Commercial Electrical, Elevator, Hvac/Mechanical work permitted April 9, 2025, with 6 permits through August 31, 2026, declaring $252,435 of work. Contractor on record: 16d LLC.
Modernization of elevator to include: Controller, Tank Unit, Fixtures, Door Operator, 3-D Safety Edge. EQP-SI-04384 / EQP-CY-00878 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC, Puget Sound Elevator and Custom Electrical Services, LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Apr 9 – Aug 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
| applied Aug 13 |
#7150442-ME Mechanical · Trade Alterations to mechanical system on existing multifamily building, per plans. Status: Completed |
| Not published |
| $8.2K |
| applied Jun 29 | #7150448-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7150442-ME Status: Completed | 16d LLC | $8.2K |
#7146239-EL Electrical · Electrical For the purpose of elevator modernization: Install panel relay card and machine room smoke detector Status: Issued | 16d LLC | — |
#7146245-EL Electrical · Electrical @ AraVita - Replace elevator disconnect. Relocate elevator utilization circuits OCPD to machine room panel. Upgrade machine room and pit lights to LED Status: Completed | 16d LLC | — |
| applied Mar 25 | #7134920-CY Conveyance · Trade Modernization of elevator to include: Controller, Tank Unit, Fixtures, Door Operator, 3-D Safety Edge. EQP-SI-04384 / EQP-CY-00878 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Puget Sound Elevator | $242K |
#7079891-EL Electrical · Electrical Swap out bedroom and living room, duplex outlet. Reinstall existing light fixtures Status: Completed | Custom Electrical Services, LLC | $2.1K |