Commercial General Building, Electrical, Fire Protection, Sign work permitted April 22, 2025, with 17 permits through August 11, 2026, declaring $6,871,225 of work. Contractor on record: Precision Electric Group, Inc.
Construct alterations and voluntary seismic upgrades to a private high school (Phase 2) per plans. Mechanical included this permit
Seattle permit records name Precision Electric Group, Inc, Morgan Sound, Inc. and Elmecco Inc as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
17 permits issued Apr 22 – Aug 11, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Aug 10 | #7157453-CN Addition/Alteration · Building Tenant improvement to wrestling room at Bishop Blanchet High School subject to field inspection STFI. Status: Issued | Not published | $25K |
#7149941-EL Electrical · Electrical Adding standalone LV AV system to weight room. Status: Issued | Morgan Sound, Inc. | — | |
#7149671-EL Electrical · Electrical Add receptacles and data drops for smart boards Status: Issued | Elmecco Inc | — | |
#7143865-FS Fire Sprinkler and Suppression · Trade Reroute section of fire sprinkler main in basement boiler room to make way for structural upgrades. Status: Completed | Cosco Fire | $15K | |
| applied Dec 23 | #7114231-CN Addition/Alteration · Building Construct alterations and voluntary seismic upgrades to a private high school (Phase 2) per plans. Mechanical included this permit Status: Completed | Not published | $4.3M |
| applied Mar 19 | #7134173-EL Electrical · Electrical *Associated Permit number 7129324-EL* Phase 2 upgrades expanded to include all of the North end of L2 and L3. Revised the rest of the phasing plan to cover all portions of the school to remove 120v bell/pull system with new horn strobe notification. 22 additional horn/strobes and 2 additional pull… Status: Completed | Precision Electric Group | $30K |
| applied Feb 17 | #7129324-EL Electrical · Electrical Phase 2 upgrades, remove bells/pulls in area of work, replace with new horn strobe notification in areas of work only. 30 horn strobes, 3 strobe only, 2 pull stations, 2 duct detectors and relays and 1 smoke added at power supply in ceiling hatch on L2. Additional phasing shown on phasing page of… Status: Completed | Precision Electric Group | $24.8K |
| applied Jan 29 | #7127072-EL Electrical · Electrical Phase 2 remodel of existing school including new power, lighting & low voltage for select classrooms on level 1, 2 & 3 that are affected by shear wall installation. [2.19.26 VR, See Phase II CN Permits 7118632-CN, 7114532-CN, 7114231-CN] Status: Completed | Precision Electric Group, Inc | $450K |
#7129505-EL Electrical · Electrical 05698257 - AES Fire Radio Install in FACF Room. This is to replace permit 6945525-EL Status: Issued | Performance Systems, Puget Sound | — | |
| applied Feb 3 | #7126723-SB Sign, Awning and Canopy · Trade INSTALL DOUBLE FACE ILLUMINATED POLE SIGN, SEE MUP 3041993-LU for variance approval. 2/3/26 SS: Conditions of approval: Static text image only. The display shall not scroll, stream or flash. No picture images, video display or motion graphics are allowed. Monochrome display only, i.e. dark… Status: Completed | National Sign Corporation | $34K |
#7112851-EL Electrical · Electrical Extending the wiring for control valves on hydronic baseboard heaters Status: Completed | ACCO Engineered Systems | $200 | |
| applied Jun 23 | #7092678-EL Electrical · Electrical 1 new conference rm, 3 offices and 1 Reception area added to the 1st floor entry to the school. Building fire alarm system is manual pull stations only, no occupant notification. Adding 2 smokes and 5 horn/strobes. Existing EST3X fire alarm panel. Status: Completed | Convergint Technologies | $7.3K |
#7099963-EL Electrical · Electrical HVAC Controls Status: Completed | Datskiy Electric LLC | $6K | |
| applied Apr 10 | #7079958-EL Electrical · Electrical Bishop Blanchet HS Classroom Mockup & Seismic Retrofit. [ 7-24-25 BZ Revision Approved ] Status: Completed | Precision Electric Group | $500K |
| applied Dec 27 | #7046020-CN Addition/Alteration · Building Construct alterations and voluntary seismic upgrades to a private high school (Phase 1) per plans. Mechanical included this permit Status: Completed | Not published | $1.4M |
| applied Apr 29 | #7082161-CN Addition/Alteration · Building Construct tenant improvements to existing commercial building (Bishop Blanchet High School) for early demolition per plan. Status: Completed | Not published | $75K |
#7081856-EL Electrical · Electrical Pathway for new fiber from roof to demarc room - fiber by others Status: Completed | Precision Electric Group, Inc | $4K |