Commercial Electrical, Elevator, Hvac/Mechanical work permitted February 28, 2025, with 5 permits through December 3, 2025, declaring $367,141 of work. Contractor on record: 16d LLC.
REVISED MACHINE ROOM DWG, ALTERATION TO ELEV CTRL, MOTOR, ENCODER, GVR, EMERGENCY POWER, CAR DR, HOISTWAY WIRING, LD-16 DR OPERATOR, 3D DR EDGE - CAR OPER PANEL CAR AND HALL FIXTURES, PIT LADDER, 2019 CODE PROVISIONS, NEW IMPERIAL MACHINE, INTERCOM, SEISMIC SWITCH. EQP-SI-07825 / EQP-CY-06757 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1)
Seattle permit records name 16d LLC, Guardian Security Systems Inc and TK Elevator as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Feb 28 – Dec 3, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Sep 17 | #7106989-EL Electrical · Electrical Building fire alarm system replacement. This is a modified fire panel replacement (replace the existing MXLIQ FACP with C-MOD FACP). Replace all existing SLC devices with new SLC devices, one for one swap. In dwelling units replace existing smoke detectors with audible bases with smoke /heat… Status: Completed | Guardian Security Systems Inc | $76.9K |
| applied Mar 31 | #7077998-CY Conveyance · Trade REVISED MACHINE ROOM DWG, ALTERATION TO ELEV CTRL, MOTOR, ENCODER, GVR, EMERGENCY POWER, CAR DR, HOISTWAY WIRING, LD-16 DR OPERATOR, 3D DR EDGE - CAR OPER PANEL CAR AND HALL FIXTURES, PIT LADDER, 2019 CODE PROVISIONS, NEW IMPERIAL MACHINE, INTERCOM, SEISMIC SWITCH. EQP-SI-07825 / EQP-CY-06757… Status: Completed | TK Elevator | $272K |
| applied Mar 4 | #7072700-ME Mechanical · Trade Install split unit in existing elevator machine room and nearby parking garage, per plan Status: Completed | Not published | $9.7K |
#7073361-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATION [11-4-25 D Rankin - Plan Review requested, reviewed documents and tapping existing feeder in elevator machine room panel to single disconnect located at strike side of door is approved subject to field approval.] [11-20-25 D Rankin - see email regarding… Status: Completed | 16d LLC | $8.8K | |
| applied Feb 28 | #7072702-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7072700-ME Status: Completed | 16d LLC | $9.7K |