Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Sign work permitted May 21, 2025, with 23 permits through July 14, 2026, declaring $12,374,272 of work. Contractor on record: Adept Mechanical Services Inc.
Plumbing system construction related to new three story addition at Alki Elementary School.
Seattle permit records name Adept Mechanical Services Inc, Johansen Mechanical and Columbia Fire as the contractors on this project, among 13 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
23 permits issued May 21 – Jul 14, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7152948-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
| applied May 14 | #7141915-SB Sign, Awning and Canopy · Trade This exterior signage will be installed at Alki Elementary School. The project details call for a pin mounted sign at the north canopy that states "ALKI ELEMENTARY SCHOOL". 6/9/26 SS: Application corrected to match submitted plans, sign details and area based fees added, original fees paid with… Status: Completed | Washington Best Finishes | $27K |
#7146194-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
#7146225-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
#7146226-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
#7146156-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
#7146165-BP Boiler/Pressure Vessel · Trade Plumbing system construction related to new three story addition at Alki Elementary School. Status: Completed | Adept Mechanical Services Inc | $5M | |
#7144166-EL Electrical · Electrical Installation of AES radio Status: Issued | Guardian Security Systems Inc | — | |
#7133401-BP Boiler/Pressure Vessel · Trade Plumbing Construction Scope for Alki Elementary Addition and Modernization. Status: Completed | Johansen Mechanical Incorporated | $5M | |
| applied Apr 8 | #7137361-FS Fire Sprinkler and Suppression · Trade REVISION TO ISSUED PERMIT 7072340-FS Status: Completed | Columbia Fire | $5K |
| applied Dec 15 | #7121020-EL Electrical · Electrical Replacement of the fire alarm system in the community center attached to Alki elementary school. Connecting the community center fire alarm devices to the new panel that is being installed in the elementary school via permit 7082674-EL. Status: Completed | Milne Electric Inc. | $10K |
| applied Jul 23 | #7096806-CN Addition/Alteration · Building Construct site improvements for pathways and playground to existing School (Alki Elementary School) per plan. Status: Issued | Not published | $1.1M |
#7126423-EL Electrical · Electrical Installing an Emergency Responder Communications Enhancement System (ERRCS) at Alki Elementary School. PowerCom job# 550511 Status: Completed | PowerCom, Inc. | — | |
| applied Dec 16 | #7120005-SB Sign, Awning and Canopy · Trade INSTALL (1) ST: D DAKTRONICS DISPLAY INSTALLED TO EXTERIOR NORTH ELEVATION OF BUILDING TO EXISTING BRICK. DISPLAY IS 34 7/8" TALL X 43 3/16" WIDE X 8 1/8" DEEP - PAINTED MATTE BLACK. 12/16/24 SS: In accordance with 3039297-SD Decision: 1. Limited to one single-faced sign. 2. Time of use is… Status: Completed | Evergreen Signs | $6.1K |
| applied Apr 28 | #7082674-EL Electrical · Electrical INSTALL FIRE ALARM SYSTEM THROUGHOUT BUILDING AT ALKI ELEMENTARY Status: Completed | Milne Electric Inc. | $10.1K |
#7106077-EL Electrical · Electrical Installing CAT6/CAT6A and Optical Fiber telecom system in new school. Status: Completed | The Integrated Tech Group Inc | $251K | |
| applied Jul 30 | #7099178-FS Fire Sprinkler and Suppression · Trade Install Captive Aire TANK Fire Suppression System into kitchen hood Status: Completed | Vulnix Fire Protection | $1K |
| applied Feb 26 | #7072340-FS Fire Sprinkler and Suppression · Trade Add a wet and dry system to new 3-story school/gym. Add a wet system to existing Community Center attached to new 3-story school. Status: Completed | Columbia Fire | $497K |
| applied Jul 16 | #7096366-RF Refrigeration · Trade Provide refrigeration pipe from rooftop ASHP's to FCUs. Provuide refrigeration pipe from Rooftop condensing unit to elevator room ductless Mini split. mechanical under 6946329-PH Status: Completed | Johansen Mechanical | $19.8K |
| applied Jul 16 | #7096367-RF Refrigeration · Trade Install Refrigerating pipe for Community Center TI VRF system mechanical under 6946329-PH Status: Completed | Johansen Mechanical | $28.7K |
| applied Jul 7 | #7094214-EL Electrical · Electrical Installation of 40 KW AC solar system on roof commercial building [7/14/2025 BGO - Approved PV Plan Set] [2/2/26 BGO - Approved Revision] Status: Completed | Solterra Global LLC | $106K |
| applied Jun 26 | #7093418-RF Refrigeration · Trade Install 2 condensing units & 2 evaporator coils for walk-in cooler/freezer boxes. Status: Completed | Refrigeration Unlimited LLC | $32K |
#7087175-EL Electrical · Electrical DDC controls install Job 836181 6/16/2026 jnl renewal Status: Completed | EC Electric | $316K |