Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted October 31, 2024, with 46 permits through September 11, 2026, declaring $2,334,249 of work. Contractor on record: Cochran Inc.
Tenant improvement (Vue Biomed) at 4th Floor (south) of commercial building (Fairview Research Center) per plan.
Seattle permit records name Cochran Inc, Macdonald Miller Facility Solutions LLC and Cochran Electric as the contractors on this project, among 16 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
46 permits issued Oct 31 – Sep 11, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#7162335-EL Electrical · Electrical Joint venture between Convergint and Precision Electric Group. Installing 6 or less notification devices. Status: Completed | Not published | — | |
| applied Jun 10 | #7140082-ME Mechanical · Trade HVAC and fitting/piping modifications for research lab TI per plans. Status: Completed | Macdonald Miller Facility Solutions LLC | $45K |
#7156644-FS Fire Sprinkler and Suppression · Trade Modify the existing fire sprinkler system to accommodate the new walls and ceilings. Status: Completed | Columbia Fire | $4.8K | |
#7153963-EL Electrical · Electrical Power, lighting, and low voltage for minor modifications Status: Completed | Precision Electric Group, Inc | — | |
| applied Jul 1 | #7149049-CN Addition/Alteration · Building Construct interior non-structural alterations to research lab tenant at the 7th floor level of commercial building per plan. Status: Completed | Not published | $354K |
#7143805-EL Electrical · Electrical 421676 - PERFORM GENERATOR LOAD BANK[5/19/2026 JBC Permit Minmum Fee was incorrect, Electrical Manager credited original fee and added Inspection Only Fee][6/22/2026 JBC ok one time minimum permit fee] Status: Completed | Not published | — | |
#7143807-EL Electrical · Electrical 421677- PERFORM GENERATRO LOAD BANK Status: Completed | Not published | — | |
#7143809-EL Electrical · Electrical 421678 PERFORM GENERATOR LOAD BANK Status: Completed | Not published | — | |
#7137650-EL Electrical · Electrical Provide & install (1) Nema3r astronomic 30-amp time clock on roof Status: Completed | Precision Electric Group, Inc | — | |
| applied Mar 6 | #7132298-CN Addition/Alteration · Building Construct alterations to open up walls [[allowing work to be performed and inspected under separate conveyance and electrical permits]] then rebuild with offsets/overlaps - like for like - fire rated wall assembly subject to field inspection (STFI) Status: Completed | Not published | $55K |
#7133370-EL Electrical · Electrical JOB# 528270- INSTALL (1) NEW 120V OUTLET OFF EXISTING CIRCUIT FOR NEW KEY BOX POWER. Status: Issued | Cochran Inc | — | |
| applied Mar 3 | #7131723-CY Conveyance · Trade Install call button - 3636378 US306971 - Car 4 EQP-SI-09175 / EQP-CY-08365 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | TK Elevator | $46.3K |
#7130132-EL Electrical · Electrical Connecting furniture electrical components to circuits provided by others. Status: Issued | ANZAC Electric | — | |
#7128768-EL Electrical · Electrical Modifying existing HVAC controls systems. Status: Completed | Datskiy Electric LLC | — | |
| applied Jan 9 | #7124105-CY Conveyance · Trade Permanently remove fourth floor rear landing access. WO:3083203 Car: 4 US:306971 CONV:11688 EBS:316581 EQP-SI-09175 / EQP-CY-08365 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Tke | $20.6K |
#7124101-EL Electrical · Electrical Status: Completed | Cochran Inc | — | |
| applied Jan 5 | #7123583-RF Refrigeration · Trade Install refer piping from L4 up to roof. Status: Completed | Macdonald Miller Facility Solutions LLC | — |
| applied Oct 30 | #7107498-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Completed | Macdonald Miller Facility Solutions LLC | $183K |
#7123204-EL Electrical · Electrical We are installing (2) notification devices, (2) smokes, and (1) control relay for a 3rd floor TI as a joint venture with Cochran. Status: Issued | Not published | $9.7K | |
#7122192-EL Electrical · Electrical *Joint Venture with Cochran Electric* 4th Floor TI for Lab OPS area. Adding Speaker/Strobes for audibility. This work is associated with building permit 7109596-CN Status: Issued | Convergint Technologies | $1.2K | |
| applied Nov 12 | #7116242-EL Electrical · Electrical 4th floor TI. Adding speaker/strobes to the Restrooms and Lab OPS area. Status: Completed | Cochran Electric | $3.2K |
#7120135-FS Fire Sprinkler and Suppression · Trade ADD UPRIGHT SPRINKLERS IN ROOMS THAT ARE OPEN TO STRUCTURE, DEMO SPRINKLERS/PLUG OUTLETS IN ROOMS WHERE CEILING IS BEING DEMO'D AND RELOCATE EXISTING SPRINKLERS ON FLEXDROPS TO ACCOMODATE NEW CEILING LAYOUT. RELOCATED SPRINKLERS ON FLEXDROPS TO BE TIED UP UNTIL NEW CEILING GRID LAYOUT IS COMPLETE… Status: Completed | Smith Fire Systems | $11.2K | |
#7120069-EL Electrical · Electrical We are installing (6) monitor modules. Status: Completed | Not published | $4.7K | |
#7119958-EL Electrical · Electrical o (2) 3 Cat 6A cable 3D AV poke-thru locations (shielded) o (15) 1 Cat 6A cable 1D wireless access point locations o (11) 1 Cat 6 cable 1D wireless access point locations o (2) 1 Cat 6 cable 1D room scheduler locations o (7) 1 Cat 6 cable 1D camera outlet locations o (7) 2 Cat 6 cable 2D wall… Status: Completed | Cochran Inc | $9.4K | |
#7117814-EL Electrical · Electrical Small TI. Replacing (7) Cylinder downlights with (7) recessed down lights. Replacing (5) Pendant Lights With (5) new pendant lights. Status: Completed | Far West Technologies,Inc | $3K | |
#7116809-EL Electrical · Electrical Second phase of level 4 remodel, Rework of branch circuits along with new circuits from existing panels added to new lab benches, CSP's and wiremold. Rework of existing lighting controls and new lighting controls for 3 new offices spaces. Rework of existing lighting and install for approx. 15 new… Status: Completed | cochran inc | $175K | |
#7116036-EL Electrical · Electrical Installing (62) Cat 6 Cables Status: Completed | Cochran Inc | $68K | |
| applied Oct 7 | #7107210-CN Addition/Alteration · Building Tenant improvement (Vue Biomed) at 4th Floor (south) of commercial building (Fairview Research Center) per plan. Status: Completed | Kelby Mccorkle | $482K |
| applied Oct 1 | #7105514-ME Mechanical · Trade Provide HVAC modification, ductwork/diffuser modification, and air balancing, per plan. Status: Completed | Macdonald Miller Facility Solutions LLC | $35K |
#7112811-EL Electrical · Electrical Install (1) access control system enclosures, (9) devices, and associated cabling. Install (3) video surveillance system cameras. CAT6 cable and 120 VAC connections by others. Status: Completed | Cochran Electric | $72.4K | |
| applied Oct 1 | #7109596-CN Addition/Alteration · Building Tenant improvement (Vue Biomed) at 4th Floor (south) of commercial building (Fairview Research Center) subject to field inspection. Status: Completed | Not published | $181K |
#7111533-EL Electrical · Electrical Security door interface. Adding Relays to interface with Security Doors on the 4th Floor. Status: Issued | Cochran Electric | $700 | |
#7111381-FS Fire Sprinkler and Suppression · Trade ADD UPRIGHT SPRINKLERS IN ROOMS THAT ARE OPEN TO STRUCTURE, DEMO SPRINKLERS/PLUG OUTLETS IN ROOMS WHERE CEILING IS BEING DEMO'D AND RELOCATE EXISTING SPRINKLERS ON FLEXDROPS TO ACCOMODATE NEW CEILING LAYOUT. RELOCATED SPRINKLERS ON FLEXDROPS TO BE TIED UP UNTIL NEW CEILING GRID LAYOUT IS COMPLETE… Status: Completed | Smith Fire Systems | $12.1K | |
#7111219-EL Electrical · Electrical #528270 Add 59 new connections and install wire mold 4th floor. Rework lighting and add new lighting controls to work within new added spaces. rough in pathway in wall for low volt and data drops. Rework existing circuits and pull new circuits as needed for device loads. Install new twist lock… Status: Completed | cochran inc | $90K | |
#7108698-EL Electrical · Electrical Add branch power for new access control panels and door hardware Utilize existing panels with spare circuits Relocate power in conference room due to door shift Add [2] Exit signs due to demising wall Relocate lighting control switch in conference room due to door shift Reconfigure… Status: Completed | cochran inc | $48K | |
#7107871-EL Electrical · Electrical Telecommunications Project. 120v hardwired connection work Status: Completed | Day Wireless Communications | $29K | |
#7107374-EL Electrical · Electrical Installation of new cellular dialer for fire alarm monitoring. Status: Completed | Not published | $10K | |
| applied Aug 5 | #7098166-CN Addition/Alteration · Building Construct interior alterations to existing laboratory building at level 3 per plan. Status: Completed | Not published | $75K |
| applied Jul 21 | #7095800-SB Sign, Awning and Canopy · Trade Installation of 1 Non-Illuminated Blade Sign. 7/21/25 SS: Fees added for 1 sign circuit to include electrical on this permit. 8/8/25 SL Fees added for revision of plans. 8/18/25 SS: Revised plans approved. 12/15/25 SS: Permit sign details corrected to reflect sign is now illuminated. Status: Completed | Clearway Signs | $2K |
#7095414-EL Electrical · Electrical PERFORM GENERATOR LOAD ABNK Status: Completed | Not published | $500 | |
#7095422-EL Electrical · Electrical PERFORM GENERATOR LOAD BANK Status: Completed | Not published | $500 | |
#7087014-EL Electrical · Electrical PERFORM GENERATOR LOAD BANK Status: Completed | Not published | $500 | |
| applied Sep 30 | #7024367-ME Mechanical · Trade DEMO EXISTING LG EQUIPMENT SERVING THE LOBBY AREA. REPLACE WITH NEW TRANE VRF EQUIPMENT (FCU 1-7, ACCU-1, MA REMOTE CONTROLLERS, BC MAIN CONTROLLER, TWINNING KIT, FILTER BOXES. DUCTWORK TRANSITIONS TO MODIFY EXISTING DUCTWORK TO CONNECT TO NEW TRANE EQUIPMENT. RE-USE EXISTING REFRIGERATION PIPING… Status: Completed | Macdonald Miller Facility Solutions LLC | $300K |
#7067508-EL Electrical · Electrical Install (2) customer provided Wall Chargers for EV. JOB 1022076 Contact: Jason Regis 425-213-3698 Status: Completed | Prime Electric | $1.5K | |
| applied Dec 11 | #7060261-RF Refrigeration · Trade Demo existing LG VRF equipment serving the first floor lobby area and mezzanine garage level. Replace with new Trane VRF equipment. mechanical permit number 7020016-ME Status: Completed | Macdonald Miller Facility Solutions LLC | — |
#7054151-EL Electrical · Electrical JOB# 524283-5: Disconnect and reconnect connections to (12) replaced FCU's in the P1 garage and level 1 lobby. Relocate, replace and reconnect to (1) ACCU-1 mechanical unit (sections A and B) on the roof. Add (1) 20A, 208V, 1phase circuit to new mechanical BC controller on P1 garage. Status: Completed | Cochran Inc | $550 |