Multifamily General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted October 30, 2024, with 25 permits through August 20, 2026, declaring $28,805,691 of work. Contractor on record: Schindler Elevator Corporation.
Establish use as & construct apartment structure occupy per plan
Seattle permit records name Schindler Elevator Corporation, Boone Electric and United Systems Mechanical, LLC as the contractors on this project, among 12 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
25 permits issued Oct 30 – Aug 20, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Aug 12 | #7157424-EL Electrical · Electrical This is a new construction project. We will be installing 8x EV Chargers in 'EV Ready' locations. All EV Chargers are 40A (32A) installed on an EV dedicated 600A 120/208 3ph panel. [8/20/26 KEF - Plan set approved.] Status: Completed | Juicer Energy Inc | $8K |
#7144955-EL Electrical · Electrical 129- dryer 30 amp circuits Status: Completed | Boone Electric | — | |
#7142539-EL Electrical · Electrical Installation of AES radio Status: Completed | Guardian Security Systems Inc | — | |
| applied Mar 26 | #7133923-SB Sign, Awning and Canopy · Trade Fabricate and install (1) canopy-mounted stainless steel channel letter sign (face-lit led illumination) to existing canopy structure. Fabricate and install (1) wall-mounted aluminum circular cabinet sign (face-lit & halo-lit led illumination) to existing wall surface. Fabricate and install (1)… Status: Completed | Waypoint Sign Company | $11K |
| applied Mar 20 | #7134405-CY Conveyance · Trade Temp Use - Car E3 7104739-CY (original Conveyance Permit) 60-day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two-way communication with operator at all times. Status: Issued | Schindler Elevator | $217K |
| applied Feb 26 | #7131108-CY Conveyance · Trade temp use permit - car E1 7104734-CY (original Conveyance Permit) 60-day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two-way communication with operator at all times. Status: Issued | Schindler Elevator Corporation | $228K |
| applied Jan 21 | #7125780-CY Conveyance · Trade Temp Use - Elev. #E3 7104739-CY (Conveyance Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times. Status: Issued | Schindler Elevator Corporation | $217K |
#7123506-EL Electrical · Electrical Status: Completed | Bosch Electric Inc | — | |
| applied Sep 4 | #7098831-ME Mechanical · Trade Add a chimney/flue in the north building as part of soil vapor extraction system located in basement of type 1 structure with the fan mounted on the roof per plans. Status: Completed | United Systems Mechanical, LLC | $90K |
#7113055-EL Electrical · Electrical Add heat trace thermostat with junctions. Final connection to building power to be completed by on site electrician under different permit. Status: Completed | Not published | $1.5K | |
| applied Sep 23 | #7108212-EL Electrical · Electrical Installation of rooftop Solar Photovoltaic System Consisting of 27.14kW DC/17.3kW AC - (46) QCells Q.PEAK DUO XL-G11 590. (1) SolarEdge SE17.3K-US. [9/30/25 BGO - Approved PV Plan Set] Status: Completed | Puget Sound Solar | $19.2K |
| applied Sep 11 | #7104737-CY Conveyance · Trade Install a traction elevator - E2 6883524-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Schindler Elevator Corporation | $228K |
| applied Sep 11 | #7104734-CY Conveyance · Trade Install a traction elevator - E1 6883524-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Schindler Elevator Corporation | $228K |
| applied Sep 11 | #7104739-CY Conveyance · Trade Install a traction elevator - E3 6883524-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Schindler Elevator Corporation | $217K |
#7097133-EL Electrical · Electrical Installation of low voltage controls and associated low voltage conductors for complete HVAC system and parking garage exhaust system controls. Status: Completed | United Systems Mechanical, LLC | $32K | |
| applied Jul 9 | #7094999-RF Refrigeration · Trade Refrigeration permit in conjunction with Mechanical Permit 7065671-ME. (14) split system heat pumps. Status: Completed | United Systems Mechanical, LLC | $15K |
| applied Mar 27 | #7065671-ME Mechanical · Trade HVAC for 7-story mixed use project, per plans. (Does not include unit venting/ERV's. Unit venting on separate permit.) Status: Completed | United Systems Mechanical, LLC | $1M |
| applied Mar 12 | #7074919-FS Fire Sprinkler and Suppression · Trade INSTALL A COMBINATION SPRINKLER / STANDPIPE SYSTEM TO PROTECT THE ENTIRE BUILDING. A CLASS 1 MANUAL WET STANDPIPE WILL BE INSTALLED IN THE EXIT STAIRWELLS, AND (1) ELECTRIC FIRE PUMP. Status: Completed | Smith Fire Systems | $411K |
| applied Jan 27 | #7061725-ME Mechanical · Trade Furnish and install in-unit ERV's with associated ductwork. No Common Area HVAC is included (permitted separately and performed by others) Status: Completed | Pacific One Construction Inc | $420K |
#7086673-EL Electrical · Electrical TANAGER CCTB. 5/26/2026 jnl renewal Status: Completed | Boone Electric | $38.5K | |
| applied Mar 26 | #7077475-EL Electrical · Electrical INSTALLATION OF FIRE ALARM SYSTEM IN MIXED USE BUILDING Status: Completed | Linx Integrated | $68.3K |
| applied Mar 26 | #7077492-EL Electrical · Electrical LOW VOLT ELECTRICAL FOR ACCESS CONTROL AND 2-WAY COMMUNICATION IN MIXED USE BUILDING [3-27-25 DR - Waved review, issued permit] [cb-job still ongoing extended expiration date] Status: Completed | Linx Integrated | $80K |
| applied Nov 13 | #7056123-EL Electrical · Electrical TELECOM AND MAIN ELECTRICAL FOR MIXED USE BUILDING[2/3/2026 JBC Extended / Renewed Permit for One Year until 1/29/2027] [ 3-27-26 BZ Revision Approved ] Status: Completed | Boone Electric | $3.1M |
#7054494-EL Electrical · Electrical GENERATOR Status: Completed | Boone Electric | $1K | |
| applied May 19 | #6883524-CN New · Building Establish use as & construct apartment structure occupy per plan Status: Completed | David Ottolino | $23.1M |