Commercial General Building, Electrical, Hvac/Mechanical, Roofing work permitted October 30, 2024, with 48 permits through October 23, 2026, declaring $3,635,458 of work. Contractor on record: Sequoyah Electric LLC.
3 outdoor VRF units and 1 split system.
Seattle permit records name Sequoyah Electric LLC, Froula Alarm Systems, Inc. and Auburn Mechanical as the contractors on this project, among 14 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 5 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
48 permits issued Oct 30 – Oct 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7168934-EL Electrical · Electrical Adding two 20amp breakers. One breaker for ADA Doors. One breaker for Auto Flush Toilets. Toilets will have two low-voltage transformers. Status: Issued | Contractor with Pro | — | |
#7168306-EL Electrical · Electrical Skyline Tent Status: Issued | Contractor with Pro | — | |
| applied Oct 5 | #7165807-EL Electrical · Electrical We are installing a new 400 amp service to replace the 200 amp service to the electrical shed. It will also feed a new silage mixer in the Zoo Doo Yard. We are installing spare conduits as well under the Zoo Doo Yard for future [10/13/26 BGO - Approved Service Plan] Status: Issued | Contractor with Pro | $30K |
#7166072-EL Electrical · Electrical Add (2) 60-amp circuits for Binturong Exhibit Status: Issued | Contractor with Pro | — | |
| applied Oct 2 | #7165625-RF Refrigeration · Trade We are replacing a combo box of walk-in freezer and walk-in cooler. Status: Issued | Contractor with Pro | $100K |
#7164356-RR Roof · Roof Replacing Shingles and TPO at the Woodland Park Zoo South Entry and Zoo Store Complex Status: Issued | Forma Construction | $328K | |
#7162898-EL Electrical · Electrical We are replacing a combo box of walk-in freezer and walk-in cooler and adding 2 circuits under 30 amps. Status: Issued | Nortech Inc | — | |
#7161292-EL Electrical · Electrical Provide & Install 200A Feeder at Conservation Aviary - SEQ #7313346 Status: Issued | Sequoyah Electric LLC | — | |
#7161283-EL Electrical · Electrical Provide power & data conduits from domestic water pump house to new man gate booth - SEQ #7318715 Status: Issued | Sequoyah Electric LLC | — | |
#7159928-EL Electrical · Electrical Provide & install (1) 200-amp feeder, (2) 20-amp circuits, and data conduit Status: Completed | Sequoyah Electric LLC | — | |
| applied Apr 30 | #7139668-ME Mechanical · Trade HOLDING BUILDING FOR LORIKEET BIRDS AND ZOOKEEPERS ATTENDING TO THE BIRDS. THE HVAC SYSTEM CONSIST OF A MITSUBISHI DUCTED SPLIT SYSTEM AND AN ELECTRIC DUCT HEATER TO HELP SUPPLEMENT HEAT, PER PLANS. Status: Completed | Auburn Mechanical | $108K |
#7145440-EL Electrical · Electrical There is an existing 225 amp disconnect (Federal Pacific Electric) that is tripping consistently. We are doing a like in king replacement. Status: Completed | Phase 3 Electric LLC | — | |
| applied May 26 | #7144765-RF Refrigeration · Trade Woodland Park Zoo Lorikeet HOLDING BUILDING FOR LORIKEET BIRDS AND ZOOKEEPERS ATTENDING TO THE BIRDS. THE HVAC SYSTEM CONSIST OF A MITSUBISHI DUCTED SPLIT SYSTEM AND AN ELECTRIC DUCT HEATER TO HELP SUPPLEMENT HEAT, PER PLANS. Status: Completed | Auburn Mechanical | $108K |
#7142856-EL Electrical · Electrical Extend 6 existing circuits - SEQ #7318183 Status: Completed | Sequoyah Electric LLC | — | |
| applied Mar 10 | #7131064-CN Temporary · Building Erect temporary stage speaker tower and cover for Woodland Park Zoo for intermittent concerts June - September 2026. All stage components are provided by stage company and assembled by professional crew. Owner responsible for integrity of temporary structures. Status: Issued | Not published | $75K |
#7137455-EL Electrical · Electrical Install conduit for data by others - SEQ #7318042 Status: Completed | Sequoyah Electric LLC | — | |
| applied Jul 23 | #7084919-CN New · Building Construct storage building for institutional campus [WOODLAND PARK ZOO] within city park [SEATTLE PARKS & RECREATION] occupy per plan. Status: Completed | Not published | $23.1K |
#7133724-EL Electrical · Electrical new smoke supervision system in new building Status: Completed | Froula Alarm Systems, Inc. | — | |
#7132628-EL Electrical · Electrical Add 350 AMP Feeder - SEQ #306466 Status: Completed | Sequoyah Electric LLC | — | |
#7132710-EL Electrical · Electrical (1) 20A DEDICATED RECEPTACLE. JOB# 830781. PM IS MOLLY PRICE 360-801-1052 Status: Completed | Veca Electric & Technologies, LLC | — | |
#7128311-EL Electrical · Electrical Status: Completed | Veca Electric & Technologies, LLC | — | |
#7126817-EL Electrical · Electrical Status: Completed | Sequoyah Electric LLC | — | |
#7122211-EL Electrical · Electrical Alter 2 Circuits - SEQ #7315897 Status: Issued | Sequoyah Electric LLC | $10K | |
#7118477-EL Electrical · Electrical 4 Zone audio system for new building 28 speakers, 1 amplifier, 1 wireless microphone, 1 digital signal processor Status: Completed | Streamline Solutions LLC | $47K | |
#7112288-EL Electrical · Electrical Holiday Light Show at Woodland Park Zoo Status: Issued | Not published | — | |
| applied Sep 5 | #7105292-EL Electrical · Electrical We are installing a new 600 Amp service disconnect on an existing building and replacing the existing manual transfer switch to an automatic transfer switch. [9/11/25 KEF - Plan set approved.] Status: Completed | Phase 3 Electric LLC | $53K |
#7104289-EL Electrical · Electrical Installing/repairing branch circuits for fiber and irrigation Status: Completed | Apex Electrical Group LLC | $10K | |
#7104390-EL Electrical · Electrical Install new 4 ton Split system in Tapir Exhibit Status: Completed | Macdonald Miller Facility Solutions LLC | $7.5K | |
| applied Aug 26 | #7103648-RF Refrigeration · Trade Installation of a split system heat pump to serve Tapir house. Status: Completed | Macdonald Miller Facility Solutions LLC | — |
#7101879-EL Electrical · Electrical Pull 11hardwired points and BACNET from Field Panel to Fan Wall Control Board. Add two Modules. Job 836212 Status: Completed | EC Electric | $2.7K | |
#7098891-EL Electrical · Electrical 1x Air Source Heat Pump Wiring, 1x Wiring for Heat Exchanger, 4x Pump Wiring Job 836344 Status: Completed | EC Electric | $15K | |
| applied Apr 23 | #7076313-ME Mechanical · Trade Provide and install 25-ton Heat Pump chiller, Buffer Tank, Expansion Tank, Air Separator, Glycol Feeder, Dire Coalescing Heat Exchanger, Chilled Water Pumps, Supply and Return Piping, Glycol, Fittings and material, per plan. Status: Issued | PSF Mechanical, Inc. | $490K |
| applied Apr 16 | #7072016-ME Mechanical · Trade Installation of a split system heat pump to serve Tapir house, per plans. Status: Completed | Macdonald Miller Facility Solutions LLC | $21.4K |
| applied May 13 | #7076334-CN Temporary · Building Erect temporary stage speaker tower and cover for Woodland Park Zoo for intermittent concerts 12 June - September 3rd 2025 per plans. All stage components are provided by stage company and assembled by professional crew. Owner responsible for integrity of temporary structures. Status: Issued | Not published | $75K |
#7088113-EL Electrical · Electrical Add 200amp feeder Reconfigure (2) 20amp circuits SEQ #306146 Status: Issued | Sequoyah Electric LLC | $4K | |
#7087134-EL Electrical · Electrical smoke control Status: Completed | Froula Alarm Systems, Inc. | $7K | |
#7087139-EL Electrical · Electrical access control and cameras Status: Completed | Froula Alarm Systems, Inc. | $35K | |
#7083227-EL Electrical · Electrical Perform a 1, 2 or 4 hour load bank test on standby Generator, disconnect building conductors, connect load bank, perform load bank test, land and torque building conductors. Status: Completed | Not published | $800 | |
#7081793-EL Electrical · Electrical Provide and install overhead J-hook cabling pathway supports, where necessary. Provide and install Category 6 data cabling in the following quantities: Level 1 ? (1) 1 Cat 6 cable 1D guest services kiosk ? (6) 1 Cat 6 cable 1D wireless access point locations ? (14) 2 Cat 6 cable 2D wall outlet… Status: Completed | Cochran Inc | $44.9K | |
#7077360-EL Electrical · Electrical SEQ# 306052 (1) 350A SERVICE & (5) 20A BRANCH CIRCUITS; [3/31/26 RN Renewal/Reinstatement fee added, 30A and 100A feeders added to permit] Status: Issued | Sequoyah Electric LLC | $10K | |
#7076655-EL Electrical · Electrical Install cell communicator Status: Completed | Froula Alarm Systems, Inc. | $1.5K | |
#7073585-EL Electrical · Electrical Install (2) heat trace circuits. Circuits from panel breakers to controller locations by others. Job# 835688 Status: Completed | EC Electric | $5.4K | |
| applied Jan 22 | #7066555-EL Electrical · Electrical Install new fire alarm system Status: Completed | Froula Alarm Systems, Inc. | $30K |
#7066374-EL Electrical · Electrical (1) 20A DEDICATED CIRCUIT. JOB # 830105. PM IS MOLLY PRICE 360.801.1052 Status: Completed | Veca Electric & Technologies, LLC | $1.5K | |
#7059055-EL Electrical · Electrical SEQ# 305293. ADD DISCO TO EXISITING SERVICE Status: Completed | Sequoyah Electric LLC | $15K | |
#7056552-EL Electrical · Electrical WildLanterns holiday event Status: Completed | Not published | — | |
| applied Nov 6 | #7055073-RF Refrigeration · Trade 3 outdoor VRF units and 1 split system. Status: Completed | Auburn Mechanical | $2.2M |
#7053951-EL Electrical · Electrical PV Rooftop installation of 3 array's totaling in 5.760 KW AC Status: Completed | Artisan Electric Inc | $40K |