Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted January 30, 2025, with 19 permits through June 1, 2026, declaring $829,353 of work. Contractor on record: ACCO Engineered Systems.
Get new commercial permits near 98134 or Seattle, free weekly email
Tenant Improvements at SE corner of 1st floor of existing commercial building per plan
Seattle permit records name ACCO Engineered Systems, Cochran, Inc. and Western States Fire Protection as the contractors on this project, among 8 contractors in all.
19 permits issued Jan 30 – Jun 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7133054-ME Mechanical · Trade Install (1) new air compressor and associated accessories in roof penthouse. Install new compressed air drops on level 2, per plan. Status: Completed |
| ACCO Engineered Systems |
| $45K |
#7140521-EL Electrical · Electrical 1 cat 6 cable to 2 locations Status: Completed | Cochran, Inc. | — |
#7139703-BP Boiler/Pressure Vessel · Trade Installing new air receiver. Status: Completed | ACCO Engineered Systems | $45K |
#7131342-EL Electrical · Electrical Installing 9 furniture whips from existing wall locations Status: Completed | Not published | — |
| applied Dec 31 | #7120248-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Completed | Not published | $15K |
| applied Nov 12 | #7116483-EL Electrical · Electrical ADD FIRE ALARM A/V NOTIFICATION WITHIN SUITE 130C Status: Completed | Western States Fire Protection | $10K |
| applied Nov 24 | #7117232-ME Mechanical · Trade Ductwork including; relocate 10 existing GRDs, add 18 new supply diffusers and return grills with new ducts runs. STFI (Subject to Field Inspection) Status: Completed | Five Star Comfort LLC | $13.8K |
#7117812-EL Electrical · Electrical Low Voltage for 1 thermostat. Status: Completed | ACCO Engineered Systems | $500 |
| applied Nov 13 | #7116012-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Completed | ACCO Engineered Systems | $15K |
#7116789-FS Fire Sprinkler and Suppression · Trade Add 23 fire sprinkler heads for a tenant improvement Status: Completed | Crown Fire Protection, INC | $4.5K |
#7113527-EL Electrical · Electrical Install Misc power and lighting for TI space Status: Completed | Olsen Electric Inc | $56.6K |
| applied Sep 5 | #7095139-CN Addition/Alteration · Building Tenant Improvements at SE corner of 1st floor of existing commercial building per plan Status: Completed | Not published | $503K |
#7106807-EL Electrical · Electrical LOW VOLTAGE SECURITY - UPGRADE CURRENT SYSTEM TO FLEX IP Status: Completed | Sound Security | $9.3K |
#7093791-EL Electrical · Electrical disconnect (e) split-system heat pump and air handler and reconnect replacement units. Reconnect (e) tstat to (n) air handler. Status: Completed | ACCO Engineered Systems | $1K |
| applied Jun 28 | #7093663-ME Mechanical · Trade Replace (1) split-system heat pump, like-for-like. subject to field inspections (STFI) Status: Completed | ACCO Engineered Systems | $18K |
| applied Jun 30 | #7093664-RF Refrigeration · Trade Install (1) set of R-454B refrigerant lines to serve (1) split-system heat pump Status: Completed | ACCO Engineered Systems | $500 |
#7091603-EL Electrical · Electrical Decommissioning appx (220) cat 5e cables. Status: Completed | Cochran, Inc. | $15K |
#7077711-EL Electrical · Electrical SEQ# 7315448. REPAIR DAMAGED FEEDER Status: Completed | Sequoyah Electric LLC | $3K |
| applied Dec 26 | #7062112-ME Mechanical · Trade Replace water source heat pumps with code compliant units. Reconnect condensate and condenser water connections. per plans Status: Completed | Not published | $150K |