Multifamily Electrical, Hvac/Mechanical work permitted March 25, 2025, with 5 permits through June 2, 2026, declaring $100,500 of work. Contractor on record: Auburn Mechanical Service.
1. We are replacing an existing access control system. (48) field devices going back to five headends. We are pull new wire. 2. Hardwiring five PSU to existing 120V circuits.
Seattle permit records name Auburn Mechanical Service, Region 6 Security and Unity Electric as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Mar 25 – Jun 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7145365-BP Boiler/Pressure Vessel · Trade remove and replace failed heat exchanger on Boiler #1 Status: Issued |
| Auburn Mechanical Service |
| $35K |
#7134558-EL Electrical · Electrical 41560 PERFORM GENERATOR LOAD BANK Status: Issued | Not published | — |
#7111593-EL Electrical · Electrical 1. We are replacing an existing access control system. (48) field devices going back to five headends. We are pull new wire. 2. Hardwiring five PSU to existing 120V circuits. Status: Completed | Region 6 Security | $65K |
#7083434-EL Electrical · Electrical REROUTE POWER CIRCUIT, NO CHANGES OTHERWISE Status: Completed | Unity Electric | $500 |
#7077327-EL Electrical · Electrical : PERFORM 2 HOUR LOAD BANK TEST ON STANDBY GENERATOR. DISCONNECT BUILDING CONDUCTORS, CONNECT LOAD BANK, PERFORM LOAD BANK TEST, LAND AND TORQUE BUILDING CONDUCTORS' Status: Completed | Not published | $500 |