical · Electrical NEW FIRE ALARM SYSTEM WITH VOICE EVACUATION FOR NEW RESIDENTIAL MIXED-USE HIGH RISE SUBMITTED UNDER 2018 SEATTLE FIRE CODE. THIS IS A JOINT VENTURE BETWEEN CONVERGINT AND PRIME ELECTRIC. Status: Issued | Prime Electric | $400K |
#7111105-EL Electrical · Electrical HVAC Low Voltage Wiring. Status: Issued | Datskiy Electric LLC | $250K |
#7107422-EL Electrical · Electrical 616 Battery - Job 5003715: Installing Structured Cabling for ERRCS System. Site contact: Senad Kameric (425) 505-5387. 8/19/2026 jnl renewal Status: Issued | Prime Electric | $250K |
#7107323-EL Electrical · Electrical 616 Battery - Job 5003638: Installing Structured Cabling for Telecom, Access Control, Wireless, AV and CCTV cabling. Site contact: Senad Kameric (425) 505-5387. 8/18/2026 jnl renewal Status: Issued | Prime Electric | $750K |
#7100913-EL Electrical · Electrical LOW VOLTAGE CELLULAR DAS ENHANCEMENT SYSTEM[8/18/2026 JBC Closing this Permit, Contractor No longer on Site, new Permit 7158134-EL and Contractor on Project] Status: Closed | Not published | $597K |
| applied Dec 3 | #7048055-EL Electrical · Electrical Installation of electrical and low-voltage systems to support construction of a new 44 story mixed-use residential tower, which includes a below grade parking structure. Job #6007434 Contact: Paul Mattoon 425-351-2074 [1-8-25 BZ changed Address to follow BLDG Permit 6911575-PH] 3/30/2026 - AB… Status: Issued | Prime Electric | $16.1M |