Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Roofing work permitted March 5, 2025, with 8 permits through October 13, 2026, declaring $963,821 of work. Contractor on record: Pye-Barker Fire & Safety.
Construct non-structural alterations to convert offices to residential units and storage room at ground floor level of mixed-use apartment building [RIANNA APARTMENTS] occupy per plan.
Seattle permit records name Pye-Barker Fire & Safety, Nortech Inc and D C Electric Inc as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
Commercial and multifamily, biggest first.
8 permits issued Mar 5 – Oct 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7167164-EL Electrical · Electrical Power supply replacement. Status: Issued | Contractor with Pro | — | |
| applied Aug 21 | #7159321-RF Refrigeration · Trade Installation of a total of five (5) Daikin split systems: Four (4) 1-ton, 1-to-1 split systems, each with one wall-mounted indoor unit. One (1) 3-ton multi-zone outdoor unit serving one 2-ton indoor unit and two 0.75-ton wall-mounted indoor units. Install new refrigerant line sets for all systems.… Status: Issued | Nortech Inc | $35K |
| applied Jul 29 | #7155408-EL Electrical · Electrical Convert office spaces into (5) residential units. New panels, devices and lighting per plans. [8/10/26 KEF - Plan set approved.] Status: Issued | D C Electric Inc | $95K |
| applied Jul 6 | #7151032-FS Fire Sprinkler and Suppression · Trade Add and remove pendent sprinklers as necessary to accommodate conversion of existing Group B office space within an existing 4-story apartment building into (5) new Group R-2 residential units at Level 1. No changes to existing underground supply, riser, cross mains, branch lines, or hydraulically… Status: Issued | Pye-Barker Fire and Safety | $15.5K |
| applied Jun 15 | #7148166-EL Electrical · Electrical Fire Alarm TI - Unit Conversion. Install 2 new horn strobes, 7 low-frequency horns, 1 power supply, and relocate existing devices based on the new floor plans. Status: Issued | Pye-Barker Fire & Safety | $15K |
| applied Mar 10 | #7059927-CN Addition/Alteration · Building Construct non-structural alterations to convert offices to residential units and storage room at ground floor level of mixed-use apartment building [RIANNA APARTMENTS] occupy per plan. Status: Issued | Not published | $750K |
#7096179-EL Electrical · Electrical Job number - 1023649 Description - Pre-wire door, mount controller, run conduit chases Contact - Kolten De Koker - 4258900338[7/21/2026 JBC Added Renewal to permit] Status: Completed | Prime Electric | $1K | |
#7073691-RR Roof · Roof Re-cover the roof with 60mil TPO to manufacturer specs Status: Completed | James King Roofing | $52.4K |