Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical, Sign work permitted November 14, 2024, with 6 permits through September 15, 2026, declaring $147,150 of work. Contractor on record: Macdonald Miller Facility Solutions LLC.
Replace existing 7.5 ton package rooftop heat pump with new 7.5 ton heat pump unit. Reconnect to existing supply & return ducts. Replace existing 5 ton package rooftop heat pump with new 5 heat pump unit. Replace existing 3 ton package rooftop heat pump with new 3 ton heat pump unit. Reconnect to existing supply & return ducts. Replace existing 5 ton split system heat pump with new 5 ton heat pump unit. Reconnect to existing supply & return ducts. Replace existing 7.5 ton split system heat pump
Seattle permit records name Macdonald Miller Facility Solutions LLC, Cochran, Inc. and National Sign Corporation as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Nov 14 – Sep 15, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#7162614-EL Electrical · Electrical 86699 - Troubleshoot lighting Status: Completed | Cochran, Inc. | — | |
| applied Jun 18 | #7090678-SB Sign, Awning and Canopy · Trade INSTALL SINGLE FACE ILLUMINATED WALL SIGN. 6/18/25 SS: Address corrected from 1721 8th Ave S. to 8th Ave N. Status: Completed | National Sign Corporation | $5.7K |
#7091438-EL Electrical · Electrical 79044 - Troubleshoot upstairs men's bathroom lights. Status: Completed | Cochran, Inc. | $500 | |
| applied Nov 13 | #7051856-ME Mechanical · Trade Replace existing 7.5 ton package rooftop heat pump with new 7.5 ton heat pump unit. Reconnect to existing supply & return ducts. Replace existing 5 ton package rooftop heat pump with new 5 heat pump unit. Replace existing 3 ton package rooftop heat pump with new 3 ton heat pump unit. Reconnect to… Status: Completed | Macdonald Miller Facility Solutions LLC | $129K |
#7064329-EL Electrical · Electrical Install 3 Ton CU and AHU Install 2 Exhaust Fans****Updated Scope: 5/13/25 HP-1 Demoing the old unit (HP-1) and using the existing circuit (2 AWG) to feed the new unit installing new disconnect, and new fuses. 208-230/60/3 MCA 98 MOP 110 Breaker 100 Wire 2 AWG HP-2 Demoing the old unit (HP-2) and… Status: Completed | Macdonald Miller Facility Solutions LLC | $12K | |
| applied Nov 14 | #7056504-RF Refrigeration · Trade REPLACE EXISTING 5 TON SPLIT SYSTEM HEAT PUMP WITH NEW 5 TON HEAT PUMP UNIT. RECONNECT TO EXISTING SUPPLY & RETURN DUCTS. REPLACE EXISTING 7.5 TON SPLIT SYSTEM HEAT PUMP WITH NEW 4 TON HEAT PUMP UNIT & NEW 3 TON HEAT PUMP UNIT. RECONNECT TO EXISTING SUPPLY & RETURN DUCTS. Status: Completed | Macdonald Miller Facility Solutions LLC | — |