Multifamily Electrical, Elevator work permitted February 4, 2025, with 6 permits through May 6, 2025, declaring $846,728 of work. Contractor on record: Vertical Dimensions.
Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, governors, door operating device and door detection device. No underground work required. EQP-SI-06808 / EQP-CY-05435 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1)
Seattle permit records name Vertical Dimensions and Mastercraft Electric, Inc. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Feb 4 – May 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 6 | #7084077-CY |
Commercial and multifamily, biggest first.
Conveyance · Trade
Elevator Cab Alterations Includes: Wall Panels, Handrails, Ceiling with Lights, Flooring and Cladding. EQP-SI-06808 / EQP-CY-05435 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1)
Status: Issued
| Vertical Dimensions |
| $28.6K |
| applied May 6 | #7084087-CY Conveyance · Trade Elevator Cab Alterations Includes: Wall Panels, Handrails, Ceiling with Lights, Flooring and Cladding. EQP-SI-06808 / EQP-CY-05436 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Issued | Vertical Dimensions | $30.4K |
#7081500-EL Electrical · Electrical Replacement Lighting Status: Completed | Mastercraft Electric, Inc. | $35K |
#7078985-EL Electrical · Electrical Addition of 1 new panel and feeder. As well as adding 5 new receptacles and 11 light fixtures. Status: Completed | Mastercraft Electric, Inc. | $86K |
| applied Feb 4 | #7068322-CY Conveyance · Trade Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, governors, door operating device and door detection device. No underground work required. EQP-SI-06808 / EQP-CY-05435 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Not published | $667K |
| applied Feb 4 | #7068323-CY Conveyance · Trade Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, governors, door operating device and door detection device. No underground work required. EQP-SI-06808 / EQP-CY-05436 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Not published | $667K |