Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted November 11, 2024, with 22 permits through October 21, 2026, declaring $402,971 of work. Contractor on record: Prime Electric.
Construct alterations for a new spray booth on 6th floor per plan. Mechanical included.
Seattle permit records name Prime Electric, Macdonald Miller Facility Solutions LLC and Auburn Mechanical as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
22 permits issued Nov 11 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7168571-EL Electrical · Electrical Stadium West ID Studio Add VC System - Job 1025794: (1) 2-gang junction box to support standard 120v quad-duplex- receptacle. Provide only (1) new circuit to support receptacles. Status: Issued | Contractor with Pro | — | |
#7167293-EL Electrical · Electrical Meta SW6 6th Floor Data - Job 5005653 Status: Issued | Contractor with Pro | — | |
#7167162-EL Electrical · Electrical Meta SW6 3D Printers - Job 5005653: Install 15 communication cables. Status: Issued | Contractor with Pro | — | |
#7161302-EL Electrical · Electrical S26013 - Stadium West Atreides Lab HP Jet Fusion 5600 - Job 1020030: New 80A fused-disconnect install cord whip and pin & sleeve receptacle, new 25A fused disconnect, replace existing 20A breakers with 30A breakers. Status: Issued | Prime Electric | — | |
| applied Aug 20 | #7156979-ME Mechanical · Trade Modify the existing HVAC and controls systems, demo of existing ductwork, installing a new exhaust connection, a VAV box, and adding controls STFI (Subject to Field Inspection) Status: Issued | Auburn Mechanical | $10K |
#7150500-EL Electrical · Electrical "Add (1) 25A circuit 277V Change 3 receptacles to GFCI(KP this project is installing insta hot -water heater 25A circuit 277v only ) Work location: 4th Floor Status: Completed | Prime Electric | — | |
#7142646-EL Electrical · Electrical 440323 SEA102 OSS Fiber - installing, terminating, and testing armored single mode fiber: (3) new 144 strand, (1) new 48 strand, and (2) new 72 strand. Status: Completed | OEG, Inc | — | |
#7136056-EL Electrical · Electrical S26015 - Stadium West Galactica Thermal Chamber L15-20R Cord Drop- Job #1026178, Install conduit, supports, and wire from panelboard 2P4A7 by freight elevator to Galactica Actual lab, Fabricate and install ceiling cord drop with L15-20R cord cap connector at location noted on drawing. Install new… Status: Completed | Prime Electric | — | |
#7132810-EL Electrical · Electrical S25129 - Stadium West Melange Downdraft Table- Job #1025919- o Recommend demo of existing twist-lock wall receptacle & MC cable back to junction box in ceiling,tie-in new #10AWG wire and provide cord drop with new 120V 30A twist-lock receptacle, Provide and install 120V 30A twist-lock receptacle… Status: Completed | Prime Electric | — | |
#7130925-EL Electrical · Electrical S25128 - Stadium West ID Studio Add VC System- Job #1025794, For (2) casework locations (1 @ each end of the casework) install the following at 1'-6" AFF, JB1-LVC - (1) 1-gang junction box for corp net, B2-AVV - (1) 2-gang junction box for local AV net, 1.25" EMT Conduit stub-up, JB2-EC - (1)… Status: Completed | Prime Electric | — | |
| applied Oct 2 | #7102735-CN Addition/Alteration · Building Construct alterations for a new spray booth on 6th floor per plan. Mechanical included. Status: Completed | Not published | $200K |
| applied Dec 3 | #7114164-ME Mechanical · Trade Tie into existing exhaust duct running above the work bench and route 4" exhaust and damper to 3D Systems Cure 400 Curing Oven Re-balance exhaust fan serving all equipment within Fuse It or Lose It META have requested that we apply for a Class B oven permit in addition to our mechanical permit Status: Completed | Macdonald Miller Facility Solutions LLC | $4.4K |
#7114866-FS Fire Sprinkler and Suppression · Trade ADD UPRIGHTS FOR REMOVED CEILING IN A ROOM AND ADD HEADS TO LIMITED SPRAY BOOTH Status: Completed | Not published | $18.3K | |
#7112973-EL Electrical · Electrical Add (1) 30-amp circuit to a 277/480v panel. Status: Completed | Cochran Inc. | $3.2K | |
#7109863-EL Electrical · Electrical Frosted Mini Wheats Paint Booth - Job 4006212: 6th Floor - Demo existing wall devices, (1) wall light switch, Safe-off circuits during construction. Install (3) 8' linear lighting fixtures. Utilize existing 277V lighting circuit 1L6- 11. Install (1) L15 wall mounted illuminated LED "IN USE"… Status: Completed | Prime Electric | $25.4K | |
#7104341-EL Electrical · Electrical Job 4006117: · Relocate (6) existing power receptacles, Demo, fish wire through stud cavity, and install cut-in box, Receptacles centered 12" AFF. Relocate existing lv outlets provide & install rough-in. Prime to provide & install rough-in for data cabling. Data outlets centered 12" AFF. Provide… Status: Completed | Prime Electric | $3.6K | |
#7088883-EL Electrical · Electrical Job 4005738: S25041 - Stadium West Breakout Area Power Drops - Provide and install (3) 120v SO drops with receptacles on each drop. Contact: Kyle Hinton (425) 324-0845 Status: Completed | Prime Electric | $2.8K | |
#7070036-EL Electrical · Electrical Remove VAV from lobby and replace it with a new WSHP which will be in hallway of corridor ducted to old VAV supply duct. Scope includes piping, electrical Status: Closed | Macdonald Miller Facility Solutions LLC | $6.5K | |
#7060194-EL Electrical · Electrical 7010962 - S24009 - Stadium West Traka Box - Provide and install 120V recessed outlet. JOB #7010962. ATTENTION KYLE HINTON 425-324-0845 Status: Completed | Prime Electric | $1.5K | |
#7059574-EL Electrical · Electrical 7011060 - S24023 - Stadium West Home Depot: Install 400V 3Ph 16A 3.5kW transformer, Install (2) 30A 208V circuit breaker. Contact: Kyle Hinton 425-324-0845 Status: Completed | Prime Electric | $11K | |
| applied Dec 4 | #7059123-CY Conveyance · Trade Install controller drive EQP-SI-08286 / EQP-CY-07357 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | TK Elevator | $95K |
#7055771-EL Electrical · Electrical Job 7011029 - S24008 - Stadium West JoAnn Utility: Provide and install 120V 20A circuit for work bench power receptacles. Provide and install 120V 20A, 208V 20A, and 208V 30A power drops from existing panelboard. Contact: Kyle Hinton 425-324-0845 Status: Completed | Prime Electric | $21.2K |
In Seattle, biggest first.