Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical, Sign work permitted August 20, 2025, with 12 permits through August 26, 2026, declaring $1,243,420 of work. Contractor on record: pipe construction.
Electrical service and equipment replacement to support HVAC/ improvements to the school's mechanical system.
Seattle permit records name pipe construction, National Sign Corporation and Hargis Engineers as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
12 permits issued Aug 20 – Aug 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7141732-ME Mechanical · Trade Install approximately 150 feet of underground hydronic piping and cap for future use. For reference, the future use project is being permitted under # 7076090-ME. Status: Issued |
| Not published |
| $25K |
| applied Jul 8 | #7150551-SB Sign, Awning and Canopy · Trade INSTALL SINGLE FACE ILLUMINATED BUILDING SIGN. REPLACES EXISTING. 7/8/26 SS: In accordance with Master Use Permit (MUP) Variance, Static text image only. The display shall not scroll, stream or flash. No picture images, video display or motion graphics are allowed. Illumination to be controlled by… Status: Issued | National Sign Corporation | $19.4K |
| applied Sep 22 | #7107594-EL Electrical · Electrical Electrical service and equipment replacement to support HVAC/ improvements to the school's mechanical system. Status: Completed | Not published | $600K |
#7107412-EL Electrical · Electrical This is a Special Event Permit Application for our festival event on school property scheduled for 9/19 and 9/20 2025. Ready for inspection Friday 9/19 at 3:30. Status: Issued | Not published | — |
#7105995-BP Boiler/Pressure Vessel · Trade replacement of failing gas fired boiler. Future decarbonization plan required before final inspection. Status: Issued | pipe construction | $299K |
#7105999-BP Boiler/Pressure Vessel · Trade replacement of failing gas boiler. Future decarbonization plan required before final inspection. Status: Issued | pipe construction | $299K |
#7106001-BP Boiler/Pressure Vessel · Trade replacement of failing gas boiler. Future decarbonization plan required before final inspection. Status: Issued | pipe construction | $299K |
#7106005-BP Boiler/Pressure Vessel · Trade replacement of failing gas boiler. Future decarbonization plan required before final inspection. Status: Issued | pipe construction | $299K |
#7106017-BP Boiler/Pressure Vessel · Trade replacement of failing gas boiler Status: Issued | pipe construction | $299K |
#7106020-BP Boiler/Pressure Vessel · Trade replacement of failing gas boiler Status: Issued | pipe construction | $299K |
#7106030-BP Boiler/Pressure Vessel · Trade replacement of storage tank Status: Issued | pipe construction | $299K |
#7073224-BP Boiler/Pressure Vessel · Trade Replacement of a failing gas-fired boiler with modular gas-fired boilers. The future decarbonization plan includes installation of air to water heat pumps to serve the school's existing hydronic system. Future decarbonization plan required before final inspection. Status: Issued | Hargis Engineers | $300K |
In Seattle, biggest first.