Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical, Sign work permitted January 14, 2025, with 4 permits through August 25, 2025, declaring $38,750 of work. Contractor on record: Titan Electric Inc.
Replacing exiting AC and gas furnaces with Mitsubishi Heat Pump and electric Air Handlers
Seattle permit records name Titan Electric Inc, Shannon Heights Heating, Inc. and Rainier Seattle Wa Cong Of Jehovah's Witnesses as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Jan 14 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7103442-EL Electrical · Electrical Replace two 50A 120/240v disconnects and install new wiring from disconnect to new outdoor HVAC units. Replace two 20A 120/240v disconnects and install new wiring from disconnect to new indoor HVAC units. Breakers are existing and wiring from the panel to the disconnects are not being replaced. Status: Completed | Titan Electric Inc | $1.8K |
| applied Aug 18 | #7102032-RF Refrigeration · Trade Replacing 2 furnace and AC units with 2 heat pumps units. This includes new refrigerant piping. Status: Completed | Not published | $15K |
| applied Feb 15 | #7067028-ME Mechanical · Trade Replacing exiting AC and gas furnaces with Mitsubishi Heat Pump and electric Air Handlers Status: Completed | Shannon Heights Heating, Inc. | $20K |
| applied Jan 14 | #7063882-SB Sign, Awning and Canopy · Trade Existing wood monument sign at property entrance is deteriorating and in need of replacement. The existing sign frame is 7.25'h X 10.8'w overall with a 5'x10' face. The end posts are mounted to a concrete pad apx 1' wide x 12' long. We intend to remove the existing sign, and replace it with a… Status: Completed | Rainier Seattle Wa Cong Of Jehovah's Witnesses | $2K |