Commercial General Building, Electrical, Elevator work permitted January 9, 2025, with 14 permits through September 29, 2026, declaring $757,180 of work. Contractor on record: Tke.
Construct alterations to SPL Central Library at L1 and L2 per plan.
Seattle permit records name Tke, Milne Electric and Entrance Controls Inc as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
14 permits issued Jan 9 – Sep 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 28 |
Commercial and multifamily, biggest first.
#7028993-CN Addition/Alteration · Building Construct alterations to SPL Central Library at L1 and L2 per plan. Status: Issued |
| Not published |
| $250K |
| applied Sep 22 | #7163654-CY Conveyance · Trade Install new door operator-3694933 Car 2 CONV:8222 US:134286 EBS: EQP-SI-07274 / EQP-CY-06221 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Tke | $83.4K |
#7152202-EL Electrical · Electrical 26089 - SPL COFFEE CART - INSTALL WIRELSS BUTTON Status: Issued | Entrance Controls Inc | — |
| applied May 20 | #7143627-CY Conveyance · Trade Door Drive - Controller Drive 3766328 US134287 Conv 8223 - Car 3 EQP-SI-07274 / EQP-CY-06222 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | TK Elevator Seattle | $71.2K |
| applied May 20 | #7143637-CY Conveyance · Trade Install Controller Drive Controller Drive 3766328 US134288 Conv 8224 Car 4 FRT EQP-SI-07274 / EQP-CY-06223 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | TK Elevator | $108K |
| applied May 14 | #7143129-CY Conveyance · Trade Install controller drive-3766328 Car:1 CONV:8221 US:134285 EBS:328318 EQP-SI-07274 / EQP-CY-06220 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Tke | $71.2K |
| applied May 14 | #7143130-CY Conveyance · Trade Install controller drive-3766328 Car:2 CONV:8222 US:134286 EBS:328318 EQP-SI-07274 / EQP-CY-06221 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Tke | $71.2K |
| applied May 6 | #7141624-CY Conveyance · Trade Install LD16 door operator-3694933 CAR:4 FRT CONV:8224 US:134288 EBS:327897 EQP-SI-07274 / EQP-CY-06223 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $83.4K |
| applied May 6 | #7141632-CY Conveyance · Trade Install LD16 door operator-3694933 CAR: 1 CONV:8221 US:134285 EBS:327897 EQP-SI-07274 / EQP-CY-06220 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $83.4K |
| applied May 6 | #7141626-CY Conveyance · Trade Install LD16 door operator-3694933 CAR: 2 CONV:8222 US:134286 EBS:327897 EQP-SI-07274 / EQP-CY-06221 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $83.4K |
#7117377-EL Electrical · Electrical Install (1) 30a. 208v. single phase circuit & L6-30R in same room as electrical panel L3D-2 on level 3 in network closet. Status: Completed | Milne Electric | $1.4K |
#7111220-EL Electrical · Electrical LOAD BANK TESTING ON BACK UP ELECTRIC GENERATOR - SR00118392 Status: Completed | Pacific Power Group | $450 |
| applied Mar 17 | #7075569-EL Electrical · Electrical Installing (1) New Sub Panel, Installing (2) New Level 3 EV Chargers, Installing (2) New Level 2 EV Chargers [3/25/25 KEF - Plan set approved.] [3/26/26 KEF - Revised plan set approved. New plan set supersedes prior stamped set.] Status: Completed | Not published | $230K |
#7064282-EL Electrical · Electrical Installing (5) new 120v. circuits and duplex receptacles, (2) floor poke through devices, & (1) floor service box in a raised floor. Installing raceways, pull strings, boxes, & flat rings for voice/data jacks. Status: Completed | Milne Electric | $12.3K |
In Seattle, biggest first.