Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted October 30, 2024, with 40 permits through July 29, 2026, declaring $1,767,941 of work. Contractor on record: Tke.
Construct alterations to install guards and plants for level 5 tenant [BRISTOL MYERS SQUIBB] existing north and south terraces of commercial office building per plan.
Seattle permit records name Tke, Precision Electric Group, Inc and McKinstry Co LLC as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
40 permits issued Oct 30 – Jul 29, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7155593-EL Electrical · Electrical Addition of New CCTV Devices and Network Cabling. EC Jon 836957 Status: Issued | EC Electric | — | |
| applied Mar 16 | #7117546-CN Addition/Alteration · Building Construct alterations to install guards and plants for level 5 tenant [BRISTOL MYERS SQUIBB] existing north and south terraces of commercial office building per plan. Status: Issued | Not published | $650K |
#7138429-FS Fire Sprinkler and Suppression · Trade Tenant improvement involving 1 sprinkler head. Status: Completed | McKinstry Co. LLC | $2.1K | |
| applied Mar 29 | #7134567-ME Mechanical · Trade Overhead compressed air tie-in. Provide/ install new compressed air piping Provide and install ceiling-mounted compressed air turret with shutoff valve STFI (Subject to Field Inspection) Status: Completed | Not published | $5K |
#7135324-EL Electrical · Electrical Upgrading the EST-3 fire alarm panels to EST-4. Status: Issued | Convergint Technologies | — | |
| applied Dec 2 | #7114501-CN Addition/Alteration · Building Construct interior non-structural alterations at level 7 and new pass-thru window at level 9 of existing laboratory space (Bristol Myers Squibb) per plan. Mechanical work included this permit. Status: Issued | Not published | $105K |
| applied Dec 17 | #7121205-EL Electrical · Electrical Relocation & Reconfiguration of lab equipment within the existing level 7 tenant space. Installation of a pass thru window between two existing lab rooms on level 9. [12/31/25 BGO - Approved Plan Set] Status: Issued | Precision Electric Group, Inc | $71.3K |
#7122052-EL Electrical · Electrical Adding a duplex receptacle per (2) Phone booths on levels 3 and 5. Status: Completed | Precision Electric Group, Inc | $16.1K | |
| applied Dec 2 | #7119167-EL Electrical · Electrical Joint venture between Convergint and Precision Electric Group. Install four strobes on LVL3 and LVL 5. Status: Completed | Not published | $320 |
#7121693-EL Electrical · Electrical JOINT VENTURE BETWEEN CONVERGINT AND PRECISION ELECTRIC GROUP. ADD 6 OR LESS FIRE ALARM DEVICES. Status: Issued | Not published | $100 | |
| applied Oct 29 | #7107682-CN Addition/Alteration · Building Construct alterations to office building at 3rd and 5th floors per plan. Status: Completed | Not published | $100K |
| applied Sep 18 | #7107426-CY Conveyance · Trade Install in-car security-1408640 Car:1(A) CONV:12080 US:331645 RO:4998101 EQP-SI-09369 / EQP-CY-08717 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107430-CY Conveyance · Trade Install in-car security-1408640 Car:2 (B) CONV:12081 US:331646 RO:4998102 EQP-SI-09369 / EQP-CY-08718 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107434-CY Conveyance · Trade Install in-car security-1408640 Car:3 (C) CONV:12082 US:331647 RO:4998103 EQP-SI-09369 / EQP-CY-08719 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107476-CY Conveyance · Trade Install in-car security-1408640 Car:4(T) CONV:12083 US:331648 RO:4998104 EQP-SI-09369 / EQP-CY-08720 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107484-CY Conveyance · Trade Install in-car security-1408640 Car: 5 (E) CONV:12084 US:331649 RO:4998105 EQP-SI-009369 / EQP-CY-08721 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107488-CY Conveyance · Trade Install in-car security-1408640 Car: 6 CONV:12027 US:331650 RO:4998106 EQP-SI-09369 / EQP-CY-08722 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
| applied Sep 18 | #7107494-CY Conveyance · Trade Install in-car security-1408640 Car:7 CONV:12028 US:331651 RO:4998107 EQP-SI-09369 / EQP-CY-08723 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $9.7K |
#7098717-EL Electrical · Electrical We are installing (2) additional fan speed relays. Status: Completed | Not published | $4K | |
#7097782-EL Electrical · Electrical Added 3 Phase 25A circuit to condesning unit. Status: Completed | Precision Electric Group, Inc | $2K | |
#7092975-EL Electrical · Electrical PEREFORM GENERATOR LOAD BANK Status: Completed | Not published | $500 | |
| applied Apr 21 | #7081754-EL Electrical · Electrical (6) EV chargers and a pay station installed in garage level P2. [4/30/25 KEF - Plan set approved.] Status: Completed | Precision Electric Group, Inc | $30K |
| applied Mar 31 | #7078106-CY Conveyance · Trade Install MAX unit-1346465 CON:12082 US:331647 RO:4796822 EQP-SI-09369 / EQP-CY-08719 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 31 | #7078109-CY Conveyance · Trade Install MAX unit-1346465 CON:12083 US:331648 RO:4796823 EQP-SI-09369 / EQP-CY-08720 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 31 | #7078115-CY Conveyance · Trade Install MAX unit-1346465 CON:12027 US:331650 RO:4796825 EQP-SI-09369 / EQP-CY-08722 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 31 | #7078119-CY Conveyance · Trade Install MAX unit-1346465 CON:12028 US:331651 RO:4796826 EQP-SI-09369 / EQP-CY-08723 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 31 | #7078101-CY Conveyance · Trade Install MAX unit-1346465 CON:12080 US:331645 RO:4796820 EQP-SI-09369 / EQP-CY-08717 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 31 | #7078104-CY Conveyance · Trade Install MAX unit-1346465 CON:12081 US:331646 RO:4796821 EQP-SI-09369 / EQP-CY-08718 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Tke | $360 |
| applied Mar 18 | #7076053-RF Refrigeration · Trade Installing two refrigeration systems in a freezer Status: Completed | Allpoints Heating And Fireplac | $23.1K |
#7075330-EL Electrical · Electrical Reworking existing warm room to -20C freezer space. Work includes adding 2 breakers, running MC, and adding 2 disconnects and connections to condensing units. Status: Completed | Precision Electric Group, Inc | $5.4K | |
#7074923-EL Electrical · Electrical Installing 2 undercabinet receptacles for fridges on the second floor. Status: Completed | Precision Electric Group, Inc | $2.3K | |
#7074935-EL Electrical · Electrical Converting 2 print rooms to mothers rooms located on level 6 and level 8. Work includes adding (12) receptacles and power to water heaters. Status: Completed | Precision Electric Group, Inc | $15.9K | |
#7074698-EL Electrical · Electrical There are (6) EV chargers and (1) credit card module being installed in the P2 level of the garage. [C.Kenefick 5/22/2025 - See permit 7081754 for completion of work.] Status: Completed | Precision Electric Group, Inc | $30.1K | |
| applied Feb 14 | #7069854-ME Mechanical · Trade Provide and install (2) new return air grilles. Status: Completed | Not published | $2.5K |
| applied Dec 3 | #7049165-CN Addition/Alteration · Building Install manufactured privacy enclosures within existing L-7 commercial office per plans Status: Completed | Not published | $250K |
#7063122-EL Electrical · Electrical Joint venture between Convergint and Precision Electric. Installing speaker strobes for phone booths. Status: Completed | Not published | $325 | |
| applied Oct 29 | #7048082-CN Addition/Alteration · Building Tenant Improvement add storage racks at Level 4 (Bristol Myers Squibb Warehouse) of existing commercial building per plan Status: Completed | Not published | $175K |
| applied Oct 21 | #7042494-CN Addition/Alteration · Building Construct tenant improvement to existing commercial building at level 6 room 632 (cold room) per plan. Mechanical included. Status: Completed | Not published | $265K |
| applied May 17 | #7025585-EL Electrical · Electrical Add a single 20AMP Circuit to existing Electrical Panel for the battery backup system. [12/2/24 BGO - Fee OK Approved Plan to add (1) 20A circuit to power battery chargers and selector switch installed by others]] Status: Completed | McKinstry Co LLC | $2K |
#7053803-EL Electrical · Electrical low voltage HVAC Energy Management controls system Status: Completed | Datskiy Electric LLC | $1.8K |