Commercial Electrical, Elevator, Hvac/Mechanical work permitted September 4, 2025, with 5 permits through July 13, 2026, declaring $397,614 of work. Contractor on record: 16d LLC.
Modernizing a MRL Traction car, new machine, controller, door operator, 3D door edge, fixtures and installing a new Snap cab interior EQP-SI-08125 / EQP-CY-07081 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC, Schindler Elevator Corporation and Northwest Fire Systems as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Sep 4 – Jul 13, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Jun 18 | #7142013-ME Mechanical · Trade Alterations to mechanical system on existing multifamily building, per plans. Status: Completed | Not published | $9.3K |
#7146488-EL Electrical · Electrical @ MARKETSIDE FLATS REPLACE ELEVATOR DISCONNECT. RELOCATE ELEVATOR UTILIZATION CIRCUITS OCPD TO MACHINE ROOM PANEL. UPGRADE MACH ROOM AND PIT LIGHTS TO LED. Status: Completed | 16d LLC | — |
| applied May 8 | #7142022-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7142013-ME Status: Completed | 16d LLC | $9.3K |
| applied Feb 11 | #7128684-CY Conveyance · Trade Modernizing a MRL Traction car, new machine, controller, door operator, 3D door edge, fixtures and installing a new Snap cab interior EQP-SI-08125 / EQP-CY-07081 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Schindler Elevator Corporation | $386K |
#7105041-EL Electrical · Electrical Upgrading the fire alarm panel monitoring from phone lines to cellular - installing Telguard cell device. Status: Completed | Northwest Fire Systems | $2.2K |